Odisha Mining Corporation Limited Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 67,300Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_OMC_94248_4Bid Award Id
ViewTender No
NIT No.38/OMC/CIVIL/2023Tender Authority
Odisha Mining Corporation Limited ViewPurchaser Address
-Website
http://https://omcltd.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
PCC of prop (1:3:6) using 40mm size black hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required to complete the work etc. as per direction of EIC.
20
117156
5857.8
... More
R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills in Footing
34
271554
7986.9
... More
R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills in Column Pillar
33
530184
16066.2
... More
R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills in Slab
1.5
11980
7986.9
... More
Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC.
8.8
764548
86880.5
... More
Supplying all materials, labour, T&P and fabricating of MS angle for supporting pillar made upwith MS angle of size 75x75x6mm ,MS Flat as per drawing and design given by EIC including cost of all materials cost of all labour, T&P to complete the work as per direction of EIC.
3.49
437828
125380.5
... More
Supplying all materials, labour, T&P and laying in trenches or fixing of 150mm dia M.S. Pipes of Jindal/TATA (Black Medium, B-Class) conforming to IS:1239 (Part-I, 2004) including making good to the damages and testing as per PH specification etc. comp. and as per direction of EIC.
1100
3305060
3004.6
... More
Providing joints by welding with two welding beads / pass conforming to IS 861-1998 (Fillet Weld) to MS pipe and fittings at site by using welding generator including testing of joints as per specification and direction of EIC. 150MM DIA MS PIPE
120
255888
2132.4
... More
Supplying & laying RCC hume pipe of 400mm dia NP3 concrete pipes for bedidng PCC M-20 grade (cast in situ), mechanically mixing vibrating, centering using T&P and mechinary completed in single / multiple rows including fixing and jointing with cement mortar (1:2) and jute fibre if required complete as per drawing and specification and direction of EIC.
20
44048
2202.4
... More
Supplying all materials, labour, T & P and fitting and fixing 150mm dia gate valve(ISI mark) with supply of all jointing materials complete as per specification and direction of the Engineer - in - charge.
2
78963
39481.6
... More
Painting two coats with approved synthetic enamel Paint over a coat of primer of appd. Shade and quality on old wood work/iron work including cost of paint,primer,putty,cost conveyance of all materials, cost of all labour, T&P required for the work etc. Complete as directed by EIC.
680
144772
212.9
... More
Supplying all materials, labour, T & P and fitting and fixing 150mm dia non-return valve(ISI mark) with supply of all jointing materials complete as per specification and direction of the Engineer - in - charge.
10
292000
29200
... More
Supplying all materials, labour, T&P and fitting & fixing 25mm dia MS Air valve with supply of jointing materials complete as per specification and direction of the Engineer in charge. (Make:- Shakti / Leader)
10
23921
2392.15
... More
Fly ash brick masonry in C.M.(1:6) having minimum crushing strength of 75 Kg/Cm2 and of size 25cmx12cmx8cm in Superstructure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC.
3
16861
5620.35
... More
12mm (1/2") thick cement plaster (1:6) on brick work to inside smooth surface after racking out the joints including watering and curing etc complete with cost, conveyance, royalty and taxes of all materials and cost of all labours, T&P, scaffolding required for the work complete as directed by EIC.
20
3223
161.15
... More
16mm (5/8") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC.
15
3412
227.5
... More
Supplying all materials, labour, T & P and fitting and fixing of 150mm dia MS Bend of Jindal make etc including cost of all material, cost of all labour, T&P required etc. complete in all respect as per direction of EIC.
5
14300
2860
... More
Supplying all materials, labour, T & P and fitting and fixing of 150mm dia MSTee of Jindal make etc including cost of all material, cost of all labour, T&P required etc. complete in all respect as per direction of EIC.
2
3000
1500
... More
Filling in foundation and plinth or floor with excavated earth or moorum or extra good earth including laying, watering and ramming in 23 Cm (9") thick layers with all necessary leads and lifts complete with cost of all labour, T&P etc. required to complete as per direction of EIC.
470
117030
249
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements