The RDD has issued a formal invitation for competitive bids for the Rural Development Department project, for Constructing 200 Mm Rcc Underground Gutter At Sapatane Bhose Tal Madha Dist Solapur in Solapur, Maharashtra, with an estimated contract value of Rs. 4,99,562. The bid opening date for this tender is 27-09-2024 and the last date for bid submission is 05-10-2024. Interested bidders for Rural Development Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rural Development Department - RDD Tender
Opening Date27 Sep 2024
Closing Date5 Oct 2024
Tender Amount₹ 4,99,562
Costs
EMD
₹ 5,000Document Cost
₹ 100Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SOLAP_1095198_1Bid Award Id
ViewTender No
Constructing 200 mm RCC Underground Gutter At Sapatane Bhose Tal.Madha Dist.SolapurTender Authority
Rural Development Department ViewPurchaser Address
-Website
http://https://rdd.maharashtra.gov.in/en
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Item No. 11 :- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete.
128.33
11806
92
... More
Item No. 2:- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M)
54.6
10210
187
... More
Item No. 11 :- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete.
4.48
26346
5881
... More
Name Of Work:- 01.Constructing 200 mm RCC Underground Gutter At Sapatane Bhose.Tal.Madha Dist.Solapur.
-
-
-
... More
Item No. 9 :- Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all class of pipes.) as per IS- 783-1985. NP2 TYPE RCC 200mm PIPE
260
37440
144
... More
Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) For 200 mm RCC NP 2 Pipe
72.8
12012
165
... More
Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto 0 to 1.5 M)
36.4
22895
629
... More
Item No. 7 :-Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, giving satisfactory hydraulic testing as per IS code, etc. complete. 75 mm Dia. PVC 4 Kgcm2
66
1848
28
... More
Item No. 10 :- Providing and constructing B/B masonary Valve Chamber with 15 cm thick 1:3:6 proportion PCC bedding additoinal excavaton B.B. masonary in CM 1:5 cm thick precast RCC Size Of a Chamber 0.6x0.45x0.90
24
177264
7386
... More
Item No. 4 :- Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed,
removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259)
4.48
5013
1119
... More
Item No. 6 :-Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no.4985/1988 including all local and central taxes, transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to the departmental stores and including cost of jointing material i.e. solvent cement, etc. complete. 75 mm Dia. PVC 4 Kgcm2
66
7590
115