Directorate Of Ports And Inland Water Transport Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Directorate Of Ports And Inland Water Transport - PIWT Tender

Civil And Construction
Building Construction
Eprocure
Opening Date8 Aug 2023
Closing Date24 Aug 2023
Tender Amount₹ 1,99,13,132 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation of ordinary soil within 50 m, initial lead and1.5m initial lift including rough dressing & breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.3m in depth and earth trasported by transport vehicles as per the direction of the Engineer-in-charge. Construction of C. Toilet -5.42Cum

5.42

834

153.9

... More
Earth work in excavation of ordinary soil within 50 m, initial lead and1.5m initial lift including rough dressing & breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.3m in depth and earth trasported by transport vehicles as per the direction of the Engineer-in-charge. Construction of Water Point Shed -0.43Cum

0.43

66

153.9

... More
Earth work in excavation of ordinary soil within 50 m, initial lead and1.5m initial lift including rough dressing & breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.3m in depth and earth trasported by transport vehicles as per the direction of the Engineer-in-charge. Septic Tank & Soakpit -20.00Cum

20

3078

153.9

... More
Providing Single under reamed pile foundation of size 300 mm dia with R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering and laying concrete and including cost, conveyance, royalties and taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as per direction of Engineer-in-charge (excluding cost and conveyance of M.S. rods or Tor steel and binding wires of 18 to 20 gauge and labour charges for strengthening, cutting, bending grills and placing in proper position.) Gear Shed -60.00Nos

60

368454

6140.9

... More
Providing Single under reamed pile foundation of size 300 mm dia with R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering and laying concrete and including cost, conveyance, royalties and taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as per direction of Engineer-in-charge (excluding cost and conveyance of M.S. rods or Tor steel and binding wires of 18 to 20 gauge and labour charges for strengthening, cutting, bending grills and placing in proper position.) Construction of O.H.T -12.00Nos

12

73690

6140.9

... More
Providing Single under reamed pile foundation of size 300 mm dia with R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering and laying concrete and including cost, conveyance, royalties and taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as per direction of Engineer-in-charge (excluding cost and conveyance of M.S. rods or Tor steel and binding wires of 18 to 20 gauge and labour charges for strengthening, cutting, bending grills and placing in proper position.) Construction of C. Toilet -9.00Nos

9

55268

6140.9

... More
Cut & dress each pile head to required lines & levels etc. complete as per direction of the Engineer-in-charge. Gear Shed -60.00Nos

60

48786

813.1

... More
Cut & dress each pile head to required lines & levels etc. complete as per direction of the Engineer-in-charge. Construction of O.H.T. -12.00Nos

12

9757

813.1

... More
Cut & dress each pile head to required lines & levels etc. complete as per direction of the Engineer-in-charge. Construction of C. Toilet -9.00Nos

9

7317

813.1

... More
Supplying, filling in foundation and plinth with good quality of filling sand including watering and ramming, poking & compacting including cost, conveyance, royalties, of the materials, cost of all labour, labour cess, T&P etc. required for the work etc. complete as directed by the Engineer-in-Charge. Gear Shed -103.89Cum

103.89

46449

447.1

... More
Supplying, filling in foundation and plinth with good quality of filling sand including watering and ramming, poking & compacting including cost, conveyance, royalties, of the materials, cost of all labour, labour cess, T&P etc. required for the work etc. complete as directed by the Engineer-in-Charge. Renovation of A.Hall, Compound wall, Pavement & New paved area -180.90Cum

180.9

80880

447.1

... More
Supplying, filling in foundation and plinth with good quality of filling sand including watering and ramming, poking & compacting including cost, conveyance, royalties, of the materials, cost of all labour, labour cess, T&P etc. required for the work etc. complete as directed by the Engineer-in-Charge. Construction of O.H.T. -6.00Cum

6

2682

447.1

... More
Supplying, filling in foundation and plinth with good quality of filling sand including watering and ramming, poking & compacting including cost, conveyance, royalties, of the materials, cost of all labour, labour cess, T&P etc. required for the work etc. complete as directed by the Engineer-in-Charge. Construction of Water Point Shed -0.60Cum

0.6

268

447.1

... More
Supplying, filling in foundation and plinth with good quality of filling sand including watering and ramming, poking & compacting including cost, conveyance, royalties, of the materials, cost of all labour, labour cess, T&P etc. required for the work etc. complete as directed by the Engineer-in-Charge. Construction of C. Toilet -11.28Cum

11.28

5043

447.1

... More
Supplying, filling in foundation and plinth with good quality of filling sand including watering and ramming, poking & compacting including cost, conveyance, royalties, of the materials, cost of all labour, labour cess, T&P etc. required for the work etc. complete as directed by the Engineer-in-Charge. Septic Tank & Soapkit -3.00Cum

3

1341

447.1

... More
Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm size black hard crusher broken granite stone metal and screened washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, of all materials and cost of all labours, labour cess, T&P etc required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc. complete as directed by the Engineer-in-charge. Gear Shed -21.66Cum

21.66

138546

6396.4

... More
Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm size black hard crusher broken granite stone metal and screened washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, of all materials and cost of all labours, labour cess, T&P etc required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc. complete as directed by the Engineer-in-charge. Renovation of A.Hall, Compound wall, Pavement & New paved area -89.67Cum

89.67

573565

6396.4

... More
Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm size black hard crusher broken granite stone metal and screened washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, of all materials and cost of all labours, labour cess, T&P etc required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc. complete as directed by the Engineer-in-charge. Construction of O.H.T. -5.10Cum

5.1

32621

6396.4

... More
Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm size black hard crusher broken granite stone metal and screened washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, of all materials and cost of all labours, labour cess, T&P etc required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc. complete as directed by the Engineer-in-charge. Construction of Water Point Shed -0.14Cum

0.14

895

6396.4

... More
Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm size black hard crusher broken granite stone metal and screened washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, of all materials and cost of all labours, labour cess, T&P etc required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc. complete as directed by the Engineer-in-charge. Construction of C. Toilet -4.46Cum

4.46

28527

6396.4

... More
Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm size black hard crusher broken granite stone metal and screened washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, of all materials and cost of all labours, labour cess, T&P etc required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc. complete as directed by the Engineer-in-charge. Septic Tank & Soakpit -1.11Cum

1.11

7100

6396.4

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge.Ground Floor Gear Shed -59.07Cum

59.07

400724

6783.9

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge.Ground Floor Renovation of A.Hall, Compound wall, Pavement & New paved area -373.24 cum

373.24

2532022

6783.9

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge.Ground Floor 20 KL OHT -31.88Cum

31.88

216270

6783.9

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge.Ground Floor Construction of C. Toilet -16.92Cum

16.92

114783

6783.9

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge.Ground Floor Construction of Water Point Shed -1.03Cum

1.03

6987

6783.9

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. Ground Floor Septic Tank & Soakpit -0.54Cum

0.54

3663

6783.9

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. Ground Floor Renovation of Jetty -40.91Cum

40.91

277529

6783.9

... More
P.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. Ground Floor Renovation of A.Hall, Compound wall, Pavement & New paved area -93.12Cum

93.12

631716

6783.9

... More
P.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. Ground Floor Septic Tank & Soakpit -0.47Cum

0.47

3188

6783.9

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. First Floor Gear Shed -44.02Cum

44.02

302655

6875.4

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. First Floor 20 KL OHT -3.51Cum

3.51

24132

6875.4

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. Second Floor Gear Shed -2.73Cum

2.73

19057

6980.7

... More
R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg / Cm2 in 15 cm. cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 12 to 20 mm size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying concrete with centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights and compacting by using vibrators watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where ever necessary in all floors including cost, conveyance, royalties and of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer in-charge. Second Floor 20 KL OHT -16.65Cum

16.65

116228

6980.7

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Ground Floor Gear Shed -84.51 Qntl

84.51

753617

8917.5

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Ground Floor Renovation of A.Hall, Compound wall, Pavement & New paved area

149.29

1331293

8917.5

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Ground Floor Renovation of Jetty -26.59 Qntl

26.59

237116

8917.5

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Ground Floor Construction of Water Point Shed -1.03Qntl

1.03

9185

8917.5

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Ground Floor Septic Tank & Soakpit -0.43Qntl

0.43

3834

8917.5

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Ground Floor 20 KL O.H.T. -46.22Qntl

46.22

412166

8917.5

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Ground Floor Construction of C. Toilet -20.44 Qntl

20.44

182273

8917.5

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. First Floor Gear Shed -45.61 Qntl

45.61

407890

8943

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. First Floor 20 KL O.H.T. -3.51Qntl.

3.51

31389

8943

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Second Floor Gear Shed -2.73 Qntl

2.73

24487

8969.9

... More
Straightening cutting bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S rods or tor confirming to I.S 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C works including cost, conveyance and taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge including cost of all labour, labour, labour cess, T & P etc required for the work etc. complete as directed by the Engineer in Charge. Second Floor 20 KL O.H.T. -16.65Qntl.

16.65

149348

8969.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. foundation and footing bases of columns mass concrete pre-cast slab etc. Gear Shed -121.05 Sqm

121.05

28313

233.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. foundation and footing bases of columns mass concrete pre-cast slab etc. Renovation of A.Hall, Compound wall, Pavement & New Paved area -244.16 sqm

244.16

57109

233.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. foundation and footing bases of columns mass concrete pre-cast slab etc. Renovation of Jetty -57.20 Sqm

57.2

13379

233.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. foundation and footing bases of columns mass concrete pre-cast slab etc. 20 KL O.H.T. -12.96Sqm

12.96

3031

233.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. foundation and footing bases of columns mass concrete pre-cast slab etc. Construction of Water Point Shed -13.04 Sqm

13.04

3050

233.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Beams, Columns, Grider and Bressmer etc. Ground Floor Gear Shed -211.42Sqm

211.42

211927

1002.4

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Beams, Columns, Grider and Bressmer etc. Ground Floor Construction of C. Toilet -90.50Sqm

90.5

90717

1002.4

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Beams, Columns, Grider and Bressmer etc. Ground Floor 20 KL O.H.T. -123.30Sqm

123.3

123595

1002.4

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Beams, Columns, Grider and Bressmer etc. First Floor Gear Shed -184.42 Sqm

184.42

221838

1202.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Beams, Columns, Grider and Bressmer etc. First Floor 20 KL O.H.T. -34.20Sqm

34.2

41139

1202.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Beams, Columns, Grider and Bressmer etc. Second Floor 20 KL O.H.T. -23.40Sqm Total Quantity -23.40 Sqm

23.4

33777

1443.5

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Lintels. Ground Floor Gear Shed -61.47 Sqm

61.47

32376

526.7

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Lintels. Ground Floor Construction of C. Toilet -17.99Sqm

17.99

9475

526.7

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Lintels. First Floor Gear Shed -61.47 Sqm Total Quantity -61.47 Sqm

61.47

38855

632.1

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Lintels. Second Floor Gear Shed -22.22 Sqm Total Quantity -22.22 Sqm

22.22

16853

758.5

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Roof Slab Ground Floor Gear Shed -210.52 Sqm

210.52

141448

671.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Roof Slab Ground Floor Construction of C. Toilet -53.95Sqm

53.95

36249

671.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Roof Slab Ground Floor 20 KL O.H.T. -26.55Sqm

26.55

17838

671.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Roof Slab Ground Floor Septic Tank & Soakpit -4.43Sqm

4.43

2976

671.9

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Roof Slab First Floor Gear Shed -210.52 Sqm

210.52

169742

806.3

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Roof Slab First Floor 20 KL O.H.T. -124.92Sqm

124.92

100723

806.3

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Stair Case Ground Floor Gear Shed -12.15 Sqm Total Quantity -12.15 Sqm

12.15

10840

892.2

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting in all floors & all heights including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. R.C.C. Stair Case First Floor Gear Shed -12.15 Sqm Total Quantity -12.15 Sqm

12.15

13007

1070.6

... More
Providing 2.5cm thick Grading Concrete (1:2:2) using 6mm size hard black granite crusher broken chips. including mixing, hoisting lowering and laying concrete with watering curing with cost, conveyance royalities and of all materials etc. complete with 1% water proofing compound as per the direction of Engineer-in-charge. Ground Floor Gear Shed -195.54 Sqm

195.54

68223

348.9

... More
Providing 2.5cm thick Grading Concrete (1:2:2) using 6mm size hard black granite crusher broken chips. including mixing, hoisting lowering and laying concrete with watering curing with cost, conveyance royalities and of all materials etc. complete with 1% water proofing compound as per the direction of Engineer-in-charge. Ground Floor Septic Tank & Soakpit -5.46Sqm

5.46

1904

348.9

... More
Providing 2.5cm thick Grading Concrete (1:2:2) using 6mm size hard black granite crusher broken chips. including mixing, hoisting lowering and laying concrete with watering curing with cost, conveyance royalities and of all materials etc. complete with 1% water proofing compound as per the direction of Engineer-in-charge. First Floor Gear Shed -195.54 Sqm Total Quantity -195.54 Sqm

195.54

80054

409.4

... More
Providing 2.5cm thick Grading Concrete (1:2:2) using 6mm size hard black granite crusher broken chips. including mixing, hoisting lowering and laying concrete with watering curing with cost, conveyance royalities and of all materials etc. complete with 1% water proofing compound as per the direction of Engineer-in-charge. Scond Floor Gear Shed -21.47 Sqm Total Quantity -21.47 Sqm

21.47

9633

448.7

... More
Brick work with Flyash bricks 25cm x 12cm x 8cm of size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Foundation & Plinth) Gear Shed -36.76 Cum

36.76

195085

5307

... More
Brick work with Flyash bricks 25cm x 12cm x 8cm of size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Foundation & Plinth) Water Point Shed -0.75 Cum

0.75

3980

5307

... More
Brick work with Flyash bricks 25cm x 12cm x 8cm of size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Foundation & Plinth) C. Toilet -1.49Cum

1.49

7907

5307

... More
Brick work with Flyash bricks 25cm x 12cm x 8cm of size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Foundation & Plinth) Septic Tank & Soakpit -5.12Cum

5.12

27171

5307

... More
Brick work with Flyash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Superstructure) Ground Floor Gear Shed - 11.95 Cum

11.95

63816

5340.3

... More
Brick work with Flyash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Superstructure) Ground Floor O.H.T. -14.38Cum

14.38

76793

5340.3

... More
Brick work with Flyash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Superstructure) Ground Floor C. Toilet -19.71Cum

19.71

105257

5340.3

... More
Brick work with Flyash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Superstructure) First Floor Gear Shed - 11.95 Cum Total Quantity = 11.95 Cum

11.95

67254

5628

... More
Brick work with Flyash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance ± 2 percent in cement mortar (1:4) etc. complete including cost, conveyance, royalties, of all materials, cost of all labour, labour cess, all T&P etc. required for the work complete in all respect as directed by the Engineer-in-charge. (Superstructure) Second Floor Gear Shed - 18.94 Cum Total Quantity = 18.94 Cum

18.94

112859

5958.8

... More
Providing 12 mm thick cement plaster over brick work with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and of all materials with cost of all labour, labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. Ground Floor Gear Shed -839.06 Sqm

839.06

141465

168.6

... More
Providing 12 mm thick cement plaster over brick work with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and of all materials with cost of all labour, labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. Ground Floor Renovation of A.Hall, Compound wall, Pavement & New paved area -1118.75 Sqm

1118.75

188621

168.6

... More
Providing 12 mm thick cement plaster over brick work with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and of all materials with cost of all labour, labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. Ground Floor 20KL O.H.T. -161.20Sqm

161.21

27180

168.6

... More
Providing 12 mm thick cement plaster over brick work with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and of all materials with cost of all labour, labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. Ground Floor C. Toilet -213.03Sqm

213.03

35916

168.6

... More
Providing 12 mm thick cement plaster over brick work with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and of all materials with cost of all labour, labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. First Floor Gear Shed -839.06 Sqm

839.06

144402

172.1

... More
Providing 12 mm thick cement plaster over brick work with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and of all materials with cost of all labour, labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. First Floor 20KL O.H.T. -46.80Sqm

46.8

8054

172.1

... More
Providing 12 mm thick cement plaster over brick work with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and of all materials with cost of all labour, labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. Second Floor Gear Shed -135.78 Sqm

135.78

23870

175.8

... More
Providing 12 mm thick cement plaster over brick work with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and of all materials with cost of all labour, labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. Second Floor 20KL O.H.T. -110.88Sqm

110.88

19492

175.8

... More
12mm thick cement plaster ( Outside ) in cement mortar (1:4) including closed deep chipping with slurry treatment to the R.C.C. surfaces finished smooth including watering and curing, rounding of corners with cost, conveyance, royalties and of all materials and cost of all labour, scaffolding, sundries and T&P. etc. required for the work etc. complete as directed by the Engineer in charge. Ground Floor. Renovation of Jetty - 72.36 Sqm

72.36

12757

176.3

... More
12mm thick cement plaster ( Outside ) in cement mortar (1:4) including closed deep chipping with slurry treatment to the R.C.C. surfaces finished smooth including watering and curing, rounding of corners with cost, conveyance, royalties and of all materials and cost of all labour, scaffolding, sundries and T&P. etc. required for the work etc. complete as directed by the Engineer in charge. Ground Floor. 20KL O.H.T. -48.60Sqm

48.6

8568

176.3

... More
12mm thick cement plaster ( Outside ) in cement mortar (1:4) including closed deep chipping with slurry treatment to the R.C.C. surfaces finished smooth including watering and curing, rounding of corners with cost, conveyance, royalties and of all materials and cost of all labour, scaffolding, sundries and T&P. etc. required for the work etc. complete as directed by the Engineer in charge. Ground Floor. Septic Tank & Soakpit - 23.36 Sqm

23.36

4118

176.3

... More
12mm thick cement plaster ( Outside ) in cement mortar (1:4) including closed deep chipping with slurry treatment to the R.C.C. surfaces finished smooth including watering and curing, rounding of corners with cost, conveyance, royalties and of all materials and cost of all labour, scaffolding, sundries and T&P. etc. required for the work etc. complete as directed by the Engineer in charge. Ground Floor. Construction of Water Point Shed -10.00Sqm

10

1763

176.3

... More
Priming one coat with any approved wall primer of approved make and shade to make an even shade after preparing the wall surface smooth by means of sand papering & applying putty wherever necessary in all floors with cost, conveyance, taxes of all materials, cost of all labour, labour cess, T&P scaffolding etc. complete as directed by Engineer-In-Charge. Ground Floor. Gear Shed - 367.39 Sqm Total Quantity = 367.39 Sqm

367.39

24211

65.9

... More
Priming one coat with any approved wall primer of approved make and shade to make an even shade after preparing the wall surface smooth by means of sand papering & applying putty wherever necessary in all floors with cost, conveyance, taxes of all materials, cost of all labour, labour cess, T&P scaffolding etc. complete as directed by Engineer-In-Charge. First Floor Gear Shed - 367.39 Sqm Total Quantity = 367.39 Sqm

367.39

24798

67.5

... More
Priming one coat with any approved wall primer of approved make and shade to make an even shade after preparing the wall surface smooth by means of sand papering & applying putty wherever necessary in all floors with cost, conveyance, taxes of all materials, cost of all labour, labour cess, T&P scaffolding etc. complete as directed by Engineer-In-Charge. Second Floor Gear Shed - 43.20 Sqm Total Quantity = 43.20 Sqm

43.2

2985

69.1

... More
Cement washing two coats with good quality cement over the new plaster surface of wall in all height after cleaning the surface including cost, conveyance, of all materials, cost of all labour, Scafolding labour cess, T&P etc. required for the work complete as directed by the Engineer- in-Charge. Ground Floor Gear Shed - 839.06 Total Quantity = 839.06 Sqm

839.06

19046

22.7

... More
Cement washing two coats with good quality cement over the new plaster surface of wall in all height after cleaning the surface including cost, conveyance, of all materials, cost of all labour, Scafolding labour cess, T&P etc. required for the work complete as directed by the Engineer- in-Charge. First Floor Gear Shed - 839.06 Total Quantity = 839.06 Sqm

839.06

19382

23.1

... More
Cement washing two coats with good quality cement over the new plaster surface of wall in all height after cleaning the surface including cost, conveyance, of all materials, cost of all labour, Scafolding labour cess, T&P etc. required for the work complete as directed by the Engineer- in-Charge. Second Floor Gear Shed - 92.58 Sqm Total Quantity = 92.58 Sqm

92.58

2166

23.4

... More
Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of all materials, labour T&P etc complete as per the direction of the Engineer-in-charge. Ground Floor. 20kl OHT - 107.91 Sqm Total Quantity = 107.91 Sqm

107.91

7553

70

... More
Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of all materials, labour T&P etc complete as per the direction of the Engineer-in-charge. First Floor 20kl OHT - 46.80 Sqm Total Quantity = 46.80 Sqm

46.8

3388

72.4

... More
Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of all materials, labour T&P etc complete as per the direction of the Engineer-in-charge. Second Floor 20kl OHT - 110.88 Sqm Total Quantity = 110.88 Sqm

110.88

8304

74.9

... More
Wall painting two coats with Distemper paint (1st quality) grade of approved make & shade manufactured by reputed manufacturer like NEROLAC/ ASIAN/ BERGER/DULOX or equivalent to make an even finished surface in all heights with all scaffolding and stging charges including cost, conveyance, of all materials cost of all labours, T & P, sundries etc. as required for the work complete. Ground Floor. Gear Shed - 471.67 Sqm Total Quantity = 471.67 Sqm

471.67

35422

75.1

... More
Wall painting two coats with Distemper paint (1st quality) grade of approved make & shade manufactured by reputed manufacturer like NEROLAC/ ASIAN/ BERGER/DULOX or equivalent to make an even finished surface in all heights with all scaffolding and stging charges including cost, conveyance, of all materials cost of all labours, T & P, sundries etc. as required for the work complete. First Floor Gear Shed - 471.67 Sqm Total Quantity = 471.67 Sqm

471.67

36177

76.7

... More
Wall painting two coats with Distemper paint (1st quality) grade of approved make & shade manufactured by reputed manufacturer like NEROLAC/ ASIAN/ BERGER/DULOX or equivalent to make an even finished surface in all heights with all scaffolding and stging charges including cost, conveyance, of all materials cost of all labours, T & P, sundries etc. as required for the work complete. Second Floor Gear Shed - 49.38 Sqm Total Quantity = 49.38 Sqm

49.38

3871

78.4

... More
Wall painting two coats with 100% Acrylic emulsion paint (1st quality) exterior grade of approved make & shade manufactured by reputed manufacturer like NEROLAC/ ASIAN/ BERGER/DULOX or equivalent to make an even finished surface in all heights with all scaffolding and stging charges including cost, conveyance, of all materials cost of all labours, T & P, sundries etc. as required for the work complete. Ground Floor. Gear Shed - 367.39 Sqm

367.39

56210

153

... More
Wall painting two coats with 100% Acrylic emulsion paint (1st quality) exterior grade of approved make & shade manufactured by reputed manufacturer like NEROLAC/ ASIAN/ BERGER/DULOX or equivalent to make an even finished surface in all heights with all scaffolding and stging charges including cost, conveyance, of all materials cost of all labours, T & P, sundries etc. as required for the work complete. Ground Floor. 20KL O.H.T. -107.91Sqm

107.91

16510

153

... More
Wall painting two coats with 100% Acrylic emulsion paint (1st quality) exterior grade of approved make & shade manufactured by reputed manufacturer like NEROLAC/ ASIAN/ BERGER/DULOX or equivalent to make an even finished surface in all heights with all scaffolding and stging charges including cost, conveyance, of all materials cost of all labours, T & P, sundries etc. as required for the work complete. Ground Floor. Construction of C. Toilet -108.11 Sqm

108.11

16540

153

... More
Wall painting two coats with 100% Acrylic emulsion paint (1st quality) exterior grade of approved make & shade manufactured by reputed manufacturer like NEROLAC/ ASIAN/ BERGER/DULOX or equivalent to make an even finished surface in all heights with all scaffolding and stging charges including cost, conveyance, of all materials cost of all labours, T & P, sundries etc. as required for the work complete. First Floor. Gear Shed -367.39Sqm

367.39

56798

154.6

... More
Wall painting two coats with 100% Acrylic emulsion paint (1st quality) exterior grade of approved make & shade manufactured by reputed manufacturer like NEROLAC/ ASIAN/ BERGER/DULOX or equivalent to make an even finished surface in all heights with all scaffolding and stging charges including cost, conveyance, of all materials cost of all labours, T & P, sundries etc. as required for the work complete. First Floor. 20KL O.H.T. -46.80Sqm

46.8

7235

154.6

... More
2nd Floor. Gear Shed -43.20Sqm

43.2

6890

159.5

... More
2nd Floor. 20KL O.H.T. -110.88Sqm

110.88

17685

159.5

... More
Finishing walls with water proofing cement paint of approved shade on old work one coat to give and even shade including cost, conveyance, of all materials, cost of all labour, labour cess, T&P etc. required for the work complete as directed by the Engineer- in-Charge. Ground Floor. Construction of C. Toilet -104.92 Sqm Total Quantity =104.92 Sqm

104.92

4123

39.3

... More
Fixing Granite Tiles (above 0.1 Sqm. Up to 0.4 sqm 10mm thick.) in floors, treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand ) jointed with neat cemnet slurry mixed with pigmnet to match the shades on the tiles etc complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor. Gear Shed - 176.95 Sqm

176.95

352926

1994.5

... More
Fixing Granite Tiles (above 0.1 Sqm. Up to 0.4 sqm 10mm thick.) in floors, treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand ) jointed with neat cemnet slurry mixed with pigmnet to match the shades on the tiles etc complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor. Renovation of A. Hall , C. Wall , Pavement & New paved area 452.25 Sqm

452.25

902012

1994.5

... More
Fixing Granite Tiles (above 0.1 Sqm. Up to 0.4 sqm 10mm thick.) in floors, treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand ) jointed with neat cemnet slurry mixed with pigmnet to match the shades on the tiles etc complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. First Floor. Gear Shed - 176.95 Sqm Total Quantity = 176.95 Sqm

176.95

373222

2109.2

... More
Fixing Granite Tiles of size Up to 0.10 Sqm. (10mm thick) in Dados Skirting & Risers of Steps of 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor. Gear Shed - 29.18 Sqm Total Quantity = 29.18 Sqm

29.18

53659

1838.9

... More
Fixing Granite Tiles of size Up to 0.10 Sqm. (10mm thick) in Dados Skirting & Risers of Steps of 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. First Floor. Gear Shed - 29.18 Sqm Total Quantity = 29.18 Sqm

29.18

56746

1944.7

... More
Fixing Glazed Tiles of size above 20cm. X 30 cm. having thickness of 6.5 mm to 6.7 mm in Dados Skirting & Risers of Steps of 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor. Renovation of A.Hall, Compound wall, Pavement & New paved area -136.80 Sqm

136.8

128167

936.9

... More
Fixing Glazed Tiles of size above 20cm. X 30 cm. having thickness of 6.5 mm to 6.7 mm in Dados Skirting & Risers of Steps of 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor. Construction of C. Toilet -125.66 Sqm

125.66

117730

936.9

... More
Fixing Chequered tiles in floors treads or steps and landing on 25mm thick cement mortar (1:1) (1 cement : 1 Course sand) and filling joints with of approved quality including rubbing & polishing complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor. Construction of C. Toilet -30.55 Sqm Total Quantity = 30.55 Sqm

30.55

29654

970.7

... More
Fixing Floor Tiles of size Up to 0.10 Sqm. (10mm thick) in Dados Skirting & Risers of Steps of 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles complete including cost, conveyance and other charges etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor. Construction of C. Toilet -1.26 Sqm Total Quantity = 1.26 Sqm

1.26

1124

892.4

... More
Fabrication and erection of G.I gate having 40mm dia G.I frame and 25mm dia G.I pipe vertical fabricated with 18gauge C.R sheet on bottom embeded with iron clamp on concrete pillar tower bolt and iron strap to be fixed on Main gate including cost conveyance etc applicable as per spcification and direction of engineer in charge. Gear Shed - 12.00 Sqm Total Quantity = 12.00 Sqm

12

47592

3966

... More
Supplying, fitting and fixing of M.S. grill in windows including screws and cost of all and complete finished in all respect including cost, conveyance, royalty, taxes of all materials, labor, labour cess, T&P etc. required for the work etc complete as per the direction of the Engineer-in-charge. C. Toilet - 20.51 Sqm Total Quantity = 20.51 Sqm

20.51

30656

1494.7

... More
Painting two coats of any approved Enamel Paint over one coat of any approved primer on new work including cost , conveyance, of all materials, labours, T & P, etc. as required for the work complete as per the direction of the Engineer-in-charge. Gear Shed - 231.75 Sqm

231.75

50034

215.9

... More
Painting two coats of any approved Enamel Paint over one coat of any approved primer on new work including cost , conveyance, of all materials, labours, T & P, etc. as required for the work complete as per the direction of the Engineer-in-charge. Construction of C. Toilet -10.25 Sqm

10.25

2212

215.9

... More
Supplying, fitting, fixing of RCC Jali 25mm thick of required size in the specified place with fixing and making good to the damages including cost of materials all labour scafolding etc. complete as per direction of Engineer-in-charge. Gear Shed - 1.89 Sqm Total Quantity = 1.89 Sqm

1.89

4976

2632.88

... More
Supplying, fitting, fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thik circular pipe with Balustrade of size 32mm x 32mm x x2mm @ 0.90mtr C/C and stainless square pipe bracing of size 32mm x 32mm x x2mm in 3 rows in stair case as per approved disign and specification, buffing, polishing etc including watering, curing ,scafolding with cost, conveyance, of all materials, cost of all labour, labour cess, T&P etc required for the work complete in all respect as directed by Engineer-In-Charge. Gear Shed - 12.00 Rmt

12

54998

4583.2

... More
Supplying, fitting, fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thik circular pipe with Balustrade of size 32mm x 32mm x x2mm @ 0.90mtr C/C and stainless square pipe bracing of size 32mm x 32mm x x2mm in 3 rows in stair case as per approved disign and specification, buffing, polishing etc including watering, curing ,scafolding with cost, conveyance, of all materials, cost of all labour, labour cess, T&P etc required for the work complete in all respect as directed by Engineer-In-Charge. 20kl OHT - 25.00Rmt

25

114580

4583.2

... More
Fabrication and erection of stainless steel staircase made out of 304 grade steel with 50mm dia/35mm dia/20mmdia hollow steel pipe and flat of size 25mm x 5mm including (50x25)mm rectangular hollow pipe with cost conveyance, fabrication and erection, labour and labour cess etc. applicable as per specification and direction of engineer in charge. 20kl OHT - 14.00Rmt Total Quantity = 14.00 Rmt

14

179373

12812.4

... More
Providing Fitting Fixing of plain wood finish door TATA PRAVESH make conform to IS 4020, IS 36141, BS 4761 having 46mm thick shutter infill-honeycomb with frame profile of size (100x58) mm infill-puff alongwith standard acessories like 3nos of hinges, 1no Door lock, 2 no Tower bolt, 1no Door stopper, 1no Peep hole including cost, conveyance, taxes of all materials etc. complete as directed by the Engineering-in-charge. Gear Shed - 2.52 Sqm

2.52

27752

11012.7

... More
Providing Fitting Fixing of plain wood finish door TATA PRAVESH make conform to IS 4020, IS 36141, BS 4761 having 46mm thick shutter infill-honeycomb with frame profile of size (100x58) mm infill-puff alongwith standard acessories like 3nos of hinges, 1no Door lock, 2 no Tower bolt, 1no Door stopper, 1no Peep hole including cost, conveyance, taxes of all materials etc. complete as directed by the Engineering-in-charge. Renovation of A.Hall, Compound wall, Pavement & New paved arae -8.82 Sqm

8.82

97132

11012.7

... More
Providing Fitting Fixing of plain wood finish door TATA PRAVESH make conform to IS 4020, IS 36141, BS 4761 having 46mm thick shutter infill-honeycomb with frame profile of size (100x58) mm infill-puff alongwith standard acessories like 3nos of hinges, 1no Door lock, 2 no Tower bolt, 1no Door stopper, 1no Peep hole including cost, conveyance, taxes of all materials etc. complete as directed by the Engineering-in-charge. Construction of C. Toilet -7.56 Sqm

7.56

83256

11012.7

... More
Supplying, fitting, fixing of factory made single leaf rigid F.R.P composite door shutter of 32mm thick, laminated with to G.R.P skins with wood grain finished, fabricated using UV stabilized Isopthalic gal coat and one layer of 450 gsm E-glass chopped strand Mat (CSM) impregnated with orthopathalic, polyster resin including fitting of all fixtures like hinges, tower bolt, handle, aldrop etc. with cost, conveyance and taxes of all materials and labour etc. complete. Construction of C. Toilet -9.45 Sqm Total Quantity = 9.45 Sqm

9.45

32982

3490.2

... More
Fabricating fitting and fixing of UPVC Two track two pannels sliding window frame 65x50mm & Sash 45x60mm of Finesta//Wintech and equivalent make including cost conveyance of all materials etc complete in all respect as per spcification and direction of engineer in charge. Renovation of A.Hall, Compound wall, Pavement& New paved area -4.75 Sqm Total Quantity = 4.75 Sqm

4.75

42645

8978

... More
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead.including cost conveyance of all materials etc complete in all respect as per spcification and direction of engineer in charge. Renovation of A.Hall, Compound wall, Pavement& New paved area -44.93 Sqm

44.93

28804

641.1

... More
Removing old lime or cemet plaster from walls including raking out joints 12mm deep and removing the debris within 50m lead and complete in all respect as per specification and direction of Engineer-in-charge. Renovation of Jetty -72.36Sqm Total Quantity = 72.36Sqm

72.36

3118

43.1

... More
Providing,supplying ,fitting fixing of marine fender of size 200m x200m 500m long in the wharf of FLCs/FHs including grouting with grout material drilling holes , fixing with G.I bolt, washer and placeing in position including cost of all labour ,drilling and hire charges of boat etc. complete as per the requirement and direction of engineer in charge . Renovation of Jetty - 62.00 No Total Quantity = 62.00 No

62

294345

4747.5

... More
Providing & fixing 25mm thick Bitumenous expansion joint board (I.S.I) in expansion joint complete as per drawaing & Technical Specification including cost conveyance & other charges complete in all respect as per specification direction of engineer in charge. Renovation of A. Hall , Compund Wall, Pavement & New paved area -798.00 Rmt

798

188407

236.1

... More
Providing & fixing 25mm thick Bitumenous expansion joint board (I.S.I) in expansion joint complete as per drawaing & Technical Specification including cost conveyance & other charges complete in all respect as per specification direction of engineer in charge. Renovation of Jetty -217.60 Rmt

217.6

51375

236.1

... More
Fabrication and erection of Water point shed 3 mtr height made with 75mm, 50mm, 40mm dia G.I hollow pipe fabricated with 0.4mm thick Profile sheet on roof drilling hole in wind ties including cost conveyance etc applicable as per spcification and direction of engineer in charge Water Point Shed - 1.00 No Total Quantity = 1.00 No

1

53951

53951.2

... More
Supplying, fitting and fixing of 40 watt (2 nos)solar all in one street light 12.8 V40 AH lIFE PO4 a battery,100w poly crystalyn sola pannel,copper wire inbuilt (Philips/Amrut/Sun world) or equivalent make having 7m octagonal GI Pole to be fitted on base plate at (400 x400 x 6)mm with RCC Saddle , including cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect as per specification & direction of engineer in charge.

4

303080

75770

... More
Providing supplying fitting and fixing of 1 HP single Phase Open submergable pump set of KSB/ kirlosker/ crompton/texmo and other IS make with control pannel including with all labour, T&P, taxes as applicable at site as per specification and direction of engineer in charge. 20KL OHT

1

25436

25436.9

... More
Supplying all materials, labour and T&P for construction of 1.20mtr.dia.x2.55mtr. Deep soak-way pit with dry brick walling up to 2.10mtr. height and bbrick work with cement mortar (1:6) for 0.45mtr. height of wall at top,cement plaster (1:3) inside and outside,inside filled with dry brick khoa of 50mm.to 100mm.size to a height of 2.00mtr.from bottom, covered by means of 40mm.thick R.C.C. perforated slab,50mm.thick R.C.C.well cover in pieces fitted with iron rings including earth work in excavation and refilling of cavity around the pit etc. all complete as per approved design and drawing. (per each ) Septic Tank & Soak Pit

1

21180

21180.9

... More
Supplying, fitting and fixing of PVC coated Ring Ladder , including cost, conveyance, of all materials, labour, T&P etc. required for the complete in all respect as per specification & direction of engineer in charge. Septic Tank & Soakpit - 6.00 No Total Quantity = 6.00 No

6

1800

300

... More
Supplying, fitting and fixing of ( C.I) Man hole Cover(0.60 x 0.60), including cost, conveyance, of all materials, labour, T&P etc. required for the complete in all respect as per specification & direction of engineer in charge. Septic Tank & Soakpit - 1.00 No Total Quantity = 1.00 No

1

5000

5000

... More
Supplying, fitting and fixing of Louvered Ventilator , including cost, conveyance, of all materials, labour, T&P etc. required for the complete in all respect as per specification & direction of engineer in charge. C. Toilet - 2.16 Sqm Total Quantity = 2.16 Sqm

2.16

11880

5500

... More
Labour for drilling a perfectly vertical bore hole of a specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc. for lowering of 200mm dia PVC/GI pipes for housing, fitted with socket and with or without well screen as per the necessity for the soft, medium, hard and boulder formation (GI/PVC casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering & withdrawing after completion of the tube well). 00 Mtr to 30 Mtr

30

31800

1060

... More
31 Mtr to 60 Mtr

30

34350

1145

... More
61 Mtr to 90 Mtr

30

38100

1270

... More
91 Mtr to 270 Mtr

180

243900

1355

... More
Lowering the following size G.I/PVC Pipes with or without slotted pipes as per the necessity from ground level and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and fixing all jointing materials, tools and plant etc complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials form above. 200mm dia pipe

270

754455

2794.28

... More
200mm PVC Cone

1

1010

1010

... More
200mm PVC End Cape

1

760

760

... More
200mm PVC threaded nipple

1

705

705

... More
Supplying of bentonite Powder (Drilling Mud) Type -II high grade ,etc all complete as per direction of Engineer-in-cahrge. Excluding the cost of Cement.

97

37209

383.6

... More
Providing supplying fitting and fixing of 1 HP single Phase oilfiltered 100mm dia borewell submergable pump set of KSB/ kirlosker/ crompton/texmo and other IS make with control pannel including 2.5sqmm three core PVC coated copper flat cable, 32mm dia HDPE pipe / nipple / bolt and PVC coated 6mm wire rope , U bolt , M.S clamp with all labour, T&P, taxes as applicable at site as per specification and direction of engineer in charge.

1

72115

72115.3

... More
Cost of graded and washed B grade gravel size (2.75mm to 3.55mm) suitable for use as packing materials of available approved rate of O.L.I.C Cuttack Circle & transportation cost as per actual on the current OPWD Schedule of rates & unit cost Royality @ Rs.180.00 per cum is provided.

30

89490

2983

... More
Cost of Labour Charges for slotting of 200mm dia PVC (ASTM-D)Sch-80 pipe

48

20400

425

... More
Lowering of 200mm dia ASTM Schedule -80 PVC casing and sloted pipe cone ,nipple etc as per the necessity and fitted and fixed of in perfectly vertical position and capeing the top of the casing pipe threaded 1meter ,above the ground level ,including pluging the tube well to prevent entry of foreign materials .

270

22950

85

... More
Cleaning and devlopeing the tube well using their own compressor having 250/300CFM at 10.5 kg /sq cm continously worked till cleared and adequate discharge is obtained from the well including supply and use of all necessary equipment and labour as per the direction of engineer in charge.

10

12250

1225

... More
Earthwork in excavation of Mud pit ,settling pits ,Mud flow channel and V-notch channel etc and refilling these earthwork (Two Pits). 46.61 Cum

46.61

10394

223

... More
Suppplying and fixing Rolling shutters of approved make, made of required size G.I laths interlocked together through their entire length and jointed together at the end by end locks mounted on specially designed pipe shaft with brackets, side guides ad arrangements for inside and outside locking with push and pull operation complete including the cost of providing and fixing necessary 27.5cm long wire springs grade No.2 and G.I. top cover of required thickness for rolling shutters. Gear Shed - 109.20 Sqm Total Quantity = 109.20 Sqm

109.2

410000

3754.58

... More
Providing & making Gabion(1x1x1.=1.0cum) structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes(10% aluminium & 90% Zinc coated) of required size, Mesh Type (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 4.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. Renovation of A.Hall, Compound wall, Pavement& New paved area - 180.00 Total Quantity = 180.00Cum

180

624780

3471

... More
Supplying all materials,labour and T&P for laying in trenches unplasticized PVC pipes and specials of the following outside dia. for all classes including jointing with approved solvent cement by non-heat application method including testing as per specification and direction of Engineer-in-charge etc. all complete. [including earth work and cost of pipes] 110 mm Size UPVC Pipe

80

134768

1684.6

... More
Supplying all materials,labour and T&P for laying in trenches unplasticized PVC pipes and specials of the following outside dia. for all classes including jointing with approved solvent cement by non-heat application method including testing as per specification and direction of Engineer-in-charge etc. all complete. [including earth work and cost of pipes] 25 mm Size UPVC Pipe

50

42655

853.1

... More
Supplying all materials, labour and T&P and fixing to walls,ceiling and floor unplasticized PVC pipes 6kg pressure,the following nominal diameter with fittings and clamps including testing as per specification all complete. 20 mm Size UPVC Pipe

40

6840

171

... More
Supplying all materials, labour and T&P and fixing to walls,ceiling and floor unplasticized PVC pipes 6kg pressure,the following nominal diameter with fittings and clamps including testing as per specification all complete. 25 mm Size UPVC Pipe

28

6294

224.8

... More
Supplying all labour and T&P for fixing Brass ball valve of the following size as per specification all complete including cost of brass ball valve. 25mm ball valve

2

2691

1345.8

... More
Providing and fixing on wall face unplasticised Rigid PVC soil, waste and Rain water pipe conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion, (i) single socketed pipes Total Quantity = 19.00Rmt

19

18745

986.6

... More
Fixing of Brass Screw Down Stop Cocks conferming to IS-781-1995 of the following nominal sizes as per specification complete. 15mm Angular Stop cock Water Supply - 8.00 Nos Total Quantity = 8.00 Nos

8

7370

921.3

... More
Supplying all labour and T&P for fixing Brass Bib cock / Push cock /Piller cock of the following size as per specification all complete 15mm Long Body Bib Cock Water Supply - 6.00 Nos Total Quantity = 6.00 Nos

6

5873

978.9

... More
Supplying all labour and T&P for fixing Brass Bib cock / Push cock /Piller cock of the following size as per specification all complete Short Body Bib Cock Water Supply - 6.00 Nos Total Quantity = 6.00 Nos

6

5428

904.8

... More
Supplying all labour and T&P for fixing Brass Bib cock / Push cock /Piller cock of the following size as per specification all complete 15mm CP Pillar Cock Water Supply - 4.00 Nos Total Quantity = 4.00 Nos

4

3666

916.7

... More
Supplying all materials,labour and T&P for fixing 10.00 ltr capacity low level Flushing cistern with manually controlled device (handle lever) conferming to IS : 7231, with all fittings and fixtures complete. Water Supply - 6.00 Nos Total Quantity = 6.00 Nos

6

11496

1916

... More
Supplying all materials,labour and T&P for fixing wash hand basin with hole for pillar cock with cast iron /M.S. brackets painted white including cutting holes in walls and making good to the damages etc. all complete as per specification.[3.3.12./344] (including cost of wash hand basin and all accessories. ) Water Supply - 2.00 Nos Total Quantity = 2.00 Nos

2

4230

2115.4

... More
Fixing Cromium plated brass soap dish complete with cromium plated brass brackets fixed to wooden plugs with cromium plated brass screws as per specification. Water Supply - 6.00 Nos Total Quantity = 6.00 Nos

6

2444

407.4

... More
Supplying all materials,labour and T&P for fixing standard size C. P. towel rail fixed to wooden plugs with chromium plated brass screws and washers etc. all complete as per specification.[3.3.27./358](including cost of towel rail ) Water Supply - 6.00 Nos Total Quantity = 6.00 Nos

6

6167

1027.9

... More
Supplying all materials,labour and T&P for fixing standard size Glass self with chromium plated brass brackets and guard rails fixed to wooden plugs with chromium plated brass screws and washers etc. all complete as per specification.[3.3.28./358] Water Supply - 6.00 Nos Total Quantity = 6.00 Nos

6

4350

725

... More
Fixing water closet, squating pan (Indian type W.C.pan) of size (575x410x250)mm conferming to IS 2556: Part 3-2004 duly embeded in cement concrete (1:4:8) using hard granite metal 4cm nominal size all complete as per specification. Water Supply - 6.00 Nos Total Quantity = 6.00 Nos

6

35388

5898

... More
Fixing Cromium plated Waste of following nominal diameter for wash basin and sink as per specification. Water Supply - 6.00 Nos Total Quantity = 6.00 Nos

6

2629

438.2

... More
Fixing PVC Waste Pipe of following nominal diameter for wash basin or sink including brass check nut complete as per specification. Water Supply - 8.00 Nos Total Quantity = 8.00 Nos

8

1082

135.3

... More
Fixing 15mm dia PVC Inlet Connection Pipe of following nominal diameter for wash basin or sink including brass check nut complete as per specification. Water Supply -14.00 Nos Total Quantity = 14.00 Nos

14

1449

103.5

... More
Fixing 5" dia stainless steel Jalli of following nominal diameter for wash basin or sink including brass check nut complete as per specification. Water Supply -8.00 Nos Total Quantity = 8.00 Nos

8

614

76.8

... More
Supplying all materials,labour and T&P for fixing of 600x450 bevelled edge mirror of superior glass mounted on 6mm thick ac sheet or ply wood sheet and fixed to wooden plugs with chromium plated brass screws and washers etc. All complete as per specification [ 3.3.24/357] Water Supply -4.00 Nos Total Quantity = 4.00 Nos

4

3430

857.6

... More
Recessed wiring to light point/Fan point/ Exhaust fan point/Call bell point with 1.5sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metallic PVC flexible conduit with 5A ,25 on MS box having front bakelite cover of suitable size, MS box with 1.5sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accessories and connection (Make of wire-Finolex/L&T/Anchor/Havells/V-Guard/ Great White/HPL) Gear Shed & A. Hall -40.00 Total Quantity = 40.00 No

40

14535

363.39

... More
Recessed extra lead submain wiring alongwith earth wire with the following sizes of PVC insulated single core multistrand copper conductor ISI marked conforming to IS-694/1990 in 20mm dia non metallic heavy duty flexible conduit 1.6 mm in recessed PVC conduit as required (make of wire -Finolex/ L&T/ Anchor/Havells/V-Guard /Great White/HPL) exceeding to Group-C points in 2 X 1.5sqmm +1 x 1.5sqmm. Gear Shed -150.00 Total Quantity = 150 Rmt

150

14598

97.32

... More
Recessed wiring to 5A /6Amp socket outlet with 2 X 1.5sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked in recess 20mm dia non metallic PVC flexible conduit with piano type switch, Phenolic laminated sheet suitable size ISI marked MS box and earthing point with 1 X 1.5sq.mm FR PVC insulated single core multistrand copper conductor for loop earthing etc. as required (Make of wire -Finolex/ L&T/ Anchor/ Havells/V-Guard/Great White/HPL) Separate Gear Shed & A. Hall -12.00 Total Quantity = 12.00 No

12

4457

371.42

... More
Supply and fixing of 5Amp plug with switch on existing board (Piano type ) Gear Shed & A. Hall -12.00 Total Quantity = 12.00 No

12

803

66.96

... More
Supply and fixing of metal box of 100mm X 100mm X 60mm deep (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing of 6pin 5/6 & 5/6Amp socket outlet and 5/6 Amp piano type switches connection painting etc. as required. (make-Anchor/ Cona/Great white/HPL) Gear Shed & A. Hall 12.00 Total Quantity = 12.00 No

12

1832

152.67

... More
Supply and fixing of metal box of 180mm X 100mm X 60mm deep (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing of 6pin 5/6 & 15/16Amp socket outlet and 15/16Amp piano type switches connection painting etc. as required. (make-Anchor/ Cona/Great white/HPL) Gear Shed A. Hall -12.00 Total Quantity = 12.00 No

12

2796

233.04

... More
Recessed submain wiring alongwith earth wire with the following sizes of PVC insulated single core multistrand copper conductor ISI marked conforming to IS-694/1990 in 20mm dia non metallic heavy duty flexible conduit 1.6 mm in recessed PVC conduit as required (make of wire -Finolex/L&T/Anchor/Havells/V-Guard/Great White/Mescab/HPL) 2 X 2.5sq.mm +1 X 1.5sqmm Gear Shed & A. Hall -220.00 Total Quantity = 220.00 Rmt

220

24750

112.5

... More
Recessed submain wiring alongwith earth wire with the following sizes of PVC insulated single core multistrand copper conductor ISI marked conforming to IS-694/1990 in 20mm dia non metallic heavy duty flexible conduit 1.6 mm in recessed PVC conduit as required (make of wire -Finolex/L&T/Anchor/Havells/V-Guard/Great White/Mescab/HPL) 2 X 4sq.mm +1 X 1.5sqmm. Gear Shed -220.00 Total Quantity = 220.00 Rmt

220

29070

132.14

... More
Recessed submain wiring alongwith earth wire with the following sizes of PVC insulated single core multistrand copper conductor ISI marked conforming to IS-694/1990 in 20mm dia non metallic heavy duty flexible conduit 1.6 mm in recessed PVC conduit as required (make of wire -Finolex/L&T/Anchor/Havells/V-Guard/Great White/Mescab/HPL) 2 X 6sq.mm +1 X 2.5sqmm. Gear Shed & A. Hall -40.00 Total Quantity = 40 Rmt

40

6714

167.86

... More
Recessed submain wiring alongwith earth wire with the following sizes of PVC insulated single core multistrand copper conductor ISI marked conforming to IS-694/1990 in 20mm dia non metallic heavy duty flexible conduit 1.6 mm in recessed PVC conduit as required (make of wire -Finolex/L&T/Anchor/Havells/V-Guard/Great White/Mescab/HPL) 2 X 10sq.mm + 1 X 4sqmm. Gear Shed & A. Hall -40.00 Total Quantity = 40 Rmt

40

9571

239.28

... More
Supply and fixing Earthing with G.I earth pipe 3mtr. Long 40mm dia ISI marked including accessories and providing masonary enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal and salt as required. Standard earthing as per Govt. spcn. Gear Shed & A. Hall -2.00 Total Quantity = 2.00 No

2

4212

2106.25

... More
Supply and fixing of copper plate earthing( 600 X 600 X 3.15mm )with running copper flat 25 X 5mm from copper plate to funnel of 40mm dia G.I pipe including all accessories Gear Shed & A. Hall -2.00 Total Quantity = 2.00 No

2

22089

11044.64

... More
S/F of Chemical earthing size of chemical earth bar 2 mtr, size of earth feet 3'X2"X9', chemical compound to be used 50 K.g Gear Shed & A. Hall -2.00 Total Quantity = 2.00 No

2

35875

17937.5

... More
Extra copper flat 25 X 6mm Gear Shed & A. Hall -3.00 Total Quantity = 3.00 No

3

1526

508.92

... More
Supply and fixing of following way single pole and neutral sheet steel MCB distribution board 250V on surface/recess complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnections, phosphatized and powder painted including earthing etc. as required (but with out MCB/ RCCB/ Isolator) make-HPL/ Havells/ Legrand /L&T/C&S.) 8way, Double door Gear Shed & A. Hall -4.00 Total Quantity = 4.00 No

4

7060

1765.17

... More
Supply and fixing of 5Amp to 32A rating 240V "B" series MCB suitable for lighting and other loads of the following poles in the exiting MCB DB ISI marked complete with connections testing and commissioning etc. (make-HPL/ Havells/ Legrand /L&T/C&S) Single pole (SP) Gear Shed & A. Hall -24.00 Total Quantity = 24.00 No

24

3064

127.67

... More
Supply and fixing of 5Amp to 32A rating 240V "B" series MCB suitable for lighting and other loads of the following poles in the exiting MCB DB ISI marked complete with connections testing and commissioning etc. (make-HPL/ Havells/ Legrand /L&T/C&S) Single pole and Neutral (SP&N) Gear Shed & A. Hall -24.00 Total Quantity = 24 No

24

8635

359.82

... More
Supply and fixing of porcelain base kit kat (Anchor/Havells) 320/400Amp kit kat Gear Shed g& A. Hall -2.00 Total Quantity = 2.00 No

2

3648

1824.1

... More
Supply ,installation, testing and commissioning of main switches (IS 13940 part-3/1993 ) of following capacity on existing surface/wall mounting and completer with HRC fuse links, interconnections, earthing (Make-Seimens/ HPL/ Anchor/ L&T/Havells/C&S/RK) 250/315Amp ICTPN main switch on MS angle frame Gear Shed & A. Hall -2.00 Total Quantity = 2.00 No

2

25742

12871.42

... More
Supply ,installation, testing and commissioning of main switches (IS 13940 part-3/1993 ) of following capacity on existing surface/wall mounting and completer with HRC fuse links, interconnections, earthing (Make-Seimens/ HPL/ Anchor/ L&T/Havells/C&S/RK) 400Amp TPN bus bar -400 X 50 X 6mm size Gear Shed & A. Hall -2.00 Total Quantity = 2.00 No

2

11428

5714.28

... More
Supply and fixing of different type of fitting with lamp 1' X 28watt T-5 fitting( Make-Bajaj/ Philips /Crompton) Gear Shed & A. Hall -12.00 Total Quantity = 12.00 No

12

9021

751.78

... More
Recessed fitting - 1 ' X 1' size 2 x 11watt CFL/PL-S fitting including lamp( Make-Bajaj/ Philips / Crompton/HPL) Gear Shed & A. Hall -12.00 Total Quantity = 12.00 No

12

23614

1967.85

... More
Gate/ Lawn light fitting with 1 X 18watt CFL lamp 16" size dia Make-Bajaj/ Philips / Crompton/ PAC/ OASIS/HPL) Gear Shed & A. Hall -4.00 Total Quantity = 4.00No

4

11800

2950

... More
Supply and fixing of changeover switch (Anchor/ Havells/ Apex) 250amp four pole (3pole neutral) Gear Shed & A. Hall -2.00 Total Quantity = 2.00 No

2

26658

13329.46

... More
S/F of 48" Ceiling fan Alluminium Body, Copper winding, High speed ceiling fan (Make-Crompton model-Jura, PolyCab (Model Vital, Polar Model Winpro) etc. Gear Shed & A. Hall -12.00 Total Quantity = 12.00 No

12

28939

2411.6

... More
Trenching with sand spreading and bricks laying and laying of cable in trench in 2 1/2' depth .pvc cable axceeding 35sqmm to 120sqmm Gear Shed & A. Hall -480.00 Total Quantity = 480 No

480

47568

99.1

... More
Supply and fixing of piano type switch ISI marked on existing board/cover and connection as required.(Anchor/Cona/Havels, Great White) 5Amp socket Gear Shed -12.00 Total Quantity = 12.00 No

12

321

26.78

... More
5Amp switch Gear Shed & A. Hall -12.00 Total Quantity = 12.00 No

12

471

39.28

... More
15Amp switch Gear Shed & A. Hall -12.00 Total Quantity = 12.00 No

12

867

72.32

... More
15Amp socket Gear Shed & A. Hall -12.00 No Total Quantity = 12.00 No

12

846

70.53

... More
Fixing charges of F.L fitting with all connections Gear Shed & A. Hall -24.00 Nos Total Quantity =24.00 Nos

24

1607

66.96

... More
Fixing charges of ceiling fan with all connections Gear Shed & A. Hall -12.00 Nos Total Quantity = 12.00 Nos

12

1285

107.14

... More
16/18 SWG pannel box 36 X 24X 5= sq. inch for single door made out of CR sheet of 16SWG and boarder angle frame to provide above pannel with proper space ,hinges, and other accessories , hinged door must be painted one coated red oxide and two coat enamel gray paint. Gear Shed & A. Hall -1682.00 Sqinch Total Quantity = 1682.00 Sqinch

1682

2253

1.34

... More
Supply and fixing of internal wiring to equipment installed in the pannel board with required size of copper multistrand single core cables duly crimped with copper lugs and all connections 36 X 24 including cost of copper conductor and other fittings like gasket ,screw , nut and bolt , insulating materials etc. Gear Shed & A. Hall -1682.00 Sqinch Total Quantity = 1682.00 Sqinch

1682

1295

0.77

... More
S/F of copper bus bar 50 x 8mm with required size of insulating material and nut and bolts Gear Shed & A. Hall -3.00 Rmt Total Quantity = 3.00 Rmt

3

5030

1676.78

... More
S/F of transparent glass for isolation L X B =sq.inch Gear Shed & A. Hall -355.00 Sqinch Total Quantity = 355.00 Sqinch

355

134

0.38

... More
Supply and fixing of Ammeter with selector switch including all connections Gear Shed & A. Hall -2.00Nos Total Quantity = 2.00 Nos

2

2496

1248.21

... More
Supply and fixing of voltmeter with selector switch including all connections Gear Shed & A. Hall -2.00 Nos Total Quantity = 2.00 Nos

2

2496

1248.21

... More
Supply and fixing of Indicator lamp with toggler switch and fuse Gear Shed & A. Hall -6.00 Nos Total Quantity = 6.00 Nos

6

1296

216.07

... More
Supply and fixing of C.T coil upto 400Amp including all connections Gear Shed & A. Hall -6.00 Nos Total Quantity = 6.00 Nos

6

4607

767.85

... More
Supply and fixing of Fire extinguisher (5 kg each ) Gear Shed & A. Hall -2.00Nos Total Quantity =2.00 Nos

2

10714

5357.14

... More
Supply and fixing of 16/18SWG metal box of following size (nominal size) on surface/Recess with suitable size of phenolic laminated sheet cover in front including cutting the wall and making good the same in cases of recessed conduit as required Gear Shed & A. Hall - 28.00 Nos Total Quantity = 28.00 No

28

3174

113.39



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.