The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Slope Protection Work To River Bagh Near Village Kandhuriapada Under Manupali Gp in Boudh, Odisha, with an estimated contract value of Rs. 25,80,000. The bid opening date for this tender is 10-12-2021 and the last date for bid submission is 23-12-2021. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CEBMT_73657_1Bid Award Id
ViewTender No
e- Procurement Notice No 14/2021-22Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing weep holes in Brick masonary/plain/ R.C.abutment, wing wall/return wall with 100mm.dia A.C.pipe extending through the full width of the structures with slope of 1V:20H towards drawing face etc.with cost, all labour T&P cost,carriage,royality and all other taxes of all required materials to complete the item of work in all respect as per the direction of the Engineer-in-charge.
100.32
-
153.8
... More
Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 5.00Km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5cm. layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes of all heights including construction,maintenance,watering and lighting of haul road including cost of royality , labour cess, etc. complete as per the direction of Engineer-in-Charge
3040
-
147
... More
Filling in foudation & plinth with sand well watered and rammed including cost, conveyance , and royality of all materials etc. complete as per direction by the Engineer-in-Charge.
37.39
-
338.2
... More
Watering Earthwork upto OMC condition and compaction by sheep foot rollers and dozer in layers not exceeding 22.5cm to 95% dry density including hire and running charges of all the machineries complete as per the direction of Engineer-in-Charge ( Measurement to be taken on the finished compacted section of the fill under OMC condition)
3040
-
26.9
... More
Earth work in excavation of foundation in hard soil or gravelly soil with in initial lead and lift of 50mts and 1.5mts respectively including dressing and levelling the bed and depositing the excavated earth at place away from the work site with all leads and lifts including cost of all labour, T&P and dewatering if required for the work etc; complete and as per specification and direction of Engineer-in-Charge.
171
-
188.8
... More
Rigid and smooth centering and shutering for RCC Works and dismantling them after casting including cost of materials complete in Base concrete as directed by the Engineer-in-charge.
729.6
-
101.7