ST And SC Development Minorities And Backward Classes Welfare Department Tender

... More
The ST And SC Development Minorities And Backward Classes Welfare Department has issued a formal invitation for competitive bids for Construction Of 100 Seated Composite Urban Modern Hostel (girls) At Rajgangpur In Rajgangpur Block in Sundergarh, Odisha, with an estimated contract value of Rs. 2,18,99,643. The bid opening date for this tender is 25-08-2023 and the last date for bid submission is 24-08-2023. Interested bidders for ST And SC Development Minorities And Backward Classes Welfare Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

ST And SC Development Minorities And Backward Classes Welfare Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date25 Aug 2023
Closing Date24 Aug 2023
Tender Amount₹ 2,18,99,643 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
First Floor

40.43

38275

946.7

... More
Second Floor

2160.12

170433

78.9

... More
Ground Floor

1770.1

120366

68

... More
Ground Floor

130.57

653711

5006.6

... More
6mm thick cement plaster in cement mortar (1:4) to RCC surface finished including watering curing to required period including cost conveyance,royality of all materials,T&P complete etc. As per specification and direction of engineer in charge.

-

-

-

... More
Ground Floor

2.51

34585

13779.2

... More
Wall Priming one coat to plaster surface with any approved quality including cost of all materials labour etc. complete.

-

-

-

... More
Second Floor

27.09

242807

8963

... More
Ground Floor

560.33

93743

167.3

... More
Column & Beam

-

-

-

... More
Ground Floor

1779

246587

138.61

... More
Providing, fitting & fixing of Un-piasticised Poly Vinyl Chloride (UPVC) openable windows including all fittings and cost, conveyance of all materials labour and T&P required for the work etc complete as directed by EIC.

-

-

-

... More
Column base & Footing

102.21

622070

6086.2

... More
Fixing Ceramic tile in dado, skirting and rises of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

-

-

-

... More
First Floor

393.03

32346

82.3

... More
Fixing Vertified tiles in dado, skirting and rises of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

-

-

-

... More
16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.

-

-

-

... More
Ground Floor

46.52

43547

936.1

... More
Ground Floor

63.87

795373

12453

... More
Second Floor

40.43

38719

957.7

... More
First Floor

17.32

108594

6269.9

... More
Second Floor

182.85

171549

938.2

... More
Ground Floor

71.9

85561

1190

... More
Ground Floor

557.06

47350

85

... More
Finishing to Distempering wall with distemper of approved brand and approved colour including cleaning the surface with cost, conveyance, royalty taxes of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge.

-

-

-

... More
Second Floor

1050.88

82388

78.4

... More
First Floor

443.49

69716

157.2

... More
Ground Floor

41.01

311101

7586

... More
First Floor

38.78

46764

1205.9

... More
First Floor

39.21

297447

7586

... More
First Floor

990.71

219145

221.2

... More
Second Floor

40.56

307688

7586

... More
Supply ,Fitting & Fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32 mm x 2 mm @ .09 mtr C/C and stainless square pipe bracing of 32 mm x 32 mm x 2 mm in 3 row in stair case as per approved design and specification buffing,polishing etc. with cost ,conveyancy taxes of all material, labour ,T&P etc. required for the

22.5

91106

4049.16

... More
Plinth Bend

34.21

236206

6904.6

... More
First Floor

997.85

76535

76.7

... More
Providing, fitting & fixing of Un-piasticised Poly Vinyl Chloride (UPVC) Door including all fittings and cost, conveyance of all materials labour and T&P required for the work etc complete as directed by EIC.

-

-

-

... More
Ground Floor

41.92

579518

13824.4

... More
Lintel Bend

-

-

-

... More
First Floor

372.96

408130

1094.3

... More
Ground Floor

12.81

28317

2210.6

... More
Ground Floor

17.32

108594

6269.9

... More
Second Floor

117.4

1093581

9315

... More
12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.

-

-

-

... More
RCC work of M-25 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge.

-

-

-

... More
Fixing Vertified tile in floors, treads on steps and landing on 25 mm thick bed of cement mortar 1:1(1cement:1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing,cost,, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

-

-

-

... More
Second Floor

428.2

35883

83.8

... More
Second Floor

38.52

677200

17580.5

... More
Ground Floor

1770.1

134527

76

... More
First Floor

23.2

5131

221.2

... More
First Floor

2.51

38854

15479.7

... More
First Floor

17.76

22473

1265.4

... More
Second Floor

8.05

133217

16548.7

... More
Second Floor

729.99

119280

163.4

... More
CC (1:3:6) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge.

112.4

581714

5175.4

... More
Painting with emulsion paint 2 coats of any approved shade to inside wall over a caot of water bound primer including cost of all materials & labour etc complete.

-

-

-

... More
Second Floor

2.51

43964

17515.7

... More
Second Floor

2160.12

153800

71.2

... More
Finishing to walls with two coats weather coat of approved brand and approved colour including cleaning the surface with cost, conveyance, royalty taxes of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge.

-

-

-

... More
Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge.

547.35

323319

590.7

... More
Finishing wall surface of walls with cement based wall putty ( water based ) any approved quality including cost of all materials labour etc. complete.

-

-

-

... More
First Floor

108.64

1009048

9288

... More
Second Floor

1072.48

243131

226.7

... More
Ground Floor

11.7

153364

13108.1

... More
Iron Work wrought and put up in grated door & Windows and Cage Latrines and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect.

-

-

-

... More
Supplying, fitting & fixing (glazed tiles) of Antiskid Ceramic Floor Tiles in flooring using special plain / printed series Ceramic Floor Tile of premium grade ( having minimum thickness 7 mm to 8 mm & size 400 mm x400 mm, confirming to I.S 13755 of approved quality and shade in floors, treads on steps and landings on 20 mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened & washed sharp river sand for mortar and fixing with neat white cement slurry,grouting the joints with neat white cement slurry mixed with required quantities of pigments (Tiles are to be immersed in the water for required time before use) of approved make to match the shades of the Ceramic Floor Tiles if required including cost, conveyance, loading, unloading, stacking, royalties , all taxes, cost of all Labour, Labour cess ,Sundries, T&P required for the work , Watering , Curing for required days , cleaning the flooring space manually etc. complete in all respect as directed by the Engineer-in-charge

-

-

-

... More
First Floor

541.54

47547

87.8

... More
Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge.

672.75

139104

206.77

... More
First Floor

8.31

121945

14674.5

... More
First Floor

1763.63

136504

77.4

... More
First Floor

182.85

168496

921.5

... More
Second Floor

67.09

1046946

15605.1

... More
Fixing Granaite tile in floors, treads on steps and landing on 25 mm thick bed of cement mortar 1:1(1cement:1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing,cost,, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

-

-

-

... More
First Floor

1763.63

122572

69.5

... More
Second Floor

16.37

23729

1449.6

... More
Brick work with Fly Ash Brick in cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

-

-

-

... More
Ground Floor

413.39

448032

1083.8

... More
Ground Floor

309.22

24984

80.8

... More
First Floor

1300

180193

138.61

... More
Ground Floor

31.5

282334

8963

... More
Ground Floor

21.93

24379

1111.7

... More
First Floor

36.2

562316

15533.6

... More
Second Floor

137.88

775602

5625.2

... More
Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance, , taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge.

-

-

-

... More
Second Floor

370.17

409185

1105.4

... More
Second Floor

582.12

102278

175.7

... More
Second Floor

41.62

50880

1222.5

... More
Enamel painting 2 coats to doors, windows, fix grill & collapssible gate of any approved shade over a coat of primer including cost of all materials & labpur etc complete.

-

-

-

... More
Second Floor

1338

185460

138.61

... More
First Floor

551.06

94451

171.4

... More
Ground Floor

199.54

180723

905.7

... More
Staircase excluding landing but including railing.

-

-

-

... More
Chhaja

-

-

-

... More
First Floor

126.77

671158

5294.3

... More
Ground Floor

1113.94

83656

75.1

... More
First Floor

60.29

837301

13887.9

... More
First Floor

25.51

228646

8963

... More
Second Floor

853.69

77515

90.8

... More
Ground Floor

283.87

2629317

9262.4

... More
Roof Slab

-

-

-

... More
Brick work with Fly Ash Brick in cement mortar (1:6) in foundation & plinth including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

121.47

604106

4973.3

... More
Ground Floor

39.97

8625

215.8

... More
Brick work with Fly Ash Brick in cement mortar (1:4) in foundation & plinth including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

9.84

50977

5180.6

... More
Ground Floor

462.24

69890

151.2

... More
Second Floor

17.32

108594

6269.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.