Works Department Tender
... More
The Works Department has issued a formal invitation for competitive bids for Improvement Of Road From Beltukuri -bhaleswar-barkothi Such As Renewal Coat Of Sdbc From 0/700 Km To 5/00 Km In The District Of Nuapada For The Year 2022-23 in Nuapada, Odisha, with an estimated contract value of Rs. 53,57,209. The bid opening date for this tender is 03-06-2022 and the last date for bid submission is 13-06-2022. Interested bidders for Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
Refer DocumentsDocument Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CERWI_78167_1Bid Award Id
ViewTender No
RWNPD-03/2022-23(Online)Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing , laying , spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness , hand packing , rooling with three wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of Moorum / Gravel / /binding matarials to fill up the interstices of corse aggregate, watering and compacting to the required density including hire and running charges of PRR including cost, conveayance, royalty and taxes of all materials required for work as per specification and direction of Engineer-in- Charge
-
-
-
... More
WBM Gr.-II
19.35
-
1837.55
... More
Providing & laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MOSRT&H Specification for Road & Bridge works (4th Revision)(A/R-2006 page-175 item No-47).
328.95
-
10524.5
... More
Road marking with hot applied thermoplastic compound with reflector singing glass beads on bitumen surface @ 250gm/Sqm with all material ,labour T&P etc. complete. as per specification and direction of Engineer-in- Charge
1500
-
574.94
... More
Cleaning the existing granular base/B.T. surface including removal of binding materials and other foreign materials with wire brushes etc. complete as direction of E.I.C.
12900
-
3.7
... More
Providing and laying surface dressing as wearing course consisting of a layer of Bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 KN Static roller including cleaning the road surface as per Technical Specification clause 506.(First Coat Surface Dressing) including hire and running charges of PRR including cost, conveayance, royalty and taxes of all materials required for work as per specification and direction of Engineer-in- Charge
258
-
105.84
... More
Flank dressing to proper camber to proper slope and camber including cost of all labour, T&P etc as direction of E.I.C.
6450
-
4.89
... More
Labour for spreaing moorum and compacting to meet required compaction including cost, conveayance, royalty and taxes of all materials required for work as per specification and direction of Engineer-in- Charge
750
-
230.96
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements