Ministry Of Road Transport And Highways Tender
... More
The MORTH has issued a formal invitation for competitive bids for the Ministry Of Road Transport And Highways project, for Consultancy Services For Preparation Of Detailed Project Report For Construction Of Rairakhol Town Bypass On Nh-153b in Sambalpur, Odisha. The bid opening date for this tender is 24-03-2025 and the last date for bid submission is 09-05-2025. Interested bidders for Ministry Of Road Transport And Highways tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Costs
EMD
0Document Cost
₹ 5,900Tender Fee
₹ 5,900
Summary
Consultancy Services For Preparation Of Detailed Project Report For Construction Of Rairakhol Town Bypass On Nh-153b
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MoRTH_854342_1Tender No
03-ROBBSR-2024-25/DPR-3rd callTender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
To be filled by Consultant
10
-
-
... More
Traffic Survey
1
-
-
... More
To be filled by Consultant
10
-
-
... More
Draft Detailed Design Report & Drawings etc.
1
-
-
... More
Socio-economic & Census Survey/ Studies
1
-
-
... More
Roughness Survey
1
-
-
... More
Peon
10
-
-
... More
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.
A. For use of consultants
10
-
-
... More
Land Acquisition Expert
10
-
-
... More
IX Survey and Investigation
-
-
-
... More
Final Feasibility Report
1
-
-
... More
III. Transportation (Fixed costs)
-
-
-
... More
Draft Bidding Documents
1
-
-
... More
Reports and Document Printing
-
-
-
... More
Final EMP
1
-
-
... More
Monthly Report (per month)
1
-
-
... More
B. Investigation (Fixed cost)
-
-
-
... More
Sub-Soil Investigation (Boring)
-
-
-
... More
Quantity Surveyor
7
-
-
... More
Office Supplies, Utilities and Communication ( Fixed Costs )
-
-
-
... More
Any other investigations/surveys
1
-
-
... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
1
-
-
... More
To be filled by Consultant
10
-
-
... More
(b) Boaring in hard rock
1
-
-
... More
To be filled by Consultant
10
-
-
... More
LA & Clearances II Report
1
-
-
... More
Material-cum-Geo-technical Engineer
7
-
-
... More
Typist
10
-
-
... More
(a) Boaring in all type of soils (other than hard rock)
1
-
-
... More
Bridge Engineer
6
-
-
... More
Environmental Specialist
5
-
-
... More
Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc.
10
-
-
... More
FWD Test and Pavement Evaluation
1
-
-
... More
Land Acquisition Studies
1
-
-
... More
Road and Bridge Inventory
1
-
-
... More
Final Bidding Documents
1
-
-
... More
Environment and Social Impact
Screening Report
1
-
-
... More
GPR Survey for detection of under ground utilities
1
-
-
... More
Highway Engineer
6
-
-
... More
Domestic and International Communication
10
-
-
... More
Night Watchman
10
-
-
... More
Draft Environmental Assessment report & RAP
1
-
-
... More
To be filled by Consultant
10
-
-
... More
Printer
10
-
-
... More
Utility Expert
5
-
-
... More
Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology
1
-
-
... More
Material Survey and Investigation
1
-
-
... More
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
1
-
-
... More
Office Boy
10
-
-
... More
Key Personnel (Professional Staff)
-
-
-
... More
Final LA and Clearances I Report
1
-
-
... More
Axle Load Survey
1
-
-
... More
Draft Feasibility Report
1
-
-
... More
Strip Plan with L.A. Reports
1
-
-
... More
Office Supplies Drafting
10
-
-
... More
Ex-Patwari or equivalent
10
-
-
... More
Typist
10
-
-
... More
Team Leader cum Highway Engineer
10
-
-
... More
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
10
-
-
... More
Duty Travel to Site (Fixed Costs)
1
-
-
... More
Supplies computer
10
-
-
... More
Sub-grade Investigation
1
-
-
... More
To be filled by Consultant
10
-
-
... More
Cost of supply and fixing boundary pillars
-
-
-
... More
To be filled by Consultant
10
-
-
... More
Land acquisition Team including support staff and logistics/transportation
-
-
-
... More
EX-kanoogo/Girdwar or equivalent
10
-
-
... More
Office Furniture and Equipment
1
-
-
... More
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
1
-
-
... More
Draft LA and Clearances I Report
1
-
-
... More
Logistic for Land Acquisition Team
-
-
-
... More
Computer including necessary peripherals
10
-
-
... More
Office Manager
10
-
-
... More
NET WORK SURVEY AND GPR
-
-
-
... More
Office Furniture and Equipment ( Rental )
-
-
-
... More
Survey Engineer
8
-
-
... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
1
-
-
... More
Inception Report & QAP
1
-
-
... More
Support Staff
-
-
-
... More
Draft EMP
1
-
-
... More
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
1
-
-
... More
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
-
-
-
... More
Ex-Land revenue inspector/officer or equivalent
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements