Thermax Limited Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Thermax Limited Tender
Machinery and Tools
Eprocure
Opening Date12 Dec 2024
Closing Date27 Jan 2025
Tender AmountRefer Documents
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Skid Mounted Single Tube Reactor
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DST_839159_1Tender No
TL/CCU2401/2024/OTN-01Tender Authority
Thermax Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Gas connection line of N2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
1
-
-
... More
Gas manifold for connecting 4 CO2 cylinders along with necessary isolation valves. PT with low pressure alarm
1
-
-
... More
Gas manifold for connecting 8 H2 cylinders along with necessary isolation valves. PT with low pressure alarm
2
-
-
... More
Gas manifold for connecting 4 CO cylinders along with necessary isolation valves. PT with low pressure alarm
1
-
-
... More
Gas manifold for connecting 4 N2 cylinders along with necessary isolation valves. PT with low pressure alarm
1
-
-
... More
Feed tank-01 43A-TT-01 complete with manual feeding option, pressure gauge, level transmitter, temperature element, provisions of N2 blanketing and necessary accessories viz. isolation valve, pressure safety valve, tubing/hose, drain nozzle with double valve system etc.
1
-
-
... More
Dosing pumps 43A-PA-01 complete with inlet/outlet isolation valves for transfer of liquid feed, tubing/hoses, strainers etc.
1
-
-
... More
Static mixture (43A-SM-01)
1
-
-
... More
Auto Sample handling and switchover system with necessary accessories as mentioned in annexure T1 to T3
1
-
-
... More
Manual Sampling handling system with necessary accessories as mentioned in annexure T1 to T3
1
-
-
... More
Feed heater 43A-FH-01: as mentioned in annexure T1 to T3
1
-
-
... More
Reactor 1 43A-RE-01: as mentioned in annexure T1 to T3
1
-
-
... More
Reactor 2 43A-RE-02: as mentioned in annexure T1 to T3
1
-
-
... More
Thermosyphon loop: as mentioned in annexure T1 to T3
1
-
-
... More
Product cooler 43A-EE-01: as mentioned in annexure T1 to T3
1
-
-
... More
Water Chiller 43A-WC-01: as mentioned in annexure T1 to T3
1
-
-
... More
Gas-liquid separator 43A-VV-01: as mentioned in annexure T1 to T3
1
-
-
... More
Product storage tank-02 43A-TT-02: as mentioned in annexure T1 to T3
1
-
-
... More
Skid for single tube reactor unit
1
-
-
... More
All tubing, fittings, valves, tubing work: as mentioned in annexure T1 to T3
1
-
-
... More
All miscellaneous E&I items: as mentioned in annexure T1 to T3
1
-
-
... More
Power and control Panel, with PLC & required hardware, software, cables, field equipment and overall electrical work as mentioned in annexure T1 to T3
1
-
-
... More
Installation, testing and commissioning work: as mentioned in annexure T1 to T3
1
-
-
... More
Spares as mentioned in Section K
1
-
-
... More
Gas Detectors as mentioned in Annexure – T1 to T3.
1
-
-
... More
Line Heaters as mentioned in Annexure – T1 to T3
1
-
-