The RCFL has issued a formal invitation for competitive bids for the Rashtriya Chemicals And Fertilizers Limited project, for Construction Of Rcc Foundation For P-1 Foundation (11 And 21 Unit) And Instrument Air Compressor Foundation And Allied Works In Urea Plant At Rcf Thal in Raigarh, Maharashtra, with an estimated contract value of Rs. 54,04,133. The bid opening date for this tender is 11-02-2025 and the last date for bid submission is 19-02-2025. Interested bidders for Rashtriya Chemicals And Fertilizers Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rashtriya Chemicals And Fertilizers Limited - RCFL Tender

Opening Date11 Feb 2025
Closing Date19 Feb 2025
Tender Amount₹ 54,04,133 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removal and carriage of surplus excavated material to the disposal point as directed by EIC, anywhere in the factory, within 3 km.

300

219

-

... More
Providing and fixing misc. materials not covered in the schedule of rates including transporting, loading, unloading at site etc. (cash receipt to be submitted).

1

50000

-

... More
Suppying, fabricating and fixing in position M.S. holding down bolts assembly cosisting of bolts, heads, nuts, washers etc of Grade 4.6 or as per relevant IS-1363 and IS -1367 as approved by EIC like including embeding in cement concrete/R.C.C. works as per approved drawings complete in all respects including one coat of anticorrosive paint over a coat of approved quality primer.

500

180

-

... More
Fabricating structural steel work in rolled sections, fixed with connecting plates or angle cleats in main and cross beams, hip and jack rafters, purlins connecting to truss members, joists, channels, angles, tees etc. As per detailed designs and drawing or as directed including cutting, fabricating, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting complete..(RCF will supply structural steel & paint free of cost at RCF stores. Transportation at site is in the scope of contractor without any extra payme.Note- If contractor is instructed for fabrication only i.e. item excluding erection only then the rate is reduced by Rs. = 8000.00 per MT.

5

22234

-

... More
Excavation by Manual Means, in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) in Running Plant compressor area conditions.

130

621

-

... More
Making and fixing arrangements for pockets in Pedestal/columns/footing /RCC works of approximate size ranging from 100mm x 100 mm to 300mm x 300mm with depth upto 1000 mm for receiving MS bolts, anchor bolts as approved by EIC etc. complete in all aspects as directed Engineer In Charge.

56

350

-

... More
Providing dry trap rubble stone soling 15 to 20 cm. thick including filling the voids,hand packing & compacting etc. complete as directed.

37

1382

-

... More
Supply, cut, bend and fix in position High Yield strength Deformed bars of Fe-500D grade for all diameters confirming to IS 1786, including tying with binding wire (18 SWG Annealed wire) or welding with old steel, tested steel reinforcement for all reinforced concrete at all locations and levels, including transporting, handling etc. complete.No separate payment for chairs, laps, wastage and binding wire will be made (SAIL, TISCON, RINL,JINDAL brands only).

17

89703

-

... More
Removing GI or AC. sheet roofing and stacking the matrials as directed with all leads, lifts etc. Complete.

100

89

-

... More
Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete.

2

101844

-

... More
Refixing 'existing roofing material, after sorting and cleaning, removed from the existing structure or supplied by rcf ltd, using 8m dia galvanized iron l or J hook bolts, galvanized iron & bituminous washers, or self drilling fastners and epdm washers, galvanized iron clamps, nuts and bolts including sealing the existing holes with suitable material etc. Complete and as directed. (net area covered by sheeting will be measured. Overlaps will not be paid separately). The rate is including 8mm dia. GI hook bolts and nuts, washers.

100

158

-

... More
Design of P1 foundation (2 nos) and IAC and Dryer foundations in Urea plant in conusltation with RCF as per modifications suggested, existing site/soil conditions along with preparation of existing and proposed modification drawings, submission of detailed design and RCC/fabrication drawings and issue of stability certficate after completion of work.

1

125000

-

... More
Providing and laying Cast in situ/Ready Mix cement concrete in 1:3:6 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete.

20

5859

-

... More
Dismantling the concrete with electric/hydraulic breakers including sorting out serviceable materials etc.as directed and disposal within the lead of 3 km as directed etc. complete.

75

1451

-

... More
Providing and laying “GP-2 (Fosroc) or any other approved equivalent anti-shrinkage grouting in pockets/sleeves, under base plates of structural columns as specified in the drawing, dynamic machines such as heavy pumps and compressors as per manufacturer's specifications, complete in all respects as per direction of Engineer-in-Charge.

9

41000

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.