Water Resources Department Tender
... More
The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Modernization To Jogendrapur Mip (res) In Kantamal Block Of Boudh District in Boudh, Odisha, with an estimated contract value of Rs. 22,72,825. The bid opening date for this tender is 17-01-2024 and the last date for bid submission is 16-02-2024. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 22,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMIB_99689_1Bid Award Id
ViewTender No
OIIPCRA-BOU-W2-3/2024Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in hard soil or gravelly soil for Benching with all leads and lifts to proper slope and profile as per the requirement including the rough dressing and breaking clods to maximum 5 to 7 cm. in layers not exceeding 0.30 M in depth to proper slope and profile with supply of all labour and tools and plants, all materials all taxes & supervision charges to complete the item of work as per design drawing and specification and as per the direction of the Engineer-in-charge. (Measurement will be taken in the finished approved level section) 1/6th volume will be deducted towards settlement for embankment only
243
-
175.8
... More
Clearing shrub jungle and uprooting stumps and small bushes and trees of below 90cm (3ft) girth on pre-measurement and depositing the debrises clear of worksite with all lead and lift complete as directed by the Engineer-in-charge
2800
-
2.1
... More
Excavation of the approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within 2 km lead on properly prepared and scientifically approved surface including spreading & levelling the earth in 22.5cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering & compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc complete as per direction of engineer-in charge. (Measurement of the fill to be taken on the finished compacted section under O M C condition).
5814.9
-
94.2
... More
R.S. Dry packing in approns and slopes and revetments to all height with hard broken stone of approved quality, quarried free from weathered skin including filling the interstices with small stones including cost conveyance, royalty and other taxes of all materials required for the work to proper slope and level complete in all respects as directed by the Engineer in charge
115
-
2189.4
... More
Gravel backing to revetment to required thickness to proper profile of dam including watering and all cost conveyance, and royalty etc complete as directed by EIC
235.5
-
996
... More
Fine dressing turfing the slopes of the Dam or Dyke with compact Dub-grass with all lead and lifts and as per the direction of the Engineer-in-charge
5100
-
33.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements