Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Department Of Agriculture Tender

Building Construction
Eprocure
Opening Date2 May 2018
Closing Date15 May 2018
Tender Amount₹ 46,03,557 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
First Floor

36.97

31874

862.18

... More
First Floor

775.12

31198

40.25

... More
Fixing Granite tiles of size above 0.4 Sqm. (20mm. thick) in floors,treads or steps and landings on 25 mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades includind cost for rubbing, polishing & cost of marbel tiles etc. complete as per direction of Engg-in-Charge .

-

-

-

... More
SecondFloor

111.95

1973

17.63

... More
First Floor

14.04

16430

1170.24

... More
Ground

10.4

7690

739.48

... More
First Floor

411.37

57875

140.69

... More
12mm cement plaster in cement mortar (1:6)including necessary scaffolding curing etc. as per direction of Engg.-in-Charge.

-

-

-

... More
First Floor

7.47

46152

6178.41

... More
First Floor

11.61

20076

1729.2

... More
Ground

8.96

1474

164.59

... More
First Floor

151.36

35914

237.28

... More
First Floor

7.99

1371

171.7

... More
First Floor

11.36

8554

753.04

... More
Staircase

-

-

-

... More
Fixing of Ceramic Glazed Tile in dados, on12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles etc. complete as per direction of Engg.-in-Charge.

-

-

-

... More
Fixing Vitrified tiles in dados skirting and risers of stepson 12 mm thick cement plaster(1:3) jointed with neat cement slurry mixed with pigments to matched shade of the tiles including rubbing and polishing complete as per direction of Engineer-in-charge.

-

-

-

... More
SecondFloor

62

3887

62.7

... More
Foundation excavation in hard soil including leveling and dressing the bed and sides depositing muck within initial lead and lift etc. complete. as per direction of Engg.-in-Charge.

136.78

17501

127.95

... More
First Floor

17.65

122084

6916.99

... More
Ground

3.96

31789

8027.59

... More
First Floor

39.3

26764

681.04

... More
Ground

14.04

16156

1150.76

... More
Ground Floor

62.18

224481

3610.19

... More
Supplying,fitting & fixing Vitrified tiles in floors of size 600mm x600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement ofapproved quality including cost of all work all materials,taxes, labour, T&P ,etc. complete as per direction of Engineer-in-charge.

-

-

-

... More
Wall Priming one coats on new work with wall water bound primer of approved shade .as per direction of Engg.-in-Charge.

-

-

-

... More
First Floor

3.96

35440

8949.55

... More
First Floor

235.72

12457

52.85

... More
Fixing granite tiles of 0.10 Sqm. & upto 0.4 Sqm. (10mm. thick) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shades includind cost for rubbing, poloshing complete excluding cost of tiles etc. complete as per direction of Engg-in-Charge .

-

-

-

... More
Lintel

-

-

-

... More
First Floor

6.78

7160

1056.07

... More
Ground

11.19

69136

6178.41

... More
SecondFloor

20.9

2365

113.19

... More
Fly Ash Brick masonry in c.m. 1:6 in F & P including cost,conveyance and royalty of materials curing etc. complete. as per the direction of the Engineer-in-charge.

17.08

61092

3576.86

... More
Ground

208.13

20119

96.67

... More
Ground

18.76

142075

7573.31

... More
Providing and fitting Steel railing for stair case etc. complete as per direction of Engg.-in-Charge.

-

-

-

... More
First Floor Floor

49.28

315049

6393.44

... More
65mm avg. Chajja

-

-

-

... More
Ground

11.61

27389

2359.13

... More
First Floor

64.49

243986

3783.33

... More
SecondFloor

3.36

580

172.63

... More
SecondFloor

143.75

15490

107.76

... More
First Floor

154.97

17142

110.62

... More
First Floor

11.1

118819

10704.45

... More
SecondFloor

5.32

4636

871.45

... More
SecondFloor

12.87

51254

3982.45

... More
Ist class Fly Ash brick masonry work in superstructure thoroughly soaked in water, with cement mortar (1:6) including scaffoldings ,racking out joints, curing etc complete as per specification/drawing and as per the direction of the Engineer-in-charge.

-

-

-

... More
First Floor

118.6

102594

865.05

... More
SecondFloor

111.95

4603

41.12

... More
First Floor

539.39

31063

57.59

... More
SecondFloor

169.29

24372

143.97

... More
Supplying, fitting and placing uncoated HYSD bar reinforcement complete in proper position including cost of binding wire 18 to 20 gauge as per direction of Engg.-in-Charge.

-

-

-

... More
Ground

37.72

24185

641.19

... More
Column Base

-

-

-

... More
First Floor

13.93

33051

2372.7

... More
Ground

15.6

107905

6916.99

... More
First Floor Floor

208.78

20625

98.79

... More
Ground

3.25

27655

8509.52

... More
SecondFloor

10.87

41850

3850.12

... More
Fixing and fixing industrial chequred tiles in dados skirting and risers of stepson 12 mm thick cement plaster(1:3) jointed with neat cement slurry mixed with pigments to matched shade of the tiles including rubbing and polishing complete as per direction of Engineer-in-charge.

-

-

-

... More
Ground

521.63

29592

56.73

... More
SecondFloor

29.22

7543

258.15

... More
Wall painting two coats with Plastic emulsion paint of approved shade as per direction of Engg-in-Charge

-

-

-

... More
First Floor

539.39

33274

61.69

... More
Cement concrete (1:3:6)with 40mm size CBHG metal including cost, conveyance and royalty etc. complete as per direction of Engg.-in-Charge.

26.72

98082

3670.77

... More
Fixing and fixing industrial chequred tiles in floors, treads or steps and landings on 25 mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades including cost for rubbing, polishing & cost of tiles etc complete as per direction of Engg.-in-Charge.

-

-

-

... More
SecondFloor

1.03

1226

1190.7

... More
Ground

39.2

33033

842.7

... More
Providing fitting and fixing of thick Fibredoor shutters of section 32 mm confirming to I.S in position including all fittings and fixtures with hinges and screws required as per the approved design and drawing including all cost, conveyance royalties and taxes of all materials, all labour, all T&P sundries required for the work as per the direction of the Engineer-in-charge.

-

-

-

... More
Ground

4.09

29319

7168.61

... More
Ground

11.68

110426

9454.31

... More
SecondFloor

49.95

5190

103.92

... More
Finishing wall surface of walls with Acrylic wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T & P etc. complete as per direction of Engg-in-Charge .

-

-

-

... More
SecondFloor

0.83

645

777.3

... More
SecondFloor

1.33

16275

12237.53

... More
First Floor

3.25

27655

8509.52

... More
First Floor

14.32

48691

3400.27

... More
SecondFloor

5.7

36514

6409.48

... More
First Floor

20.4

162356

7958.65

... More
Fixing Floor tiles in floors, treads or steps and landings on 25 mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades including cost for rubbing, polishing & cost of tiles etc complete. as per direction of Engg.-in-Charge.

-

-

-

... More
Ground

520

56035

107.76

... More
16mm thick cement plaster in cement mortar (1:6) including necessary scaffolding curing etc. as per direction of Engg.-in-Charge.

-

-

-

... More
1. Providing and Fixing factory made uPVC white colour casement/sliding window/ door, made of extruded profiles. Profiles of frames and sash will be mitered cut and fusion welded at all corners, including drilling of holes for fixing hardware and drainage of water etc., making arrangement for fixing of hardware, EPDM gasket, 1.2 ± 0.2 mm thick galvanised steel profile to be inserted in required profile, frame will be fixed to the wall with 8 mm x 100 mm long fasteners, all complete as per direction of Engineer-in-charge (Glazing, hardware hinges and fitting etc. to be paid separately).Note:- Each member of window to be measured separately with clear length etc. complete as per direction of Engg.-in-Charge.

-

-

-

... More
Supplying and fixing of steel M.S. grill with all fitting and fixtures including cost of cutting holes in the brick masonry and R.C.C. columns and making good to damage etc, as per direction of Engineer -in -charge.

-

-

-

... More
Ground

783.7

30893

39.42

... More
Ground

97.78

623625

6378.17

... More
Painting Two coats with Synthetic Enamel paint over one coat primer to grill etc complete as per direction of Engg.-in-Charge.

-

-

-

... More
First Floor

475

51186

107.76

... More
First Floor

13.28

51129

3850.12

... More
Ground

181.94

19673

108.13

... More
Beam & Column

-

-

-

... More
Providing, fitting, fixing of Al.door with anodized Al.door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member of 12 mm thick prelaminated Nova pan Board fixed in door frame with frame section no 9221 and tapered clip No-4660 and the frame to be completed by means of jointing angle No-1855 including all cost of labour,T&P ,hire charges of drilling machine,labour charges etc. complete as per direction of Engg.-in-Charge.

-

-

-

... More
Cement washing two coats with cost of all labour & materials etc. complete as per direction of Engg.-in-Charge.

-

-

-

... More
First Floor

11.28

10151

899.95

... More
Ground

10.97

37300

3400.27

... More
Wall painting two coats on new work with Weather coat paint of approved shade as per direction of Engg.-in-Charge.

-

-

-

... More
Ground

521.63

31355

60.11

... More
SecondFloor

4.45

30780

6916.99

... More
Ground

262.07

13601

51.9

... More
SecondFloor

178.14

9824

55.15

... More
Ground

783.7

13487

17.21

... More
Ground

13.28

51129

3850.12

... More
Ground

393.63

54124

137.5

... More
Filling foundation and plinth with sand and well watered and rammed including cost, conveyance and royalty etc complete as per direction of Engg.-in-Charge.

177.16

39673

223.94

... More
R.C.C work of (M-20) grade with 20 mm and down graded chips including hoisting and laying etc. complete. as per direction of Engg. -in-Charge.

-

-

-

... More
Ground

43.13

189389

4391.12

... More
First Floor

4.09

32282

7893.03

... More
Ground

10.15

10521

1036.59

... More
Plinth Beam

-

-

-

... More
Ground

11.57

2535

219.13

... More
SecondFloor

3.64

32251

8860.23

... More
6mm.thick cement plaster with C.M(1:4) to RCC surface including closed deep chipping and slury treatment etc. complete as per direction of Engg.-in-Charge.

-

-

-

... More
2.5cm.grading concrete (1:2:2) on roof slab using 6mm.size CBHG chips including cost,conveyance and royalty of materials curing etc.complete as per direction of Engg-in-Charge .

-

-

-

... More
Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium item.s The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places. etc. complete as per direction of Engineer in charge.

-

-

-

... More
Roof Slab

-

-

-

... More
First Floor

775.12

13502

17.42

... More
Ground

41.94

37174

886.38



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.