Panchayati Raj And Drinking Water Department Tender

... More
The Panchayati Raj And Drinking Water Department has issued a formal invitation for competitive bids for Construction Of Boundary Wall At Phc,belgaon Gp Under Saintala Block In Balangir District. in Balangir, Odisha, with an estimated contract value of Rs. 42,02,271. The bid opening date for this tender is 04-11-2024 and the last date for bid submission is 18-11-2024. Interested bidders for Panchayati Raj And Drinking Water Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Panchayati Raj And Drinking Water Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 Nov 2024
Closing Date18 Nov 2024
Tender Amount₹ 42,02,271 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Priming 1 coat with wall primer water bond cement primer including all labour, materials etc. complete.

1593.24

66

105153.84

... More
Labour charges for fitting and fixing of departmental M.S. Gates, steel windows M.S. window grills to windows and opening and collapsible gate with top and bottom rails in proper position including making holes in walls, R.C.C. stucture and wood work etc. and making good the damages to walls or R.C.C. structure including mending or cutting to sizes or grooves in walls and fixing with R.C.C. (1:2:4) with hard black crusher broken/hand broken granite stone chips of 12mm to 20 mm. (20mm not to exceed 25%) with cost and conveyance of all materials, Iron works, labour taxes and royalities with all T&P etc. complete in all floors. As Directed by Enginner-in-charge.

1550

80

124000

... More
Cement concrete of proportion (1:3:6) in foundation using 4 cm size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm thick to the required level ramming watering and curing etc. complete including cost and conveyance of all materials with all taxes and royalties and all labour with T&P required for the work etc. complete, including dewatering if required and as directed by the Engineer-in-charge.

45.53

5730

260891.45

... More
Brick work with Flyash Bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C.

59.86

5448

326123.27

... More
Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C.

7.58

7347

55697.08

... More
RCC work of M 20 Grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying having a minimum compressive strength (in work test) of 200 kg/cm sqm in 15cm cubes at 28 days with IS 456 and 516 using 10mm to 20mm size (20mm not to exceed 25%) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compacting concrete watering and curing for 4 weeks including centring shutering and finishing the exposed surfaces smooth with cost, conveyance, royalties and taxes of all materials and labour with T&P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire 18mm to 20mm gauge and labour charges for straightening, cutting, bending, binding etc. of the M.S. rods or Tor steel and binding wire 188 to 20 mm gauge and labour charges for straightening, cutting, bending, binding etc of the M.S rods or Tor steel and binding wire and tying the grills and placing in proper position and as directed by the Engineer-in-charge. COLUMN BASE

37.38

6263

234129.63

... More
Straightening bend up or coiled rods cutting bending, binding, cranking, hooking, welding or jointing (if required) the MS rods or tor steel and binding wires and binding tying the grills, hoisting, lowering and placing in proper position as required for RCC works including cost, conveyance and taxes of MS Rods or Tor steel and binding wires of 18 to 20 gauge and labour with all T & P required for the work etc. complete in all floors (weight of binding wire will not be considerd for payment and payment will be made onweight of MS rods or Tor steel with piece as per codal provision only and as directed by the Engineer-in-charge

134.75

9044

1218732.9

... More
Earthwork in excavation in foundation in hard soil with all leads and lifts including dressing and levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge.

283.87

269

76559.74

... More
Supplying and filling in foundation and plinth with sand not exceeding 23.0 cm thick in layers including watering and ramming with the cost conveyance royalties, taxes of the materials and labour with T&P required for the work etc. complete ( Measurement will be taken on finished compacted section)only as directed by Engineer-in-charge.

140.15

537

75316.61

... More
RCC work of M 20 Grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying having a minimum compressive strength (in work test) of 200 kg/cm sqm in 15cm cubes at 28 days with IS 456 and 516 using 10mm to 20mm size (20mm not to exceed 25%) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compacting concrete watering and curing for 4 weeks including centring shutering and finishing the exposed surfaces smooth with cost, conveyance, royalties and taxes of all materials and labour with T&P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire 18mm to 20mm gauge and labour charges for straightening, cutting, bending, binding etc. of the M.S. rods or Tor steel and binding wire 188 to 20 mm gauge and labour charges for straightening, cutting, bending, binding etc of the M.S rods or Tor steel and binding wire and tying the grills and placing in proper position and as directed by the Engineer-in-charge. COLUMN

18.52

17746

328668.88

... More
RCC work of M 20 Grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying having a minimum compressive strength (in work test) of 200 kg/cm sqm in 15cm cubes at 28 days with IS 456 and 516 using 10mm to 20mm size (20mm not to exceed 25%) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compacting concrete watering and curing for 4 weeks including centring shutering and finishing the exposed surfaces smooth with cost, conveyance, royalties and taxes of all materials and labour with T&P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire 18mm to 20mm gauge and labour charges for straightening, cutting, bending, binding etc. of the M.S. rods or Tor steel and binding wire 188 to 20 mm gauge and labour charges for straightening, cutting, bending, binding etc of the M.S rods or Tor steel and binding wire and tying the grills and placing in proper position and as directed by the Engineer-in-charge. Wall Beam

11.6

15375

178360.44

... More
Fly Ash brick masonary in cement mortar (1;6) using (23xx11x8) cm size brick after immersing brick for six hours in water before use in superstructure having C.S not less than 75 kg/cm2 in foundation and plinth from approved quarry including splays cutting circular moulding and similar such type of work with necessary projections, chambering and corbelling, watering and curing etc. complete including cost and conveyance of all materials with all taxes and royalties and all labour with T&P required for the work etc. complete in all floors and as directed by the Engineer-in-charge.

93.1

5486

510793.15

... More
16 mm. thick cement plaster (1:6) finished smooth to inside smooth surface of brick walls after racking out the joints including watering and curing with the cost and coveyance of all materials and labour with T&P required for the work with all taxes and royalioties etc. complete in all floors. As directed by Enginner-in-charge.

796.62

265

211502.61



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.