The CWC has issued a formal invitation for competitive bids for the Central Water Commission project, for Diamond Core Drilling For Geo-technical Investigation Work At Different Locations Of Mat Sekawi Hydro Electric Project Under Neid-ii, Cwc, Aizawl, Mizoram in Aizawl, Mizoram, with an estimated contract value of Rs. 96,97,905. The bid opening date for this tender is 11-11-2026 and the last date for bid submission is 26-11-2026. Interested bidders for Central Water Commission tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Central Water Commission - CWC Tender - Mizoram Tender
Opening Date11 Nov 2026
Closing Date26 Nov 2026
Tender Amount₹ 96,97,905
Costs
EMD
₹ 1,93,958Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Diamond Core Drilling For Geo-technical Investigation Work At Different Locations Of Mat Sekawi Hydro Electric Project Under Neid-ii, Cwc, Aizawl, Mizoram
Contact
Tender Id
2026_CWC_933870_1Tender No
01/2026-27/NEID-II/AIZAWLTender Authority
Central Water Commission ViewPurchaser Address
-Website
http://cwc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
e tender doc for Diamond core Drilling for Geo-Technical Investigation work at different locations of Mat-Sekawi Hydro Electric Project under NEID-II, CWC, Aizawl, Mizoram.
e tender for Diamond core Drilling for Geo-Technical Investigation work at different locations of Mat-Sekawi Hydro Electric Project under NEID-II, CWC, Aizawl, Mizoram.
BOQ Items
... More
Dismantling transportation and assembling of drilling machine of different capacity complete by headload from one drill hole location to another drill hole location including construction of access path if any required, cost of all labour, material, T&P and POL as per specification and direction of Engineer in charge upto 100 m
18
-
-
... More
DIAMOND CORE DRILLING Carrying out of vertical diamond core drilling in NX size in different formations and locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS stds, their making and taking colour photographs of the preserved cores etc. complete with cost of all labours , T&P and POL as per specifications and directions of Engineer in charge Vertical drill hole-in overburden soil and sandy strata mixed with boulders
190
-
-
... More
DIAMOND CORE DRILLING Carrying out of vertical diamond core drilling in NX size in different formations and locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS stds, their making and taking colour photographs of the preserved cores etc. complete with cost of all labours , T&P and POL as per specifications and directions of Engineer in charge Vertical drill hole-in soft rock formation upto 50 m depth
190
-
-
... More
DIAMOND CORE DRILLING Carrying out of vertical diamond core drilling in NX size in different formations and locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS stds, their making and taking colour photographs of the preserved cores etc. complete with cost of all labours , T&P and POL as per specifications and directions of Engineer in charge Vertical drill hole-in hard rock formation upto 50 m depth
190
-
-
... More
Carrying out Permeability test (each test covering 5 m stretch of the drill hole) in drill holes at different depths in accordance with specification and relevant BIS code, Double Packer/ Single Packer as directed by Engineer in charge upto 50 m depth
114
-
-
... More
Conducting standard penetration test as per IS:2131 at approximate 1.5 m intervals in bore holes upto foundation level, as directed by the Engineer in charge.
114
-
-