Orissa Construction Corporation Limited Tender
... More
The OCCL has issued a formal invitation for competitive bids for the Orissa Construction Corporation Limited project, for E-procurement Notice No.05/occl/2024-25(on-line) in Nayagarh, Odisha, with an estimated contract value of Rs. 2,23,42,018. The bid opening date for this tender is 27-06-2024 and the last date for bid submission is 24-07-2024. Interested bidders for Orissa Construction Corporation Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 2,23,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
E-procurement Notice No.05/occl/2024-25(on-line)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OCCL_103324_1Bid Award Id
ViewTender No
Bid identification No. OCCL-HQP/18/2024-25Tender Authority
Orissa Construction Corporation Limited ViewPurchaser Address
-Website
http://http://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Collecting, conveying and supplying of approved quality of moorum at work site for pre measurement including cost, carriage , royality & all other taxes of all material etc. complete conveying from stacks laying , spreading on road surface and consolidation with P.P.R. including watetring ,all labour, hire& running , charges of PPR and taxes of all materials complete as per the direction of the Enginner in charge .
268.52
473177
1762.2
... More
Earth work in excavation of foundation hard soil or gravelly soil by manual meams levelling and dressing the bed and depositing the excavated earth away from clear of working area with all leads , lifts with cost of all labour , T&P labour welfare cess etc complete in all respects as per specification and direction of the Enginner in Charge .
184
49624
269.7
... More
Rigid and smooth centering and shuttering for cement concrete in foundation works including false work & dismantaling them after casting with all cost ,carriage ,royality , curing , labour welfare cess etc complete as per direction of Enginner in charge.
496.3
122734
247.3
... More
The item rates indicated aove work inclusive of cost of all labour, materials,conveyence,taxes and royality(with EMF,DMF and additional charges) of materials,labour cess,here and running charges of all machineries and equipments and other incidental charges so as to complete the item in all respect as per specification and direction of Engineer-In-Charge.Accordingly the bidder has to quote the rates.The rate are exclusive of GST as applicable.
-
-
-
... More
Filling foundation and plinth with excavated materials well watered and rammed etc. complete as per the direction of the Engineer in charge.
122.67
18375
149.8
... More
Earth work in suitable type in borrow area , loading into transport vehicle manually or mechanically and transportion of earth by mrchanical means unloading the same over the approved surface of embankment in proper profiles with 5 .00 km leads ,including rough dressing and breaking the clods to maximum 5cm to 7cm size including removal of roots, bushes, other deleterious materials from transported earth with all cost , caarige , royality , labour welfarecess & laying in layers not exceeding 22.5cm in depth including compasition by sleep foot Roller condition with hire & running charges of all all mechenaries with all labour & T & P required for the work etc complete inall respect as per specification and direction of Enginner in charge .
1407.9
302980
215.2
... More
Providing & applying tack coat with bitumen using the emulsion presure distributer @ 0.20kg / sqm on prepared surface of bituminious/ granular base including cleared with mechanical broom as per clause -502 of MOSRT & specication for Road bridge work (4 TH REVISION ) including all cost, carriage , royality & taxes etc all complete as per the direction of Enginner -in Charge .
10740.6
132109
12.3
... More
Cement concrete M-15 with 40 mm down graded crusher broken hard granite chips including mixing with cocrete mixer , hoisting and laying manually , campacting by vibrator including cost, conveyence , royality of all materials complete including watering etc as directed byEnginner -in Charge .
253
1454446
5748.8
... More
Providing & laying of bitumen Macadom with hot mixplant using crushed aggregates of grading -ii (10mm) premixeed with bitumious binder of 60/70 ( packed) penetration grade of bitumen transpered to work site ,laid ovr a previously prepared surface with hydrostatic paver finisher with the sensor control to the required grade, level, alignment and rolling with smoth wheeled , vibratory & & tandom rollers to achieve the desired compaction as per clause -504 of MOSRT & H Specification forthe road & bridge works (4th Revision ) including all cost, arriage, royality7 taxes etc all complte as per direction of Enginer -in -Charge.
268.52
2954389
11002.7
... More
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, up to a lead of 1000metres including removal and disposal of top organic soil not exceeding 150 mm in thickness etc complete as directed by the Engineer-in-charge.
37234.08
306436
8.23
... More
Filling in foundation and plinth with sand in layers not exceeding 22.50cm in thickness well watered and rammed including cost, conveyence, royality and other taxes of all leads, lift and delifts with cost of all labour T&P welfar cess etc. Complete in all respects and as per specification and the direction of Engineer in charge .
34.5
40174
1164.49
... More
Fine dressing & turfing the slopes of the canal with dub grass sods & closely set without gap including pilling the material gullies with one selected earth compacted to proper profile with 3 extra lead and and 1 extra lift with green growth and labour welfare, cess etc. complete as per direction of the Engineer-in-charge.
26923.1
873923
32.46
... More
Providing & applying primer coat with bitumen emulsion on the the prepared surface of granular base including clearing of road surface & applying primer 0.60kg /sqm using mechanical means as per clause -502 of MOSRT & specication for Road bridge work (4 TH REVISION ) including all cost, carriage , royality & taxes etc all complete as per the direction of Enginner -in Charge .
10740.6
380217
35.4