Public Health Engineering Organisation Tender

... More
The PHEO has issued a formal invitation for competitive bids for the Public Health Engineering Organisation project, for Construction Of Ph Section Office Madhiapali And Boundary Wall At Kesherkela Pump House, Balangir. in Balangir, Odisha, with an estimated contract value of Rs. 64,94,274. The bid opening date for this tender is 11-11-2026 and the last date for bid submission is 25-11-2026. Interested bidders for Public Health Engineering Organisation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Health Engineering Organisation - PHEO Tender - Orissa Tender

Opening Date11 Nov 2026
Closing Date25 Nov 2026
Tender Amount₹ 64,94,274 
Notes
Download

Costs

Description

Construction Of Ph Section Office Madhiapali And Boundary Wall At Kesherkela Pump House, Balangir.

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
Cement Concrete (1:2:4) with 12mm.size & down grade hard granite C.B. chips of approved quality and from approved quarry including watering, lowering laying concrete, compacting with vibrators, curing for 28 days with smooth etc. complete.

22.68

7473

169489.91

... More
R.C.C. work M-25 in grade having a minimum compressive strength (in work test) 250 kg/cm2 in 15cm cubes at 28 days using 12mm. & down grade hard granite C.B. chips of approved quality and from approved quarry including watering, lowering laying concre Footing

19.18

6263

120135.85

... More
Plinth Beam

7.44

6263

46601.18

... More
R.C.C. Columns Ground floor

5.54

6263

34700.34

... More
1st Floor

4.53

6388

28939.45

... More
2nd floor (Head room)

0.91

6532

5944.12

... More
Lintel Ground floor

2.23

6388

14246.13

... More
1st Floor

2.52

6388

16098.77

... More
2nd floor (Head room)

0.44

6532

2874.08

... More
Roof Beam Ground floor

4.42

6388

28236.73

... More
1st Floor

4.42

6388

28236.73

... More
2nd floor (Head room)

0.95

6532

6205.4

... More
R.C.C. Roof Slab Ground floor

18.39

6388

117482.68

... More
1st Floor

18.39

6388

117482.68

... More
2nd floor (Head room)

1.88

6532

12280.16

... More
R.C.C Stair Ground floor

2.16

6388

13798.94

... More
1st floor

2.16

6388

13798.94

... More
Rigid smooth centering & shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete. Footing

67.49

249

16859

... More
Plinth Beam

84.28

1219

102796.32

... More
R.C.C. Columns Ground floor

81.28

1219

99137.22

... More
1st Floor

66.43

1463

97226.95

... More
2nd floor (Head room)

13.2

1756

23184.48

... More
Lintel Ground Floor

20.1

577

11611.77

... More
1st floor

22.58

693

15654.71

... More
2nd floor (Head room)

3.82

850

3247

... More
R.C.C. Roof Beam Ground Floor

61.99

1219

75609.2

... More
1st Floor

61.99

1463

90728.56

... More
2nd floor (Head room)

7.64

1756

13418.9

... More
R.C.C. Stair case Ground floor

14.85

1068

15873.17

... More
First floor

14.85

1282

19046.61

... More
R.C.C. Roof Slab Ground floor

128.13

769

98557.6

... More
1st Floor

128.13

923

118263.99

... More
2nd floor (Head room)

13.59

1107

15052.28

... More
Supplying Cutting,bending un- coated HYSD bars,for reinforcement tying the grills and placing in position as required for the RCC works and for providing fan hooks hoisting and lowering,laying including cost,conveyance & taxes of SYSD bars and binding wires of 18 to 20 gauge required for the work and bending binding and tying the grills Ground floor

60.77

9130

554860.49

... More
1st Floor

31.68

9164

290334.53

... More
2nd floor (Head room)

4.27

9272

39591.87

... More
Fly ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinth having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.

