Water Resources Department Tender

... More
The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Weather Coat Painting And Minor Repair To The Front Side Of Institute Building Of Walmi For The Year 2024-25 in Cuttack, Odisha, with an estimated contract value of Rs. 9,42,167. The bid opening date for this tender is 15-02-2025 and the last date for bid submission is 24-02-2025. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Water Resources Department - WRD Tender

Works
Paints and Enamels
Eprocure
Opening Date15 Feb 2025
Closing Date24 Feb 2025
Tender Amount₹ 9,42,167 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Painting two coat with any approved paint to old iron work including the cost of labour, materials,T&P as per the direction of Engineer-in-Charge.

19.6

185

3637.76

... More
Ground floor

1636.91

99

163036.24

... More
Ground floor

1425.69

5

7413.59

... More
Supplying all materials , Labour, & T & P for repairing, fitting & fixing of M.S window grills includins cost of labour required for the complete in all respect as per direction of Engineer in charge .

7.35

411

3022.32

... More
First floor

93.15

194

18071.1

... More
Second floor

78.06

202

15768.12

... More
Scraping old paint with scraper,sand papering &washing with soap water including scaffolding charges upto 5 mtr height including cost of labour, T&P etc as per direction of engineer in Charge

-

-

-

... More
Third floor

20.01

65

1306.65

... More
Second floor

993.56

107

106310.92

... More
Second floor

915.53

7

6500.26

... More
First floor

1312.42

103

135441.74

... More
Removing old lime or cement plaster from walls including rakingout joints 12mm dep & removing the debris with 50m. Lead Including the cost of labour,materialetc. As per the direction of Engineer-in-charge.

-

-

-

... More
First floor

1312.42

84

111030.73

... More
Second floor

78.06

62

4855.33

... More
Third floor

20.01

210

4210.1

... More
Ground floor

211.22

56

11933.93

... More
Third floor

258.99

7

1838.83

... More
Third floor

279

91

25584.3

... More
Second floor

993.56

88

87532.64

... More
Scraping old paint with scraper,sand papering &washing with soap water including scaffolding charges above 5 mtr height including cost of labour, T&P etc as per direction of engineer in Charge

-

-

-

... More
First floor

93.15

59

5523.8

... More
First floor

1219.27

5

6340.2

... More
Finishing wall surface with water bond cement primer of approved make and finished smooth and even surface to receive painting etc. Including the cost of labour, materialetc. As per the direction of Engineer-in-charge. (Make-Berger/Asian paint)

-

-

-

... More
Cement concrete (1:2:4) with 6 mm size crusher broken hard granite metal including cost of labour, materials,etc complete in all respect as per the direction of Engineer-in- Charge.

2.38

7550

17970.67

... More
Third floor

279

110

30941.1

... More
Priming one coat with any approved primer to old iron work including the cost of labour, materials,T&P as per the direction of Engineer-in-Charge.

19.6

74

1466.08

... More
Ground floor

1636.91

81

133080.78



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.