Minor Irrigation Department Tender

... More
The Minor Irrigation Department has issued a formal invitation for competitive bids for Balance Work Of Kandulibandha Under Oiipcra in Ganjam, Odisha, with an estimated contract value of Rs. 29,26,000. The bid opening date for this tender is 21-12-2024 and the last date for bid submission is 15-01-2025. Interested bidders for Minor Irrigation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Minor Irrigation Department Tender

Opening Date21 Dec 2024
Closing Date15 Jan 2025
Tender Amount₹ 29,26,000 
Notes
Download

Costs

Summary

Balance Work Of Kandulibandha Under Oiipcra

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of foundation to proper profile in all kinds of soil with all leads and lifts including dressing and leveling the bed to proper slope and level and making it fit for laying concrete and depositing the excavated materials clear of work site within all leads and lifts etc including dewatering from foundation if necessary etc with supply of all labour, all taxes as per prevailing norm and T&P required for the work etc complete in all respects as directed by the Engineer-in-charge.

11.49

269

-

... More
Dismantling brick or stone masonry in clay, lime or cement mortar including stacking the useful materials for reuse and removing the debris with all leads & lifts including all labour, taxes as per prvailing norm, T & P etc. required for the item & as per direction of engineer-in-charge.

13.41

1569

-

... More
Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with all lifts and delifts including dressing of slopes and bed to design level & section ( benching & stripping of Dam )and depositing the excavated materials away from the work site as per the specification from the place of excavation including supply of all labour, all taxes as per norm, construction & maintaining haul roads required for the work etc. complete as directed by the Engineer-in-charge.

703.79

83

-

... More
Clearing and grubbing jungles including uprooting tank vegetation, grass bushes, shrubs, saplings and trees of girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviciable material and stacking of useful materials with supply of all labour T & P and all taxes as per prevailing norm etc. complete as directed by the Engineer-in-charge.

10000

-

-

... More
Labour for laying and fixing reinforced cement concrete hume pipes with collars jointed with cement mortar (1:3) complete including cost, conveyance royalty and other taxes of all materials required for the work with supply of all labour and T& P required for the item etc. complete in all respects as directed by the Engineer-in-charge. (RCC HP 300 mm dia NP3)

12.5

921

-

... More
Rough Stone Dry packing in approns and revetments to all height, profile and level using hard granite broken stone of 30 cm. and above size and above of approved quality, quarried, free from weathered skin including filling the interstices with small stone wedges including cost, conveyance and other taxes of all materials, labour, all taxes as per prevailing norm and T&P alongwith supply of all labour required for the work complete in all respects as directed by the Engineer-in-Charge. (Using Deptt. Stone)

9.7

1048

-

... More
Providing rip-rap to the slopes of earth dam and dyke with quarried and blasted granite stone boulders of sizes 0.30m and above size (one man stone) including dumping on slopes, filling interstices with small stones wedges and packing the surface to proper line and levels including fixing wave breakers complete with all leads and lifts including cost, conveyance, royalty and taxes of materials, supply of all labour, all taxes as per prevailing norm and T&P required to complete the work as directed by the Engineer-in-Charge. ( No deduction to be made towards voids in finished section.)

781.6

1707

-

... More
Providing rigid, smooth centering & shuttering for concrete works including false work and including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delfts including supply of all labour, all tases as per prevailing norm and T & P required for the items etc. complete in all respect as directed by Engineer-in-charge. (For Foundation and Plinth)

80.04

247

-

... More
Watering earth work upto the O M C condition and compaction by sheepfoot rollers /by standard vibrator / short drum width vibratory power roller to earth layers not exceeding 22.5cm to 95% of MDD (maximum dry density) including hire and running charges of the all machineries,labour, all taxes as per prevailing norm, T&P and water complete as per direction of Engineer-in-charge. (Measurement to be taken on the finished compacted section of the fill under O M C condition).

5099.13

47

-

... More
Labour for spreading moorum and consolidation with with light HRR including watering but including cost and conveyance of moorum and including all labour, T&p, taxes royalty required to complete the item as directed by the Engineer-in-Charge.

225

1301

-

... More
Filling foundation & plinth with excavated materials including watering & ramming to all heights with all leads & lifts with supply of all labour, all taxes as per norm and T&P required for the work etc complete in all respects as directed by the Engineer-in-charge.

234.6

149

-

... More
Excavation of the approved type of soil in approved borrow area by mechanical means, loading into and transportation by mechanical means and unloading the soil on properly prepared and scientifically approved surface including spreading & levelling the earth in layers of 22.5cm thick to make ready for watering and compaction with dozers/ by standard vibrator / short drum width vibratory power roller but excluding watering & compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area including hire & running charges of all materials, labour all taxes as per prevailing norm etc. complete as per direction of Engineer-in-Charge.(Measurement will be taken in the finished approved level section. 1/6th volume will be deducted towards settlement for embankment only)

5099.13

83

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.