13.07

5561

72684.88

... More
Fly ash bricks masonary in cm (1:6) in Superstructure after immersing the bricks 6 hrs. In water before use in all floors having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete. Ground floor

53.7

5594

300430.02

... More
1st Floor

51.29

5980

306744.97

... More
2nd floor (Terrace)

16.71

6424

107351.72

... More
12 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.(Outside Wall Surface) Ground floor

181.04

190

34470.02

... More
1st Floor

147.67

198

29282.96

... More
2nd floor (Terrace)

85.06

206

17581.9

... More
16 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.In Side Wall Surface Ground floor

316.23

275

87216.23

... More
1st Floor

377.74

282

106862.65

... More
2nd floor (Terrace)

139.5

290

40496.85

... More
6mm thick cement plaster in C.M. [1:4] finished smooth to exposed R.C.C. work with cost of all materials labor etc. complete. Ground floor

135.59

214

29043.38

... More
1st Floor

168.43

219

37020.91

... More
2nd floor (Head room)

9.22

225

2079.11

... More
Priming one coat with any approved primer including cost of all labour, materials T & P with taxes, transportation etc all complete. Ground floor

632.86

83

53096.95

... More
1st Floor

693.84

87

60572.23

... More
2nd floor (Head room)

233.78

90

21250.6

... More
Finishing wall surface of walls with Acrylicwall putty (Water based ) of approved makeand finished smooth and even surface toreceive painting including cost of scaffoldingstaging charges with cost of all materialstaxes, labour T&P etc complete as per Engineer-in-charge Ground floor

451.82

101

45950.09

... More
1st Floor

546.17

103

56637.83

... More
2nd floor (Head room)

148.72

105

15719.7

... More
Finishing wall surface with plastic emulsion paint 2 coat over a coat of primer to the new surfaces of walls with including all cost as per direction of Engineer-in-charge. Ground floor

451.82

194

87743.44

... More
1st Floor

546.17

199

109179.38

... More
2nd floor (Head room)

148.72

205

30561.96

... More
Finishing wall surface with weather coat 2 coat over a coat of primer to the new surfaces of walls with including all cost as per direction of Engineer-in-charge. Ground floor

181.04

186

33727.75

... More
1st Floor

147.67

193

28559.38

... More
2nd floor (Head room)

85.06

200

17088.55

... More
Fixing Vertified floor tiles of premium grade having thickness 8 mm to 10 mm confirming to IS:13756 of following sizes in floors or steps & landing on 25mm. thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing & polishing complete including cost of Tile. Ground floor

108.03

1221

131915.43

... More
1st Floor

112.07

1234

138384.04

... More
Fixing Vertified floor tiles of premium grade having thickness 8 mm to 10 mm confirming to IS:13756 of following sizes into dados skirting & risers of steps on 12mm. thick C.P (1:3) jointed with neat cement slurry mixed with pigments to match the shade of tiles including rubbing & polishing complete including cost of tiles. Ground floor

19.87

1274

25328.29

... More
1st Floor

25.22

1295

32669.99

... More
Fixing Tiles in floors or steps & landing on 25mm. thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles all complete with cost of precast tiles. Ground floor

17.33

987

17115.11

... More
1st Floor

14.4

1001

14420.16

... More
Fixing Tiles to dados skirting & risers of steps on 12mm. thick C.P (1:3) jointed with neat cement slurry mixed with pigments to match the shade of tiles all complete with & without cost of precast tiles. Ground floor

38.64

989

38222.69

... More
1st Floor

36.69

1030

37809.05

... More
Fixing Chequred Tile in floors or steps & landing on 25mm. thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing & polishing complete

17.4

706

12298.32

... More
Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia. Of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and stainless square pipe of size 32mmx32mmx2mm in 3 rows in staircase as per approved design and specification etc all completed.

