The Paradip Port Trust has issued a formal invitation for competitive bids for Providing Concrete Road Along Mchp Pond Including Construction Of Drain Near Mchp Workshop Of Paradip Port. in Kendrapara, Odisha, with an estimated contract value of Rs. 2,21,62,724. The bid opening date for this tender is 25-02-2025 and the last date for bid submission is 17-03-2025. Interested bidders for Paradip Port Trust tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Paradip Port Trust Tender
Civil And Construction
Eprocure
Opening Date25 Feb 2025
Closing DateCancelled
Tender Amount₹ 2,21,62,724
AI Insights
Technical
Technical
Financial
Bid Capacity
... View More
The bid capacity required can be summarized as having completed works with values of:
- Rs. 88,65,090 each for three works,
- Rs. 1,10,81,362 each for two works, or
- Rs. 1,77,30,180 for one work.
Additionally, the Average Annual Turnover during the last three financial years should not be less than Rs. 66,48,818.
The Earnest Money Deposit (EMD) value is Rs. 4,43,255.
Formulas for calculating the bid capacity requirements are:
1. For three similar completed works: 3 * 0.4 * Estimated Cost
2. For two similar completed works: 2 * 0.5 * Estimated Cost
3. For one similar completed work: 1 * 0.8 * Estimated Cost
Also, EMD = 2% of the estimated cost (for tenders up to Rs. 10.0 Crores) or EMD = Rs. 20.0 Lakhs + 1% of the cost in excess of Rs. 10.0 Crores (for tenders more than Rs. 10.0 Crores).
Technical Capacity
... View More
The required prior work experience for the bidder includes completing similar works, specifically General Civil Works, within the last 7 years. The eligibility criteria for meeting similar work experience are as follows:
- Three similar completed works, each costing not less than 40% of the estimated cost, with each work valued at Rs. 88,65,090.
- Two similar completed works, each costing not less than 50% of the estimated cost, with each work valued at Rs. 1,10,81,362.
- One similar completed work, costing not less than 80% of the estimated cost, with the work valued at Rs. 1,77,30,180.
Additionally, alternative criteria are also specified: (i) Single work of value 80% equal to Rs. 8,00,000/- (ii) Two works of value 50% each equal to Rs.5,00,000/- (iii) Three works of value 40% each equal to Rs.4,00,000/-
Costs
EMD
₹ 4,43,255Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MoS_850905_1Bid Award Id
ViewTender No
CE/PRD/ACCTS-16/24/73Tender Authority
Paradip Port Trust ViewPurchaser Address
-Website
http://https://paradipport.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling cement concrete including stacking the useful materials for reuse and removing the debris within initial lead & lift with supply of all labour, T&P, staging, scaffolding, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & disposing at specified place and as per direction of Engineer-in-charge. (Excluding GST)
122
-
-
... More
P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge
29
-
-
... More
C.C. M20 for R.C.C. works using 20mm to 10 mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality, mixing as per approved design mix, hoisting, laying, compacting with40 to 60 neddle vibrator, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties,etc. all complete but Excluding GST as directed by Engineer-in-charge.
230
-
-
... More
Engagement of 5HP Diesel Pump sets and placing those pumps at required locations inside prohibited area for dewatering of stagnated water by pumping including fuel and consumable, providing required length of suction and delivery pipes with supply of all labour, T&P, engagment, hire & running charges of Pump, transportation charges, tollage, Operator cost, Port entry fee with barricading the same area if required etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid. Pumps will be engaged as and when required).
160
-
-
... More
Providing and applying tack coat by emulsion pressure distributer with bitumen emulsion on prepared surface of bituminous/granular Base including brooming of road surface and cleaning the forigh materials by using air compressior before applying and spraying primer at the rate of 0.20 kg/sqm as per Clause 503 of MoSRT&H
Specifications for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC (for new road work)
315
-
-
... More
Cleaning the existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bitumin tack coat with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
315
-
-
... More
Cement concrete of M-30 grade of PQC by using Crusher broken hard granite chips of 12mm to 20 mm size of approved quality for RCC road work, mixing in a Batching plant, transporting the concrete by any approved means, hoisting, laying on mobile batching plant / road pavement slabs in panels of required size, providing thermocol at top 50 mm of the panel joints so as to create a gap of 12mm between panels, compacting by mechanical vibrator with 60mm needle vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding, barricading the area for proper safety of the fresh concrete without obstructing the traffic, etc with supply of all materials, labour, T&P, tollage, all transportation charges, engagement, hire & running charges of all machineries, taxes excluding GST and excluding cost of formwork, cost of joints, cost of steel & labour charges for bending & binding of steel etc all complete as directed by Engineer in Charge. (N.B. : 1)Two separate Mix Design shall be conducted with different Cement brand for RCC work & Barricading the site if required.2)material testing cost borne by contractor.) without Pavor sensor
1583.85
-
-
... More
F&P
895.5
-
-
... More
Making 50 mm x 50 mm furrows, 25mm/ 50mm deep, 450 to the center line of the road and at one metre interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
4695
-
-
... More
Supply Tor/TMT steel Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes, etc. all completebut excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient.
593.5
-
-
... More
Supplying & forming 12mm wide x 60mm deep contraction joints by fixing 32 mm dia 450mm long mild steel round bars @ 300mm C/C including painting two third of the bars with anticorrosive paint & covering the same with 125 micron polythene fitted & cutting grooves of required size and sealing the grooves with bitumastic filler etc, complete with cost & supply of all materials including dowel bars, T&P, labour, Hire and running charges, of all machineries, safety measures, taxes excluding GST etc. all complete as directed by Engineer-In-Charge.
1367
-
-
... More
RCC Wall
1905
-
-
... More
Drilling of 200 mm deep holes on concrete surface in horizontal plane for fixing 12mm or more dia reinforcement bars by any approved method, cleaning the hole by blow out pump, grouting the reinforcement bars with approved anchoring adhesive resins of HILTIMAKE HIT- HY 170/ BOSCH or equivalent make, transporting, cutting, placing, proper fixing of reinforcement bars with cost & expenses of all materials, tools and plants, machineries, taxes, tollages, VAT, Port entry fees including providing barricades to the working area etc all complete as per direction of Engineer in charge (Excluding GST). N.B: The cost of steel will be paid extra.
72
-
-
... More
Providing & laying 6mm thick precoated seal coat using 0.06 cum of 6.7mm size chips as per sieve analysis and 6.8Kg of bitumen per 10sqm. maintain proper camber and consolidation with PRR including hire and running charges of PRR, hot mix plant, bitumen boilers and all other T & P articles with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC (by using mini batching plant and bitumen boiler at site)
315
-
-
... More
Supplying of 150mm dia GI Pipe medium quality conforming to IS-1239, part -
1 (2004) transporting, cutting, placing, proper fixing of GI with cost & expenses of all materials, tools and plants,labour charges, machineries, taxes, tollages, VAT, Port entry fees etc all complete as per direction of Engineer in charge (Excluding GST).
60
-
-
... More
One coat Priming with water bond cement primer to the newly plster surface of the exterior Wall or over the exisitng putty surface of the interior wall of approved make & shade to make an even finished surface in all heights with all scaffolding and staging including cost and supply of all materials, labour, T&P, all taxes, transportation charges etc. complete but excluding cost of GST as per direction of Engineer-in-charge.
2378
-
-
... More
Tractor
56
-
-
... More
Supplying and laying 125 Micron polythene separation membrane with overlapping of 300 mm at joints including cleaning the surface before placing the membrane etc., complete including cost of all materials, labour, T&P, tollage, taxes excluding GSTetc, all complete as directed by the Engineer In Chrage. (N.B. : No payment will be made for overlapping.)
4695
-
-
... More
Supplying & forming 25mm wide x 250mm deep expansion joints by fixing 32 mm dia 450mm long mild steel bars @ 300mm C/C including painted 275mm length of bars with anti-corrosive paint & covering the same with 125 micron polythene fitted and HDFC/G.I. cap of 100 mm long at the other end including fixing 25mm thick & 220 mm deep joint filler Board (Shalitax or equivalent) painting one side of concrete surface with bituminous black paint & sealing the groove with bitumastic filler etc, all complete with cost & supply of all materials including dowel bars, T&P, labour, Hire and running charges, of all machineries, safety measures, taxes excluding GST etc., all complete as directed by Engineer-In-Charge.
94
-
-
... More
Engagement of following machineries like JCB,Tractor for shifting the exiting debris, heaves from th worksite and depositing the same at identified place including supply of all labor,T&P, hire and running charges of machineries, cost of fuel,lubricant,operator cost,macrching charge,watch and ward,port entry fees etc.all complete as per direction oif Engineer-in-charge (Excluding GST).
-
-
-
... More
Supplying & forming 12mm wide x 85mm deep longitudional joints by fixing 12 mm dia 640mm long HYSD bars @ 450mm C/C painted 50mm at center with anti-corrosive paint including providing & fixing bitumen paper, painting one side of concrete surface (250mm thick) with bituminous black paint, cutting grooves of required size and sealing the grooves with bitumastic filler etc, complete with cost & supply of all materials, reinforcement, T&P, labour, Hire and running charges of all machineries, safety measures, taxes excluding GST etc., all complete as directed by Engineer-In-Charge.
1300
-
-
... More
Blinding road surface with 6mm thick Quarry Dust over the final surface of bitumen with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC.
315
-
-
... More
Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge. (Excluding GST)
711.5
-
-
... More
Providing & laying 20mm thick premix carpet using 0.27cum of 13.2mm to 5.6mm size crushed stone chipping and 14.60kg. penetration grade of bitumen for 10sqm including hand packing to proper camber and consolidation with PRR including hire and running charges of PRR, hot mix plant, bitumen boilers and all other T & P articles as per specification including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollage etc all complete but excluding GST. as ditrected by EIC. (by using mini batching plant and bitumen boiler at site)
315
-
-
... More
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in -charge.
-
-
-
... More
Exterior painting two coats to wall surface with acrylic based weather coat paint of approved quality & shade having resistance to Fungus, Fading, including scraping, cleaning, brushing, washing the old paint, as and when required, removing the flakes applying uniformly two coats including cost and supply of all materials, labour, T&P, taxes, transportation, staging, scaffolding, etc. complete but excluding cost of GST as directed by the Engineer-in-charge.
2378
-
-