The NIT has issued a formal invitation for competitive bids for the National Institute Of Technology project, for Construction Of Waste Disposal Shed With Approach (kutcha) Road For Nit Meghalaya At Saitsohpen, Sohra (cherrapunjee) in East Khasi Hills, Meghalaya. The bid opening date for this tender is 12-03-2025 and the last date for bid submission is 26-03-2025. Interested bidders for National Institute Of Technology tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

National Institute Of Technology - NIT Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date12 Mar 2025
Closing Date26 Mar 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork in excavation by Mechanical means up to a depth of 2 in below the existing ground level tor foundation, trenches of foundations, footings Of column/ walls, retaining walls, septic tank etc. including bailing out water where necessary and removal of surplus earth with all lead and lifts as directed and specified for the following classification of soils. ln hard rock Blasting Prohibited

345.95

-

-

... More
15 mm cement plaster on the rough side of single or half brick wall of mix: 1:4 (1 cement: 4 Fine sand)

857.75

-

-

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand)

77.12

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

5564.23

-

-

... More
Reinforcement cement concrete work in beams, slabs, roofs having slope up to 15 degree, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to first floor level, excluding the cost of centering, shuttering, finishing and reinforcement. M20 or 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)

0.75

-

-

... More
Providing and fixing pre-coated galvanised iron profile sheets (size, shape and pitch Of corrugation as approved by Engineer-in-charge) 0.50 mm..................excluding the cost of purlins. rafters and trusses and including cutting to size and shape wherever required.

500

-

-

... More
Earthwork in filling (excluding rock) in trenches, plinth, sides of foundation otc in layers not exceeding 20 cm thick including breaking Of clods, consolidating each layer by ramming and watering, lead up to 50 in and lift up to 1.5 in . With available excavated earth

108

-

-

... More
Supplying fitting and fixing in position reinforcement bars up to 1st floor level, conforming to relevant I.S. Code for R.C.C. Work/ R.B. Walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20 G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. ( Rates inclusive of all wastage, lappage, hooks, chairs, anchorage etc. and no measurement for the same is required) Thermo-Mechananically Treated bars

0.71

-

-

... More
Brick work with common burnt clay (non modular) 1st class bricks in foundation and in plinth

14.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.