27.87

3138

87456.06

... More
Supplying and fitting-fixing of Un-plasticised Poly Vinyl Chloride (UPVC) (FENESTA / NCL VEKA LTD) Casement Window with top fixed - 60-Series duly manufactured using UPVC reinforced profiles of 60 mm x 55 mm x 2.5 mm for outer frames, 75 mm x 60 mm x 2.25 mm for casement Window Sash Profile and 74 mm x 60 mm x 2.5 mm mullion profile capable of mounting sigle glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded through fusion welding the window sash shall be fitted with 6mm thick clear toughened glass of SAINT-GOBAIN make duty fixed EPDM weathering seal resistant accessories like clipping locking system made of aluminium 1 No. per set sashes and the system is to be inshtalled at the using anchor fasteners, sillicon rubber sealant, easy glazing/ degilazing at site etc. including cost and conveyance of all materials, acessories, labour charges, materials and product conforming to ASTM D 638-14, EN-477-95 and other applicable codes and standards,.....(W)

20.16

7556

152328.96

... More
Providing fitting and fixing in position M.S. window Grill with M.S. flat and angles of approved drawing and design including cutting bending the angles and flats to proper sizes welding, chamfering etc. including cost, conveyance, royalties and taxes of all materials, cost of all labour, sundries and T&P etc. required for the work complete, as per direction of the Engineer in charge.

1288.8

90

115992

... More
Enamel Painting two coats with any approved paint including cost of all labour, materials T & P with taxes, transportation etc all complete as per direction of EIC. Ground floor

19.62

191

3763.12

... More
1st Floor

10.08

196

1982.74

... More
2nd Floor

2.52

201

508.28

... More
Providing fitting, fixing of Al. door with anodized Al. door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member with frame section as 9221 with tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges etc. complete excluding cost of laminated board.

26.28

6985

183586.82

... More
Providing fitting and fixing of PVC door shutters of approved design and specification including all cost, conveyance and taxes of all materilas, all labour, all T&P sundries required for the work as per the direction of the Engineer-in-charge.

6.72

2950

19824

... More
Providing fitting, fixing of false celling with Aluminium anodized T section No. 3215 with 2'-0" centre to centre, L section No. 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and PVC plug and the Aluminium grid 2'-0" x 2'-0" suspended from ceilling including all cost of labour, T&P, hire charges of drilling machine, labour charges etc.complete.

43.26

1659

71789.97

... More
Supplying all materials, labour, T&P for fitting and fixing of all electrical accessories for complete Internal Electrification work including Concealed wiring to light point / fan point / exhaust fan point / call bell point, submain wiring,junction box, provision for ceiling rose,piano type switch, sockets on metal box,RCCB and MCCB arrangements,Distribution Panel,adequate LED lighting arrangements inside and outside,Chemical earthing,Fans etc. all complete as per direction of EIC.(Add 10% for EI work)

1

553148

553148.46

... More
Supplying all materials, labour, T&P for water supply, S/I, S/D work including fitting fixing of all PH Fixtures for complete PH work as per direction of EIC. Construction of 20 users septic tank size - ( 3.00m x 1.0m x 1.50m liquid depth ) detailed estimate enclosed (Annexture - "B"

1

67059

67059.57

... More
Construction of OHT of Ground Floor detailed estimate enclosed (Annexture - "C")

1

40171

40171

... More
Supply fitting and fixing of 2000 litre capacity Triple Layer white Cylinderical Vertical water storage tanks (ISI Marked) (including cost of 2000 ltr PVC Tank/Triple Layer)

1

26579

26579.9

... More
Supplying all materials, labour and T&P for construction of 1.20mtr.dia.x1.50mtr. Deep soak-way pit with dry brick walling up to 1.10mtr. height and brick work with cement mortar (1:6) for 0.45mtr. height of wall at top,cement plaster (1:3) inside and outside,inside filled with dry brick khoa of 50mm.to 100mm.size to a height of 2.00mtr.from bottom, covered by means of 40mm.thick R.C.C. perforated slab,50mm.thick R.C.C.well cover in pieces fitted with iron rings including earth work in excavation and refilling of cavity around the pit etc. all complete as per approved design and drawing.

1

15984

15984

... More
Supplying all materials ,Labour,T & P and laying in treanches PVC pipe ( 4Kg/cm2) as sewer line and alinging to requisite gradients inside the trench, jointing with solvent cement ,0.08m sand filling in bed , 0.10m C.C ( 1:4:8) using 40 mm size hbg metal in bed , C.C ( 1:2:4 ) with 12 mm chips for 0.05 m in bed & intermediate pillar @ 3.0 Mtr interval including lowering the pipes to the bed of trench, Earthwork in excavation in all kind of soil ,Filling the trenches with excavated earth with watering and ramming and removal of surplus earth, testing of sewer lne etc.complete as per the direction of Er.in charge. i) 110 mm OD PVC pipe SWR pipe(Type B)

20

1213

24276

... More
Construction of Inspection Chamber of internal size-(0.75mx0.75mx0.45m) Including RCC Cover slab as per P.H. Specification.

