Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 7,200Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CEBMB_60869_19Bid Award Id
ViewTender No
EE-CHID-01/2020-21Tender Authority
Water Resources Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation in canal in all kind of soil by manual means including dressing and leveling the bed to design section and disposal of excavated soil away from the work site with all leads, lifts, and delifts including dewatering, shoring, shuttering and propping of bullah piles and construction of coffer dam if required and belling out water with all cost, conveyance, labour and all other taxes & cess etc. Complete but excluding GST with all T&P and supervision charges etc as per the approved drawing, design & specification & direction of the Engineer-in-charge.
153.6
-
110.8
... More
Earth work in excavation of foundation in all kind of soil by manual means including dressing and leveling the bed to design section and disposal of excavated soil away from the work site with all leads, lifts, and delifts including dewatering, shoring, shuttering and propping of bullah piles and construction of coffer dam if required and belling out water with all cost, conveyance, labour, cess and all other taxes of material etc. Complete with all T&P and supervision charges etc complete but excluding GST as per the approved drawing, design & specification & direction of the Engineer-in-charge.
43.79
-
178.6
... More
Filling and spreading of sand in foundation and plinth with good quality of sand of approved quality free from any objectionable materials with all leads lifts and delifts etc including well watered and rammed as per drawing and design by manual/machanical means with cost, conveyance, royalties ,cess , all taxes of all materials, labour,T&P etc complete but excluding GST as per specification and direction of Engineer-in-charge.
17.82
-
291.2
... More
Cement concrete (1:3:6) with 40mm size hard granite crusher broken chips of approved quality free from weathered skin surface or any other deleterious materials for R.C.C. works including hoisting and laying with all leads, lifts & delifts including cost,conveyance, royalty & taxes etc. of all materials, all labour charges, T&P , watering and curing, compacting with Vibrator, B & O.C. Workers Welfare Cess excluding GST of Material etc. complete as directed by the Engineer-in-charge.
39.13
-
4267.1
... More
Cement concrete (1:2:4) with 12mm size hard granite crusher broken chips of approved quality free from weathered skin surface or any other deleterious materials for R.C.C. works including hoisting and laying with all leads, lifts & delifts including cost,conveyance, royalty & taxes etc. of all materials, all labour charges, T&P , watering and curing, compacting with Vibrator, B & O.C. Workers Welfare Cess excluding GST of Materials etc. complete as directed by the Engineer-in-charge.
58.66
-
5568.7
... More
Reinforced Cement Concrete of nominal mix / design mix of M-20 Grade having specified characteristics compressive strength of 20N / mm2 in design mix with minimum quantity of cement as specified in I.S / I.R.C. code of 150mm cube at 28 days curing after mixing and test conducted in accordance with relevant clauses of I.S - 516 / I.R.C.-78 using Crusher broken hard granite coarse aggregate 20mm downgraded and proportion as specified in I.S. 456 / I.R.C. 21 Code and subject to mix design in conformity to the grading and proportion of different materials of concrete in structures as specified in the relevant codes of approved quantity obtained from approved quarry and using minimum quantity of cement 3.47qntl. per cum (as per nominal mix) of tested and approved quality free from weathered skin surface and any other deleterious materials, uniform colour and texture with all leads, lifts and delifts including cost, carriage, royalties, Cess and taxes of all materials excluding GST, dewatering, mixing and vibrating for compaction by mechanical means and providing grooves or beads wherever necessary including cost, carriage of water, watering & curing, T&P, hire and running charges of all machineries, labour and supervision charges including mobilization and demobilisation and working of machineries etc with cost of construction and maintenance of cofferdam and diversion arrangement and removal required in complete as per drawing, specification and direction of the Engineer-in-charge.
5
-
4414.2
... More
Straightening, coiled or bend up M.S. or HYSD bars of SAIL make confirming to grade fe-250 or fe-415 of tested and approved quality, cutting, bending, lapping, sitting, welding etc and confirming I.S. Specification and jointing if necessary by lapping and tying the grills and placing in position in ties chairs and spaces as required for fabrication and fixing of reinforcement for RCC works as per the approved design with all leads and lifts from bending yard to placement spot including cost and conveyance of M.S. or tor-steel bars and binding wire of 18 to 20 gauges etc complete (Weight of binding wire has not been considered for payment - standard co-efficient of different sizes of the steel shall be considered and welding and lapping shall confirming to relevant clauses of I.S. code) including cost of all labours, cess, T&P and supervision charges, all taxes etc complete but excluding GST as per design, drawing and direction of the Engineer-In-charge.
5
-
6161.5
... More
Providing rigid & smooth centering & shuttering and form work for concrete works, both faces of c.c wall unexposed surfaces of foundation, block joints etc with F1 finish using steel shutter plates, rigidly fixed including false work, dismantling them after casting and finishing & making good to the surface where necessary with all labour and T&P including cost, conveyance, cess, all taxes of all materials and supervision charges etc. complete but excluding GST as per approved drawing, design, specification and direction of the Engineer-in- charge.
141.98
-
435
... More
Providing rigid & smooth centering & shuttering and form work for reinforced concrete works, both faces of c.c wall unexposed surfaces of foundation, block joints rigidly fixed including false work, dismantling them after casting and finishing & making good to the surface where necessary with all labour and T&P including cost, conveyance, cess, all taxes of all materials and supervision charges etc. complete but excluding GST as per approved drawing, design, specification and direction of the Engineer-in- charge. (For RCC slabs)
9.93
-
427.5
... More
Providing rigid & smooth centering & shuttering and form work for reinforced concrete works, both faces of c.c wall unexposed surfaces of foundation, block joints rigidly fixed including false work, dismantling them after casting and finishing & making good to the surface where necessary with all labour and T&P including cost, conveyance, cess, all taxes of all materials and supervision charges etc. complete but excluding GST as per approved drawing, design, specification and direction of the Engineer-in- charge. (For Plinth)
14.58
-
103.1
... More
Back filling to wall lining/ foundation and plinth with good quality of excavated earth available from foundation excavation with well watered and rammed including all cost, conveyance, cess and taxes of materials excluding GST, labour charges and T&P etc complete with all leads, lifts, delifts etc as per specification and direction of the Engineer-in-charge.
35.31
-
99.2
... More
Laying and fixing in position of 150mm R.C.C. spun pipes NP3 class conforming to ISI standard with collar joints filled in cement mortor (1:3) with necessary twisted and coal tarred hempyam including cautting and finishing the same, as per approved drawing including all cost, conveyance, royalty, cess and all other taxes of all materials excluding GST required for the work , all albour charges for loading, unloading, curing and laying in position, T&P with all leads, lifts and delifts of all materials dewatering if any including making the coffer dam if required as per the specification and direction of Engineer-in-Charge.
24
-
317.1
Evaluation Notes How It Works ?