State Warehousing Corporation Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
State Warehousing Corporation Tender
Civil And Construction
Building Construction
Eprocure
Opening Date25 Jan 2025
Closing Date6 Feb 2025
Tender Amount₹ 71,64,454
Costs
EMD
₹ 71,645Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_OSWC_109816_5Tender No
OSWC/Civil/16/2024-25 dt 20.01.2025Tender Authority
State Warehousing Corporation ViewPurchaser Address
-Website
http://http://oswc.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Gola concrete Cement concrete (1:2:4) using 12 mm size black hard granite chips of approved quality and from approved quarry including hoisting lowering laying and compacting with watering ,curring ,cost,conveyance, royalties and taxes of all materials ,cost of all labour and T&P required for the work etc, complete
43.9
-
314310.83
... More
Dismantling brick or stone masonry in lime or cement mortar above 3.00 mtr. height including stacking the useful materials for reuse and removing the debris away from the working area i.e. with in 50. m Lead., including cost of all labour and T&P required for the work etc. complete.(Above 4.00 MTR)
39.08
-
65247.97
... More
Brick work using Fly ash B.bricks having crushing strength not less tan 75kg/cm2 in C.M (1:6) using bricks of approved quality of size 10"x 5"x 3" having diamensional tolerance ± 10% after immersing the bricks 6 hours in water before use including hoisting, lowering, laying, cutting, moulding, corbelling, champering, watering, curring in Superstructure with cost conveyance taxes royalties of all materials cost of all labour and T&P required for the work etc. complete.
39.08
-
228072.05
... More
Removing Old Lime or Cement Plaster from walls including removing the debris within 50m lead……….. Etc with all cost complete.
827.65
-
46762.23
... More
12 mm thick Cement Plaster(1:6) over rough surface of Brick massonry including racking out joints including watering , curring, cost , conveyance, royalties and taxes of all materials,cost of all labour and T&P required for the work etc. complete.
-
-
-
... More
Inside and Outside of the GD (Upto 4.00 Mtr)
486.55
-
90308.55
... More
Above 4.00 Mtr
466.35
-
93167.4
... More
Finishing walls with two coats of water proofing cement paints of approved shade …………..etc with all cost complete.
-
-
-
... More
Inside and Outside of the GD (Upto 4.00 Mtr)
1669.4
-
73954.42
... More
Above 4.00 Mtr
954.97
-
44024.12
... More
Wall painting two coats with Weather coat of approved shade …………..etc with all cost complete.
-
-
-
... More
Inside and Outside of the GD (Upto 4.00 Mtr)
1882.35
-
180705.6
... More
Above 4.00 Mtr
908.73
-
90873
... More
Priming One coat with primer of approved quality etc with all cost complete
-
-
-
... More
Inside and Outside of the GD (Upto 4.00 Mtr)
1882.35
-
149270.36
... More
Above 4.00 Mtr
908.73
-
74852.09
... More
Painting two coats with approved synthetic enamel paint of approved make……………….etc with all cost complete.
4027.03
-
732919.46
... More
Supplying fitting and fixing of windties etc with cost of all labour and T&P required for the work etc. complete.
2448
-
293760
... More
Supplying and Fixing of Fibre Glass panes in top ventilators……etc with all cost complete.
60.12
-
51102
... More
Supplying and fixing of MS Jally in Ventilators……….etc with all cost complete.
126
-
15120
... More
Dismantling brick or stone masonry in lime or cement mortar above 3.00 mtr. height including stacking the useful materials for reuse and removing the debris away from the working area i.e. with in 50. m Lead., including cost of all labour and T&P required for the work etc. complete.(Under 4.00 MTR)
33.07
-
52148.08
... More
Brick work using Fly ash B.bricks having crushing strength not less tan 75kg/cm2 in C.M (1:6) using bricks of approved quality of size 10"x 5"x 3" having diamensional tolerance ± 10% after immersing the bricks 6 hours in water before use including hoisting, lowering, laying, cutting, moulding, corbelling, champering, watering, curring in Foundation & Plinth with cost conveyance taxes royalties of all materials cost of all labour and T&P required for the work etc. complete.
33.07
-
182440.25
... More
Filling in Foundation and Plinth with sand well watered and rammed…………etc with all cost complete.
46.99
-
34094.53
... More
CC (1:3:6) using 4cm size crusher broken HG metal…..etc with all cost complete.
15.67
-
87344.58
... More
Dismantling and Removing 2.5cm thick AS Flooring, including removing the debris……….etc with all cost complete.
156.6
-
17680.14
... More
Cement Punning………etc with all cost complete.
156.6
-
6310.98
... More
Scraping old Paint with scrapers, sand papering………..etc with all cost complete.
2542.68
-
13018.52
... More
Repair & Maintenance of Rolling Shutter including cost, conveyance ………….etc with all cost complete
-
-
-
... More
Change of Springs
4
-
1900
... More
Lockplate Stopper
20
-
3000
... More
Greasing
22
-
9900
... More
Spring Adjustments
22
-
8800
... More
DEDUCTION
-
-
-
... More
Salvage Value of AC sheets recovered from Roofing of 6000 MT godown ……………etc with all cost complete.
2113.65
-
31704.75
... More
Salvage value of Bricks recovered from Gable Wall of 6000 MT godown …………etc with all cost complete.
36.08
-
56068.68
... More
Salvage value of Steel (Wind Tie + J. Hooks) recovered from roofing of 6000 MT godown………..etc with all cost complete.
1224
-
30600
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%