Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Tourism And Cultural Affairs Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date11 Sep 2024
Closing Date20 Sep 2024
Tender Amount₹ 5,38,16,881
Costs
EMD
₹ 2,69,500Document Cost
₹ 3,540Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TCADM_1083781_1Bid Award Id
ViewTender No
E Tender/Notice 06/ 2024-25Tender Authority
Tourism And Cultural Affairs Department ViewPurchaser Address
-Website
http://mahatenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Lowering down carefully existing brick masonry of the monument manually in proper order including shifting the bricks up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete.
36
38700
1075
Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete.
11.45
20667
1805
Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete
3794.86
170768
45
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. [Rate as per RA No. 07]
2522.01
703640
279
Providing Soil Bag Support to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete.
557.28
1093940
1963
Cleaning the Stone / Masonry surfaces with help of chemical treatment with mixture of Chemicals such as Liquid Ammonia, Non-ionic detergent, mineral turpentine, sodium gluconate etc. by scraaping the surface with brush and making the surfaces even with hand scrapping, and then applying two coats of Chemicals such as Wacker BS-290 and Wacker OH 100 for stone preservation with scaffolding etc. complete.
4639.62
4857682
1047
Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the work sand pumping out water during and after excavation as may be required by using 3.0BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary))
240
42960
179
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means
2395.84
572605
239
Providing soiling using 80 mm size trap metal in 15cm. Layer including filling voids with sand/ grit ramming, watering complete.
1091.43
2377134
2178
Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete
458.01
3645301
7959
Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in superstructure as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
380.4
3322413
8734
Providing/Re-setting Ashlar Fine Masonry of reuse-stones in lime mortar 1:1 in superstructure as per detailed specifications and drawings or as directed including the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
3.22
22610
7022
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with average size of stone 90 cm. x 40 cm. x 23 cm. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For wall layers of temple
15.98
1005861
62945
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with average size of stone 270 cm. x 50 cm. x 50 cm. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete . For Stone Beams of temple
0.56
39687
70870
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with average size of stone 150 cm. x 60 cm. x 30 cm. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Slabs, Ceilings of Temple
16.69
1112905
66681
Providing Coursed Rubble Masonry Second Sort of trap / granite stones in lime mortar 1:1½, size of stone 45 cm. x 30 cm. x 20 cm. in superstructure as per detailed specifications and drawings or as directed including the stones shall be laid in horizontal course, the face of the stones to be hammered and bushing not to be project more than 3.8 cm. (1½″), all stones to be set full in mortar, all side joints shall be vertical and beds horizontal and not joints shall be more than 12.5 mm. (½″), the through stones shall be inserted 5 and 6 feet apart in every course, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
202.5
3018667
14907
Providing Brick Masonry First Class in superstructure of first quality bricks of size 0.25 x 0.15 x 0.04 m in lime mortar 1:1½, as per detailed specifications and drawings or as directed including the bricks to be of uniform size, moulded on tables, thoroughly well burnt and sound, ringing clearly when stuck with trowel, the bricks to be soaked in water for 12 hours before used, the bricks are to be laid flush in mortar in such bond as directed, as far as possible, bricks of uniform colour are to be selected for the face work when it is not to be plastered, the joints are not to exceed 9.5 mm. (⅜″), no bats or half brick to be used in the work, racking out joints where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
120.39
1873990
15566
Providing 12 mm. thick Rough Cast Lime Plaster in single coat in lime mortar 1½:1 in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. [Rate as per RA No. 21]
2170.35
1790538
825
Providing ornamental / artwork plaster 12 to 18 mm thick Lime Plaster in single coat in lime mortar 1½:1 in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. [Rate as per RA No. 22]
1022.27
1254325
1227
Providing Fine Coat Of Lime over rough cast plaster in superstructure, as per detailed specifications and drawings or as directed including the finishing coat is to be applied over rough cast plaster and well-polished with trowel, preparing the lime mortar, scaffolding and watering complete.
3192.62
1682510
527
Providing and fixing Stone Paving, First Sort in lime mortar 1:1, with size of stone 60 cm. x 45 cm. x 15 cm., as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be very finely chisel-dressed on the surface and the course to be of prescribed width, the joints running true, the stones to be laid with joints not exceeding 6 mm. (¼″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.
53.54
417290
7794
Providing/Re-setting Stone Paving, Second Sort of reuse-stones in lime mortar 1:1½, per detailed specifications and drawings or as directed including the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.
1292.78
2782062
2152
Providing and fixing Stone Paving, Second Sort in lime mortar 1:1½, with size of stone 60 cm. x 45 cm. x 15 cm., as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1″), the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.
2972.28
19174178
6451
Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete.
65.7
541696
8245
Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete.
2636.4
282094
107
Providing and supplying the repair mortar for reparing the stone surfaces for purpose of strengthening and reattachement of stones with help of lime mortar of 1:3. adding stone dust and various chemicals approvd by architect including all necessary actions and required tools and machineries, scaffolding, curing etc. complete.
50
48250
965
Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed design sand drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anti corrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete.
2.1
251208
119623
Strenghtening the existing crack and attaching missing mouldings to existing structures in external wall of stone masonry by "Dry Mechanical Pinning & Remedial Tying System" including of scafolding ,drilling holes, fixing the pins and grouting with epoxy as per Manufacturers specification etc. complete
30
64620
2154
Providing and applying melamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scrapping, applying French polishing, scaffolding if required etc. complete. Note:The work to be executed on prior approval of Superintending Engineer will be necessary
240
198960
829
Carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chisscling & dressing on stone surface for govering at the stone surface after chisling a fine surface rate for as per market rate.
0.1
91535
915356.1
Carving ornamental work on surface including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chiseling & dressing on stone surface for ornamental carving work surface etc. as per existing design. pattern and form as directed by engineer in charge
2.5
27125
10850.02
Disposing off / conveying the dismantelled materials of stone masonry / brick masonry/ concrete/ debris/ excavated material / soil murrum / rubbish material or vegetation / grass / shrubs etc. from site to 5 Km as directed by Engineer incharge
2395.84
603751
252
Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5" X 7" Size outdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shooting, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete [
1
200000
200000
Book Designing, Publishing and Printing: The work involves printing of a book / guidebook on the fort / monuments and its various aspects, which would provide authentic and precise tourism oriented information. This work involves important photographs of the site, art objects, antiquities, inscriptions etc., which would be useful for educating the masses of the rich cultural heritage of the site, region and state. providing 100 pages coloured books as directed by engineer in charge / ADA ]
500
325000
650
Carrying out Chemical Analysis of Existing material used in the construction of Monument etc. complete