Department Of Agriculture Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Department Of Agriculture Tender
Civil And Construction
Excavation
Eprocure
Opening Date1 May 2018
Closing Date15 May 2018
Tender Amount₹ 14,08,566
Costs
EMD
₹ 15,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_AGRIL_46419_1Tender No
E.E. (A), C/Z - 02/2018-19Tender Authority
Department Of Agriculture ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Installation of Pump, Pipe & Fittings
-
-
-
... More
Supplying all materials ,labour and T&P for a set of Coil Earthing with No.8 GI wire using required quantity of common salt ,charcoal,GI nut and bolts including digging of earth pit of size 1.2mx1.2mx3.00 mtr and digging of wire trench and refilling the same after compltion of earthing works including cost of all materials etc.complete as per direction of site Engineer-in-charge.
4
10000
2500
... More
Bore (2)
90
85500
950
... More
Cost of 4HP submersible Pump set (3 Phase)
4
114040
28510
... More
Cost of 150mm dia PVC ASTM (D) Sch.80) casing pipe of reputed make as per ASTM-(D) 1785/2004 with manufactures name should prominently be marked with CIPET Test certification on the body of the pipe in indelible ink or stenciled to the certificaiton of the Engineer in charge, including transportation to site, etc.
-
-
-
... More
Cost of fittings such as Nipple,Reducer,Socket,NR valve,Sluice vale,8 Sqmm PVC coated wire rope.
4
25420
6355
... More
Cost of 3core PVC isulated armoured aluminium cable for 20 mtr
80
5600
70
... More
3 Nos for each bore well estimate including 20% on failed VES Test
4
27156
6789
... More
Construction and erection of 11 /0.4 KV , 25 KVA Double Pole mounted Substation Star rated confirming to RE Rules 1956, mounted on 2.44 Mtr. Long structure, supported in 300 kg 9 mtr long PSC pole,transformer hard channel & top channel made of 2.8 M long 100 X 50 X 6 mm M.S.Channel (9.2 kg/mtr), Transformer belting on 2.80 M long 50 X 50 X 5 mm M.S.Angle(4.5 kg/mtr),, (all REC SPN Std.F-3) with all accessories like 3 pole 11 KV HG Fuse(F-5)& A.B.Switches(F-9) both mounted on 2.8 M long 75 X 40 X 6 mm M.S.Channel and supported by 1.0 M long 50 X 50 X 6 mm M.S.Angle, with 3 No. 11 KV Lightening Arrestors & Distribution box for 25 KVA S/S, G.I.pipe earthing with 25X5mm G.I.Flats including cost of 25 KVA 11/0.4 K.V. 3 star rated Transformer , 35 Sqmm 3 ½ Core PVC Cable - 40 mtr couping & padding of Poles, Danger board at each Pole, Anti climbing Devices & all other necessary fittings i.e required size Nuts & Bolts, Brackets, Cable, Cable Sockets etc. including cost of all materials, labour , transportation complete with liasioning for testing inspection & commissioning.
1
268044
268044
... More
Labour for drilling a perfectly vertical bore hole of 300mm dia meter up to 50Mtr. depth below ground level through and unconsolidated formation with direct circulation mud rotary/ reverse circulation rotary rigs as required to suit the site conditions as per direction of the Engineer in charge including use of rigs with its accessories, tools & plant, consumables etc for lowering of 150mm dia meter PVC pipe (ASTM) for housing fitted with socket and with well screened as per necessity for soft / medium. hard/ boulder formation.
-
-
-
... More
Energy meter with panel,power capacitors,panel foundation,Display board etc
4
31200
7800
... More
Cost of Control panel board including consumables
4
24000
6000
... More
Bore (3)
30
1800
60
... More
Construction of 3 phase 4 wire Line using 8 mtr long 200 kg PSC Poles with LT XLPE AB Cable of (3X35 mmSq.+ 1X25mm sq.) along with all required materials and concreting of stay/poles LT Dead end clamp, suspension clamp with I - hook, stay accessories such as Wire Insulators, clamp etc. to complete power supply as per the field condition (40m Span length).
0.6
163860
273100
... More
Bore (1)
30
36000
1200
... More
Labour Charges of installation of pump,pipe,panel board,cable & other electrical equipments etc
4
6000
1500
... More
Lowering the following size of PVC Casing pipe/ slotted pipe as per necessity from ground level and fitted and fixed of perfectly in vertical position including cutting and threading and supplying all jointing materials, tools and plants etc. complete and keeping the top of the casing pipe threaded including clubbing the Tube Well to prevent entry of foreign materials from above the packing gravels around the casing in the annular space as per the direction of the Engineer. 0 to 50=50Mtr.
-
-
-
... More
ELECTRIFICATION
-
-
-
... More
Documentation including application form,water sharing aggrement,ayacut map with benificiary list,photographs(pre Installation & post Installation),DISTCOM estimate processing fee
4
2000
500
... More
Bore (1)
30
1800
60
... More
Bore (3)
90
85500
950
... More
Bore (3)
30
36000
1200
... More
Bore (4)
90
85500
950
... More
Bore (2)
30
1800
60
... More
PRELIMINARY
-
-
-
... More
Bore (2)
30
36000
1200
... More
Cost of 2'' dia PVC ASTM(Sch 80) pipe as perIS-1785/2004 for 50mmx60mtr for 4 Nos
240
40005
166.69
... More
Bore (4)
30
1800
60
... More
Survey & Investigation works like feasibility study,Preparation of Electrical Estimate,detailed scheme calling for application etc
4
7200
1800
... More
POWER SUPPLY
-
-
-
... More
Bore (1)
90
85500
950
... More
Cleaning and developing the Tube Well using own Air Compressor continuously worked till clear and adequately discharge is obtained from the well including supply and use of all necessary equipments and labour complete as per the direction of Engineer in charge.
4
28000
7000
... More
Cost of other fitting materials like cable,cable clip,LT panel box,kit kat etc
4
17420
4355
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements