Water Resources Department Tender
... More
The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Nid-138- Improvement To Gop Branch Canal Near Village Natapur. in Puri, Odisha, with an estimated contract value of Rs. 10,25,955. The bid opening date for this tender is 27-12-2024 and the last date for bid submission is 05-01-2025. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 10,300Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Nid-138- Improvement To Gop Branch Canal Near Village Natapur.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CELBB_108750_12Bid Award Id
ViewTender No
e-Procurement Notice No.- 07 of 2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork in all kinds of soil except sand, sandy or slushy soil in borrow area by mechanical means and transportation of excavated earth by mechanical means with all leads, lifts, delfts, rehandling, conveyance, royalty, cess, including loading and unloading the same on prepared and approved surface including rough dressing and breaking the clods to maximum 5 cm. to 7 cm. in size and laying in layers not exceeding 22.5 cm.layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area with labour, T & P etc. complete as per direction of the Engineer-in-charge. (Earth will be arranged by the bidder at his own cost and risk. Earth should be free from clods, roots, brickbats and other debris.. Measurement of the fill to be taken on the finished level section) only
645.84
224
145055.66
... More
Clearing and grubbing road land including uprooting rank vegetation, grass, brushes, shrubs, sapling and trees girth up to 300 mm (Light jungles) & removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking the serviceable materials to be used or auctioned up to a lead of 1000 Meters including removal and disposal of top organic soil not exceeding 150mm in thickness etc. complete as per direction of the Engineer-in-charge.
1560
2
4212
... More
Earth work excavation in foundation in all types of soil including rough dressing and leveling the bed and depositing the excavated earth away from work site and dewatering removing bushes,stumps and any other foreign materials from working areas as well as from trenches with all leads, lifts , delifts, conveyance, royalty, and labour , T & P & cess etc. and breaking the clods to maximum 5cm. to 7cm. in size and laying in layers not exceeding 30cm. in depth and leveling the earth with all labour, T&P, cess etc.complete as per specification & direction of the Engineer-in-charge.
244.66
201
49323.46
... More
Filling bitumen and cement and jute fiber in expansion joints inclusive cost of materials , bitumen and cement proportion (3:1) including cleaning before pouring 12mm to 25mm and 15cm. Depth with hire & running charges of all machineries with all labour & T&P required for the work etc. complete in all respect as per direction of the Engineer-in-charge.
225.28
14
3221.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements