Forest Environment And Climate Change Department Tender

... More
The Forest Environment And Climate Change Department has issued a formal invitation for competitive bids for Construction Of Compound Wall 453 Mtr At Rccf Residence In Angul For The Year 2024-25 in Dhenkanal, Odisha, with an estimated contract value of Rs. 31,39,000. The bid opening date for this tender is 24-02-2025 and the last date for bid submission is 05-03-2025. Interested bidders for Forest Environment And Climate Change Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Forest Environment And Climate Change Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date24 Feb 2025
Closing Date5 Mar 2025
Tender Amount₹ 31,39,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling foundation and plinth with clean course sand, well watered and rammed with cost, conveyance, royalty and taxes of all materials and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge.

13.24

659

8735.75

... More
Finishing wall with water proofing weather coat paint of approved shade on new works two coats to give an even shade excluding cost of paint and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge.

1630.8

99

162427.68

... More
Fly ash Brick masonary in C.M. (1:6) in super structure using bricks of 25cm x 11cm x 8 cm size having crushing strength not less than 75kg/Cm2 with dimensional tolerance +8% with cost conveyance ,royality, taxes of all materials etc. complete.

192.52

5306

1021549.62

... More
Cement Concrete (1:3:6 ) using 40 mm size hard black granite crusher broken metals with cost conveyance, taxes of all materials and labour etc. complete as per direction of Engineer-in-charge

15.24

5748

87613.24

... More
Priming wall surface with Primer of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete.

1630.8

80

131442.48

... More
Excavation of Foundation in hard soil, Levelling foundation trench etc complete including cost of labour, Labour cess, T&P materials etc. complete and as per the direction of the Engineer-in-charge.

99.64

270

26992.48

... More
Providing cement concrete of grade M-20 using 20 mm down graded size hard granite crusher broken chips and sharp sand of approved quality from approved quarry, mixing, hoisting, lowering, laying, compacting and curing for specified days with cost, carriage, royality and taxes of all materials and cost of all labour, T&P, workers welfare cess etc complete and as per direction of the Engineer-in-charge.

80.91

5597

452877.54

... More
Rigid smooth centering & shuttering for plain C.C / R.C.C. works including removing the same after specified days of casting with cost of all labour, T&P, nail, workers welfare cess etc. complete as per approved specification and direction of the Engineer-in- Charge

418.5

247

103578.75

... More
Filling foundation and plinth with excavated materials, well watered and rammed with taxes of all materials and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge.

33.21

150

4998.11



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.