Water Resources Department Tender
... More
The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Construction Of C.c. Lining From Rd.60.00m To 120.00m Of Saipala Distributary Of Saipala Irrigation Project For The Year 2022-23 in Nuapada, Odisha, with an estimated contract value of Rs. 7,10,244. The bid opening date for this tender is 21-04-2022 and the last date for bid submission is 30-04-2022. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
Refer DocumentsDocument Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CEBMT_77050_1Bid Award Id
ViewTender No
e-Procurement Notice No.(NID)01/2022-23Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling in foundation & plinth with excavated earth well watered & rammed in 23.50 cm thick ln layers with all leads, lifts & delifts, T&P required for the work & all labours etc. complete as per direction of the Engineer- in -charge
72
-
104.9
... More
Providing weep holes in brick masonry/plain/reinforced concrete abutment, wing wall /return wall with 100mm dia A.C. pipe extending through the full width of structure with slop of 1(V):20(H) as per design & drawing including all cost, conveyance & royalty etc complete with all labour & T&P required for the work and as per direction of the Engineer-in-charge.
8.8
-
102.5
... More
Earth work in excavation of foundation in all kind of soil including hard moorum, stoney earth mixed with boulders (except sheet rock and boulders requiring blasting) with all leads, lifts and delifts including dressing and leveling the bed & slopes & depositing the excavated materials at places away from the work site with all leads, lifts and delifts including cost of all labours, T&P & dewatering if required for the work etc. complete as per direction of the Engineer-in-charge.
104.4
-
184.7
... More
Cement Concrete (1:2:4) with 12mm crusher broken Chips of approved quality from approved quarry free from weathered skin surface and any other deleterious materials having uniform colour and texture for concrete lining in the bed & slopes of canal including cost, conveyance, royalty and all other taxes of all materials to the site of work, T&P finished with all leads, lifts, delifts, watering & curing etc. complete with all labour and mixing by manually & placing in position & compacting etc. complete as per direction of the Engineer-in-charge
73.73
-
5495.3
... More
Cement Concrete (1:3:6) with 40mm crusher broken Metal of approved quality from approved quarry free from weathered skin surface and any other deleterious materials having uniform colour and texture for concrete lining in the bed & slopes of canal including cost, conveyance, royalty and all other taxes of all materials to the site of work, T&P finished with all leads, lifts, delifts, watering & curing etc. complete with all labour and mixing by manually & placing in position & compacting etc. complete as per direction of the Engineer-in-charge
52.2
-
4154.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements