Water Resources Department Tender
... More
The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Improvement Of Mallikpada Mip In Phulbani Block Of Kandhamal District Under Nabakrushna Choudhury Secha Unnayana Yojana (erm) For The Year 2024-25 in Kandhamal, Odisha, with an estimated contract value of Rs. 16,62,000. The bid opening date for this tender is 06-02-2025 and the last date for bid submission is 15-02-2025. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Water Resources Department - WRD Tender
Opening Date6 Feb 2025
Closing Date15 Feb 2025
Tender Amount₹ 16,62,000
Costs
EMD
₹ 16,700Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMIB_110056_1Bid Award Id
ViewTender No
BID IDENTIFICATION NO-13/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Rough stone dry packing in aprons and revetments to all height with hard broken granite stone of size 30cm and above in all direction weighing 140Lbs/cft and above of approved quality, quarried and free from weathered skin including filling the interstices with small stones including cost, conveyance, royalty and all other taxes of all materials required for the work to proper slope and level etc, with supply of all labour and T&P required for the work etc, complete in all respect as directed by the Engineer-in-charge. (1/6th. Volume will be deducted towards voids)
72.95
1052
76793.74
... More
Filling of foundation with the excavated earth with all leads and lifts, delfts including watering and ramming in layers complete in all respect etc. completed as directed by the Engineer in charge.
22.14
150
3332.07
... More
Dismetaling and removing Cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead per 1 sqm. including cost of all T&P materials and labour required for this item etc. complete as directed by the Engineer in charge.
63.35
840
53214
... More
Dismetaling brick or stone masonry in lime or cement mortar above 3 m height including stacking the useful materials for reuse and removing the debries away from work site with all leads and lifts as directed by the Engineer in charge.
103.78
1576
163645.49
... More
Supplying, straightening, cutting, bending, binding and tying the HYSD bars and placing in position as reinforcement and anchoring including lapping where necessary, cost of HYSD bars & binding wire with all leads, lifts for bending yard to placement point including cost, conveyance, labour, T&P & all taxes required for this item etc. complete as directed by the Engineer-in-charge.
14.4
8674
124916.26
... More
Earth work in hard or gravelly soil with all leads and lifts, delfts and depth of cutting to proper slope and level including rough dressing and breaking the clods to maximum 0.30 cm (1’) in depth and depositing the excavated earth on bank to proper embankment and profile with all leads and lifts labour and depositing the balance spoil away from work site with all leads and lifts as directed by the Engineer in charge (Measurement is to be taken on finished level section)
495.48
225
111854.61
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements