The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Construction Of Canal Lining From Rd 1851m To 2091m In Right Main Canal Of Kotagada Mip In Kotagada Block Of Kandhamal District Under Nabakrushna Choudhury Secha Unnayana Yojana (erm) For The Year 2024-25 in Kandhamal, Odisha, with an estimated contract value of Rs. 12,02,000. The bid opening date for this tender is 06-02-2025 and the last date for bid submission is 15-02-2025. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 12,100Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMIB_110056_3Bid Award Id
ViewTender No
BID IDENTIFICATION NO-13/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in hard or gravelly soil with all leads and lifts, delfts and depth of cutting to proper slope and level including rough dressing and breaking the clods to maximum 0.30 cm (1’) in depth and depositing the excavated earth on bank to proper embankment and profile with all leads and lifts labour and depositing the balance spoil away from work site with all leads and lifts as directed by the Engineer in charge (Measurement is to be taken on finished level section)
241.5
225
54518.63
... More
Supplying, straightening, cutting, bending, binding and tying the HYSD bars and placing in position as reinforcement and anchoring including lapping where necessary, cost of HYSD bars & binding wire with all leads, lifts for bending yard to placement point including cost, conveyance, labour, T&P & all taxes required for this item etc. complete as directed by the Engineer-in-charge.
32.87
8658
284599.97
... More
Rainforced Cement concrete in (M 20) with 20 mm down grade hand broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item complete as directed by Engineer-in-charge.
72.61
6770
491575.51
... More
Cement Concrete (M 15) with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item complete as directed by Engineer-in-charge.
20.75
6320
131149.75
... More
Providing & removing rigid smooth centering & shuttering for R.C.C./ C.C works including false work including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and proper curing including depositing the debris clear of work site with all leads & lifts delfts including supply of all labour and T & P required for the items etc. complete in all respect as directed by Engineer in charge.
656.93
247
162590.18