The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Construction Of Foot Bridge Infront Of R.i . Office , At Rd.650 M. Of Tentalabahal Distributary Of Gip For The Year 2023-24. in Debagarh, Odisha, with an estimated contract value of Rs. 4,72,571. The bid opening date for this tender is 20-10-2023 and the last date for bid submission is 06-11-2023. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Water Resources Department - WRD Tender
Opening Date20 Oct 2023
Closing Date6 Nov 2023
Tender Amount₹ 4,72,571
Costs
EMD
₹ 4,800Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CEBBS_95753_8Bid Award Id
ViewTender No
SEDID-02/2023-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete (1:1.5:3) with 12mm hard granite crusher broken chips including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of all machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge.
10.08
80283
7964.6
... More
Supplying, cutting, bending and binding and tying the HYDS bars placing in position as per drawing and tchnical specification including cost ,conveyance, taxeses of all materials and cost of all labours etc. complete as per the direction of Engineer-in-charge.
8.15
72871
8941.3
... More
Cement concrete (1:2:4) with20mm down graded size hard granite crusher broken chips including cost, conveyance, royalty and all other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge.
35.25
233372
6620.5
... More
Earth work in hard soil including rough dressing and breaking the clods to maximum 5.c.m to 7c.m and laying in layers not exceeding 0.30m. With five extra lead over initial lead of 50m and one extra lift over initial lift of 1.50m including sundries, T&P required for the work etc complete as per the direction of Engineer-in-Charge.
25.33
6525
257.6
... More
Cement Concrete (1:3:6) with hard granite metal 40mm(1 1/2") size free from weathered skin including cost,conveyance and royality of all materials to the work site labour T&P etc.Ramming, watering, curing as per approved drawing and the specification with all leads, lifts, delifts etc. complete as directed by the Enginer in Charge.
4.44
26170
5894.2
... More
Rigid smooth centering & shuttering for C.C. /RCC work including false work and dismaintailing then after casting including cost & conveyance of materials, all labour charges complete as per drawing & specification with all leads, lifts, sundries and T&P etc. complete as per the direction of Engineer-in-charge.
135.34
31845
235.3