Rural Development Department Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Rural Development Department - RDD Tender
Eprocure
Opening Date15 May 2025
Closing Date20 May 2025
Tender Amount₹ 12,52,237
Costs
EMD
Refer DocumentsDocument Cost
₹ 500Tender Fee
₹ 500
Summary
Special Repairs To Percolation Tank at Waki Shivane (Naralewadi, Galave Wasti, Katkar Shet)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SOLAP_1180482_1Bid Award Id
ViewTender No
ET/GPWAKISHI/DPC/2024-25Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://https://rdd.maharashtra.gov.in/en
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Item No.4 : Excavation in all kinds of Soils & Soft murum including boulders up to 0.6 m diameter (0.113cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .
235
38
8965.25
... More
Item No.5 : Excavation in Hard Murum including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .
235
49
11597.25
... More
Item No.6 : Excavation in Soft Rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .
630
64
40446
... More
Item No.7 : Providing cut off trench filling using selected impervious soil from approved borrow areas including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
1100
166
183150
... More
Item No. 8 : Providing hearting embankment using selected impervious soil from approved borrow areas in layers including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
-
-
-
... More
Including Watering & Consolidation By Other Than Mechanical Means .
1464
138
202105.2
... More
Item No. 9 : Providing casing embankment using selected pervious material available directly from excavation , laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, including watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor / excluding compaction etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete . A ) Top Shrunked Portion Including Watering & Compaction with vibratory compacter
556
77
42895.4
... More
B ) U/S Berm & D/S Resectioning Including Watering & Consolidation By Other Than Mechanical Means .
725
66
48212.5
... More
Item No. 10 : Providing casing embankment using selected pervious material from approved borrow areas , laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete . U/S Berm & D/S Resectioning Including Watering & Consolidation By Other Than Mechanical Means .
977
171
167555.5
... More
Item No. 11 : Providing and constructing 200 mm thick dry rubble stone pitching using stones and stone chips from locally available, excavated materials including labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. Including 1 % Cess for labour welfare etc. complete .
1941
45
88024.35
... More
Item No.12 : Providing and constructing 230 mm thick dry rubble stone pitching using stones and stone chips from approved source from borrow area including cost of all materials, labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. including 1 % Cess for labour welfare etc. complete .
613
199
122109.59999999999
... More
Item No 13 : Providing and fixing information board of 1.2 x 0.75 m prepared on 16 gauge M.S. sheet with angle iron frame of size 35 X 35 X 3 mm with cross bracing of size 25 X 25 X 3 mm including painting with one coat of zinc chromate storing primer and two coats each of green/white back ground and back side grey store enameled bonded with red retro reflective sheet Engineering grade, border / letters / numeral / arrows coated with non pealable crystal clear protective transparent coat retaining 100% reflection including two angle iron post of size 50X50X5 mm of 3.65 m long inflated at bottom drilled on top and painted in white and black bonds of 30 cm with four numbers high strength of G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete in M-15 block of size 60 X 60 X 75 cm as directed by engineer-in-charge including 1 % Cess for labour welfare etc. complete .
1
6547
6547.25
... More
Item No.14 : Royalty Charges For Construction Material
-
-
-
... More
For Other Mineral
150.98
216
32649.425
... More
Item No.15 : 1 % Cess For Insurance
1
10523
10523
... More
Item No.16 : CGST 9 %
1
94707
94707
... More
Item No.17 : SGST 9 %
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements