Water Resources Department Tender
... More
The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Weather Coat Painting And Minor Repair To The Back Side Of Institute Building Of Walmi For The Year 2024-25 in Cuttack, Odisha, with an estimated contract value of Rs. 9,88,445. The bid opening date for this tender is 15-02-2025 and the last date for bid submission is 24-02-2025. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 9,900Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WALMI_110718_1Bid Award Id
ViewTender No
WALMI-2/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Second floor
863.74
88
76095.49
... More
Ground floor
1519.16
5
7899.63
... More
First floor
1541.85
103
159118.92
... More
Ground floor
1611.82
99
160537.27
... More
First floor
86.72
59
5142.5
... More
Second floor
809.88
7
5750.15
... More
Ground floor
92.66
186
17262.56
... More
Finishing wall surface with water bond cement primer of approved make and finished smooth and even surface to receive painting etc. Including the cost of labour, materialetc. As per the direction of Engineer-in-charge.
-
-
-
... More
Third floor
302.96
110
33598.26
... More
Scraping old paint with scraper,sand papering &washing with soap water including scaffolding charges upto 5 mtr height including cost of labour, T&P etc as per direction of engineer in Charge
-
-
-
... More
Ground floor
1611.82
81
131040.97
... More
Third floor
302.96
91
27781.43
... More
Removing old lime or cement plaster from walls including rakingout joints 12mm dep & removing the debris with 50m. Lead Including the cost of labour,materialetc. As per the direction of Engineer-in-charge.
-
-
-
... More
First floor
1541.85
84
130440.51
... More
Painting 2coat with any approved paint on old/new wood work including the cost of labour, T&P , materials. As per the direction of Engineer-in-charge.
199.26
185
36863.1
... More
Third floor
29.42
65
1921.13
... More
Third floor
273.54
7
1942.13
... More
12 mm thick cement plaster (1:6) over brick work Including the cost of labour,materialetc. As per the direction of Engineer-in-charge. per sqm.
-
-
-
... More
Cement concrete (1:2:4) with 6 mm size crusher broken hard granite metal including cost of labour, materials,etc complete in all respect as per the direction of Engineer-in- Charge.
1.96
7550
14799.37
... More
First floor
1455.13
5
7566.68
... More
Primming 1 coat with any approved primer including the cost of labour materials, cost of conveyance etc. including the cost of labour, T&P, materials As per the direction of Engineer-in-charge.
199.26
74
14904.65
... More
First floor
86.72
194
16823.68
... More
Second floor
863.74
107
92420.18
... More
Wall coating two coat with weather coat of approved shade on wall surface to give an even shade including cost of brushes,putty,sand paper, labour,materials etc asper direction of Engineer- in-Charge.
-
-
-
... More
Providing ,fitting & fixing of Aluminium fixed window/ ventilators made up of with Aluminium section no- 9210 &9207 as single groove & double groove respectively as horizontal & vertical member & section no-4660 as tappered clip for fixing of 5 mm thick black glass including all cost, conveyance, labour,T&P etc.
5.48
3810
20881.54
... More
Scraping old paint with scraper,sand papering &washing with soap water including scaffolding charges above 5 mtr height including cost of labour, T&P etc as per direction of engineer in Charge
-
-
-
... More
Second floor
53.86
62
3350.09