Forest Environment And Climate Change Department Tender

... More
The Forest Environment And Climate Change Department has issued a formal invitation for competitive bids for Construction Of Smc Structure At Panposh in Sundergarh, Odisha, with an estimated contract value of Rs. 79,37,845. The bid opening date for this tender is 01-11-2023 and the last date for bid submission is 10-11-2023. Interested bidders for Forest Environment And Climate Change Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Forest Environment And Climate Change Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date1 Nov 2023
Closing Date10 Nov 2023
Tender Amount₹ 79,37,845 
Notes
Download

Costs

Summary

Construction Of Smc Structure At Panposh

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fixing of GI Wire mesh 10 gauge with 100 mm x 100 mm spaced weight @ 1.45 Kg/Sq.-mt. over Dry stone masonry or rough stone dry masonry for guard walls and retaining walls including cost and conveyance all materials and cost of all labour T&P required for the work complete as per the direction of the EIC.

2296.63

219810

95.71

... More
Dry stone masonry or rough stone dry masonary for guard walls and retaining walls with Stone other than granite quarried including head load 150 mtr cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work complete as per the direction of the EIC. - For Location North Chiribeda RF

85.82

134296

1564.79

... More
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC.

9000

18810

2.09

... More
Rough stone dry packing in approns and revetments with Stone other than granite (15cm to 30cm) complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC.

1230.37

2055523

1670.66

... More
Fine dressing and turfing with initial lead of 50m and 1.5m initial lift including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC.

4242.64

49978

11.78

... More
Dry stone masonry or rough stone dry masonary for guard walls and retaining walls with Stone other than granite quarried including head load 150 mtr cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work complete as per the direction of the EIC. - For Location South Chiribeda RF

85.82

142196

1656.84

... More
Ramming or rolling eath work with light H.R.R. in embankment in layers not exceeding 0.3m including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC.

9000

159210

17.69

... More
Earth work in stony earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department including cost and conveyance & taxes of all materials and cost of all labour T&P required for the work complete as per the direction of the EIC.

1120.44

301084

268.72

... More
Excavation in all kinds of soil including moorum, stoney earth, gravel etc.excepting all kinds of rock & boulders exceeding 0.014Cum in volume for dam base stripping, cut-off trenches, outfall drains and stripping in borrow areas including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 1.5m initial lift including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.

900

169506

188.34

... More
Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC.

11485.28

46055

4.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.