2

8380

16760.6

... More
Construction of Man hole Chamber of internal size-(0.9mx0.9mx0.9m) Including RCC Cover slab as per P.H. Specification.

1

17556

17556.8

... More
Supplying all materials ,Labour,T & P and fixing SWR PVC pipe type B & fitting to wall with nails , clamps and wooden plug as per P.H specification & the direction of Engineer in charge. 110 mm SWR PVC pipe type B

22

669

14729

... More
75mm SWR PVC pipe type B

20

461

9232

... More
110mm dia Bend Plain

4

206

824.56

... More
110mm dia Tee with Door

4

265

1062.88

... More
110mm dia Single Y with door

2

307

614.3

... More
110mm dia Vent Cowl

4

40

160.04

... More
110mm dia P.V.C. Nahani Trap

8

154

1234.48

... More
Cutting grooves in pucca floors and walls for taking GI/PVC pipes and making good the damages as per specification complete.

30

246

7383

... More
Providing and fixing to wall or celing and floor P.V.C pipe ( Sch-80)/6 Kg/cm2 of the following nominal dia including cost of G.I fittings,clampc including making good the damages to wall ,celling & floor etc complete as per specification in ground floor 20 mm diameter ( Sch-80)

30

197

5916

... More
25 mm diameter ( Sch-80)

80

252

20216

... More
Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification complete. 25mm dia Gun Metal Full Way Valve

4

1387

5548.8

... More
Providing, fixing, fitting of following Brass / Gun metal/Chromium plated fitting of approved reputed make (conforming to respective I.S. specifications ) including the jointing materials, if any all complete as per the PHE specification and the direction of the Engineer-in-charge. E.W.C. with P-trap

2

3094

6189.2

... More
23" I.W.C.(Orissa Pan)

2

3607

7215.8

... More
22"x 16"(550x400) W.H.B

4

3051

12204.4

... More
Standard Pedestal for WHB

4

2621

10487.6

... More
Urinal Large- half stall urinal flat back 580x380x350 mm(Magnum type) White

4

6699

26796.4

... More
10 litr pvc low level cistern with fittings

4

1954

7817.2

... More
15 mm dia CP Short body Bib cock -

2

915

1831.2

... More
15 mm dia CP Long body Bib cock

4

989

3958.8

... More
15mm dia c.p concealed stop cock

4

1124

4496

... More
15 mm CP 2 way Bib Cock

2

1308

2616.6

... More
Health Foucet with 1.2 mtr Flexible Tube with wall hook

2

882

1764.6

... More
15 mm dia CP Pillar cock

4

1463

5852.4

... More
15mm dia c.p.angular stop cock

12

937

11251.2

... More
600mm x 450mm Bevelled Edge Mirrior

4

919

3678

... More
600 mm long Single CP Towel Rail

4

1080

4320.4

... More
C.P. Towel Ring round

4

546

2187.6

... More
600mm long C.P.Shelf with Glass

4

801

3207.2

... More
CP Soap dish holder

4

704

2818

... More
140mm dia CP Over head Shower

4

471

1884.4

... More
CP Arm for Over head Shower

4

142

570.8

... More
C.P.gratings

8

98

787.2

... More
32mmx 1150mm long PVC waste pipe

4

99

397.6

... More
15mmx600mm PVC connection pipe

8

103

827.2

... More
32mm dia CP waste Coupling

8

380

3041.6

... More
C.P. flange

28

103

2892.4

... More
plastic seat and cover

2

791

1582.2

... More
100mm size ‘P’ or ‘S’ trap

4

683

2732.4

... More
25 mm PVC Ball Cock with Rod & Ball

1

907

907.56



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.