Odisha Construction Corporation Limited Tender

... More
The OCCL has issued a formal invitation for competitive bids for the Odisha Construction Corporation Limited project, for E-procurement Notice No.11/occl/2023-24 (on-line) in Ganjam, Odisha, with an estimated contract value of Rs. 67,92,000. The bid opening date for this tender is 20-05-2023 and the last date for bid submission is 05-06-2023. Interested bidders for Odisha Construction Corporation Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Odisha Construction Corporation Limited - OCCL Tender

Civil And Construction
Bridge Construction
Eprocure
Opening Date20 May 2023
Closing Date5 Jun 2023
Tender Amount₹ 67,92,000 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

E-procurement Notice No.11/occl/2023-24 (on-line)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection, Commissioning, Testing of 03(Three) sets of Spillway Gates

100

-

-

... More
Erection, Commissioning, Testing of 03(Three) sets of Trunnion walkway

12

-

-

... More
Painting of 03(Three) sets of 30 T rope drum Hoists for 03(Three) sets of Spillway Gates after blast cleaning process performed with as per requirements & class 'B' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint confirming to IS 2932 : 1974 to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.

744

-

-

... More
Painting of Hoist supporting structure & Trestles for 03(Three) sets of 30T rope drum Hoists for 03(Three) sets of Spilway after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.

1815

-

-

... More
Erection of latch arrangements for 03(Three) Nos. of Spillway

6

-

-

... More
2nd stage concreting of embedded parts of 03(Three) sets of Spillway Gates including hoist supporting structures, trestles & walkway by M25 grade concrete using 20mm and down grade agregates.

35

-

-

... More
Painting of 03(Three) sets of latch arrangements for 03(Three) Nos. of bay after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.

66

-

-

... More
Erection of 1st stage & 2nd Stage Embedded Parts including erection of dummy where required for 03(Three) sets of Spillway Gates

12.5

-

-

... More
Painting of 03(Three) sets of Spillway Gates after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.

2145

-

-

... More
Erection, Commissioning, Testing of 03(Six) sets of 30 T rope drum hoist for 03(Three) sets of Spillway Gates

22

-

-

... More
Dismantling of working platform erected for 03(Three) sets of Radial Gates

30

-

-

... More
Erection of 1 st stage Embedded Parts for 03(Three) sets of Stoplog

2

-

-

... More
Erection, Commissioning, Testing of hoist supporting Structures for 03(Three) sets of 30 T rope drum hoist

41

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.