Odisha Hydro Power Corporation Limited Tender
... More
The OHPC has issued a formal invitation for competitive bids for the Odisha Hydro Power Corporation Limited project, for Fencing On Both Sides Of The Penstock in Koraput, Odisha, with an estimated contract value of Rs. 47,10,879. The bid opening date for this tender is 04-09-2024 and the last date for bid submission is 17-09-2024. Interested bidders for Odisha Hydro Power Corporation Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 47,108Document Cost
₹ 7,080Tender Fee
Refer Documents
Summary
Fencing On Both Sides Of The Penstock
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OHPCL_104543_1Bid Award Id
ViewTender No
e-Tender-03/2024-25_UKHEPTender Authority
Odisha Hydro Power Corporation Limited ViewPurchaser Address
-Website
http://http://ohpcltd.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Painting two coats with any approved enamel paint of Asian/ Berger/Shalimar/ Nerolac make including cost of paint, brush, all labour, T&P, sundries, labour cess etc complete and as per the directions of Engineer-in-Charge.
1023.13
189780
185.49
... More
Cement concrete (1:3:6) with 40mm size HGCB metal including cost, conveyance, royalty, lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per the directions of Engineer-in-Charge.
25.81
167018
6470.06
... More
Fabrication and supply of 'Y'- shaped main posts and plain strut posts of M.S-angle 65 x 65 x 5 mm ISA as per design at site of required length with provision of fixing hooks of 8 mm dia HYSD rod of 10 cm long 26 nos per post and bottom to be 'T' shaped with M.S angle 65 x65 x 5 mm ISA at right angle in opposite direction 40 cm long each etc including cutting, bending, shaping, welding of strut with main 'Y' post including cost of all materials, conveyance, all labour , T&P, sundries, fabrication charges, all lead, lift, delift and labour cess etc complete and as per the directions of Engineer-in-Charge.
-
-
-
... More
Strut post with 65mm x 65mm x 5mm M.S ISA.
204
375137
1838.91
... More
Earth work in stoney earth and gravels mixed with stone boulder not exceeding 0.014 cum in volume within 50.00 mtr lead and 1.50 mtr initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layer not exceeding 0.30 mtr in depth including all labour, T &P, sundries, lead, lift, delift and labour cess etc complete and as per the directions of Engineer-in-Charge.
166.72
70124
420.61
... More
Cement concrete (1:2:4) for P.C.C works with 12mm size HGCB chips including cost, conveyance , royalty, all labour, T&P, sundries, lead, lift, delift, labour cess and curing etc complete in ground floor and as per the directions of Engineer-in-Charge.
121.72
994678
8171.86
... More
Main fencing post with 65mm x 65mm x 5mm M.S ISA. ('Y' Post).
502
1396056
2780.99
... More
Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost of all materials complete including all labour, T&P, sundries, lead, lift, delift and labour cess etc complete and as per the directions of Engineer-in-Charge.
-
-
-
... More
Filling in foundation & plinth with excavated materials including all cost of labour, T & P, sundries and labour cess etc complete and as per the directions of Engineer-in-Charge.
111.15
31165
280.4
... More
Filling foundation & plinth with sand, well watered & rammed including cost, conveyance, royalty, T&P, sundries, lead, lift, delift and labour cess etc complete and as per the directions of Engineer-in-Charge.
12.91
18785
1455.43
... More
Priming one coat with red oxide primer of Asian/ Berger/ Shalimar/ Nerolac make including cost of primer, brush, all labour, T&P, sundries, labour cess etc complete and as per the directions of Engineer-in-Charge.
1023.13
75977
74.26
... More
Fencing with angle iron post placed at required distance embeded in cement concrete blocks, every 12 th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonal interwoven with horizontal SRPBT runner strands of concertina coil wire weighing 43.478 gm per mtr (minimum), between the two posts fitted and fixed with G.I staples, turn buckles etc complete including cost, conveyance , all labour, T&P, sundries, lead, lift, delift, labour cess etc complete and as per the directions of Engineer-in-Charge. (Cost of posts ,struts, earth work and concrete work to be paid separately). Payment to be made per metre cost of total length of concertina coil wire used.
34890
718385
20.59
... More
RCC foundation, plinth band and footing bases of cloumns , mass concrete and precast RCC slab etc .
199.56
49899
250.05
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements