The WATCO has issued a formal invitation for competitive bids for the Water Corporation Of Odisha project, for Construction Of Internal House Sewer Connection And Interlinking With Inspection Chamber In Ward No. 33, 34 And 36, Bbsr in Bhubaneswar, Odisha, with an estimated contract value of Rs. 2,22,43,000. The bid opening date for this tender is 28-03-2025 and the last date for bid submission is 29-04-2025. Interested bidders for Water Corporation Of Odisha tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Water Corporation Of Odisha - WATCO Tender

Opening Date28 Mar 2025
Closing Date29 Apr 2025
Tender Amount₹ 2,22,43,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling foundation and plinth with excavated materials including watering and ramming as per specification & direction of Engineer-in-charge.

1329.15

-

-

... More
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately.

390.65

-

-

... More
Excavation of foundation in laterite rock or any hard rock(other than granite or disintegrated rock)removed by chiselling including dressing and leveling the bed not exceeding 1.5mtr depth and depositing the soil within 50mtr initial lead as per specification approved by the Deptt. (30% depth of 0.550mtr is 0.165 mtr)

443.05

-

-

... More
For Survey and investigation

1906

-

-

... More
Supplying all labours and T&P for earth work in all kind of soil within 50mtr inttial lead and 1.5mtr initial lift including rough dressing and breaking of clods maximum 5cmto 7cm size and laying in layers not exceeding 0.30mtr in depth as per direction of Engineer -in -charge. (70% depth of 0.550mtr is 0.380 mtr)

1476.84

-

-

... More
Providing cement concrete (1:2:4) with 12mm size C.B.H.G. chips in floor including supplying all labour, materials, T & P and cost, conveyance, royalties, taxes, etc. all complete as per specification and direction of Engineer-in-charge.

390.65

-

-

... More
Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead.60% of total length

2343.89

-

-

... More
Supplying all materials, labour, T & P and transporting the excavated surplus materials by mechanical carriage and dumping it at a suitable place within 5 k.m. distance from work site as per direction of Engineer-in-charge.

981.39

-

-

... More
Extra for every additional depth of 0.10mtr. or part there of Inspection chamber size (450mm. dia.x 450mm) [data for 0.10mtr.](per each )

2382

-

-

... More
Supplying filling in foundation & plinth with sand well watered & rammed including cost, conveyance, royalties, taxes all labour, T & P etc all complete as per specification and direction of Engineer-in-charge.

590.74

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.