Odisha Construction Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 60,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
E-procurement Notice No10/occl/2023-24 (on-line)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_OCCL_88872_1Bid Award Id
ViewTender No
E-Procurement Notice No10/OCCL/2023-24 (on-line)Tender Authority
Odisha Construction Corporation Limited ViewPurchaser Address
-Website
http://https://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dismantling of 05 (five) sets of Central Drive & erection of same after repair / renovation including trial testing of 05 (five) sets of rope drum hoist after fixing of wire ropes to newly replaced vertical Gates
5
-
-
... More
Dismantling, removal, shifting of damaged chequered plates of Hoist platform & Walkway
15
-
-
... More
Fixing & erection of new chequered plates in Hoist platform & Walkway including new hand railing & ladder
15
-
-
... More
Core drilling holes for removal of existing anchor bars & fixing of new anchor bars of size Ø 30 x 400 mm in trestle foundation by apply epoxy grouting
24
-
-
... More
Painting of 05 (five) sets of Vertical lift Gates of size 8000mm x 3600mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
1200
-
-
... More
Painting of 05 (Five) sets of Rope drum Hoists & trestles structures for 05(five) sets Vertical lift Gates of size 8000mm x 3600mm after blast cleaning process performed with as per requirements & class 'B' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint confirming to IS 2932 : 1974 to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
500
-
-
... More
Painting of Hoist platform & walkway structure including new chequered plates, hand railing and ladder after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
750
-
-