The ORULB has issued a formal invitation for competitive bids for the Municipal Corporation project, for Construction Of Road From Prusty Babu Res To Chitta Ranjan Jena Res And Mukesh Ray Res At Bidyadharpur In Ward No.55. in Cuttack, Odisha, with an estimated contract value of Rs. 21,87,024. The bid opening date for this tender is 03-06-2025 and the last date for bid submission is 13-06-2025. Interested bidders for Municipal Corporation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Municipal Corporation - ORULB Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jun 2025
Closing Date13 Jun 2025
Tender Amount₹ 21,87,024 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & laying cement concrete of prop. (1:4:8) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge.

129.6

5977

-

... More
Providing & laying cement concrete of prop. (1:2:4) in foundation bed and floors using 12mm nominal size down graded, screened, washed hard black crusher broken granite Chips of approved quality & from approved quarry including laying in the layers not exceeding 150 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge.

24.75

8019

-

... More
R.C.C. work of M20 having minimum compressive strength (working stress) 200kg./cm2 in 15cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12mm to 20mm size (1/2” to 3/4”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer-in-charge

31.5

6576

-

... More
Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/bent up M.S. rods/Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 guage binding wire required for R.C.C. work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wires will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S. rods or Tor steel linear measurements of rod for finished item of works. 5 % wastage and lap length are included in the finished rate).

12.6

9382

-

... More
Rigid smooth centring and shuttering R.C.C. Foundation, Plinth Band, Footings, Column Base, Mass Concrete & Precast Slabs etc.

450

247

-

... More
Providing & laying of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make,design,colour and size made by block Machine with proper compaction laid in required and approved pattern etc. complete in all respect conforming to IRC_SP-63 2018 The RATe shall include cost of Materials, laying in approved pattern, transportation, loading, unloading charges including filling the joint with approved materials etc.Complete.

811.5

608

-

... More
Removing the excavated materials from site by mechanical means with loading and unloading the same within 5km away from site.

50

278

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.