The RCFL has issued a formal invitation for competitive bids for the Rashtriya Chemicals And Fertilizers Limited project, for Arc For Servicing Maintenance And Repairs Of Various Water Pumps In Rcf Estate At Chembur, Mumbai - 400074 in Mumbai, Maharashtra, with an estimated contract value of Rs. 17,22,237. The bid opening date for this tender is 10-05-2025 and the last date for bid submission is 31-05-2025. Interested bidders for Rashtriya Chemicals And Fertilizers Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rashtriya Chemicals And Fertilizers Limited - RCFL Tender

Works
Machinery and Tools
Eprocure
Opening Date10 May 2025
Closing DateCancelled
Tender Amount₹ 17,22,237 
Notes
Download

Costs

Summary

Arc For Servicing Maintenance And Repairs Of Various Water Pumps In Rcf Estate At Chembur, Mumbai - 400074

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of required materials for any specific pump while servicing / overhauling the pumps. The contractor shall arrange the required materials promptly, taking utmost care to commission the Pump at the earliest as directed. Coupling bolts.

2

183

366

... More
Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 3" & 4” dia. valve.

1

6781

6781

... More
Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 6” dia. valve.

1

8432

8432

... More
Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 8” dia. valve.

1

9425

9425

... More
Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 10” dia. valve.

1

10417

10417

... More
Identifying after inspecting the specific valve, as directed & if required, removing the damaged spindles & assorted fittings & replace the same by providing & fixing with new spindles (bronze material) of specific quality alongwith necessary fixtures, fastening, etc. as shown & as directed. For 12” dia. valve

1

11741

11741

... More
Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 80mm dia. valve.

2

4360

8720

... More
Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 100mm dia. valve.

2

4537

9074

... More
Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 150mm dia. valve.

2

5266

10532

... More
Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 250mm dia. valve.

1

6589

6589

... More
Replacing and refixing of existing check nut with new check nut (Phosphorous bronze alloy) for the sluice valve/gate valve including dismantling and assembling of sluice valve/gate valve, cutting machining, threading, finishing, matching the diameter and thickness of existing spindle collar and threads etc complete in all respects including cleaning of Valve chamber and as directed by Engineer In Charge. This item includes replacement of corroded nut bolts. For 300mm dia. valve.

1

8596

8596

... More
Replacing bearing of any size for Pump/Motor etc. after removing the old existing bearings as directed.

5

1913

9565

... More
Re-conditioning of valves of any size as shown and as directed by and replacing the same as directed.

5

413

2065

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Impeller (Cast Iron) DSM 2E pump

1

6054

6054

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Impeller (Cast Iron) DSM 3ME pump

1

8706

8706

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Impeller (Cast Iron) 3 UP 3 pump

1

8823

8823

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Impeller (Cast Iron) 4 UP 3 pump

1

10666

10666

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Pump Shaft (Material C-40)DSM 2E

1

4549

4549

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Pump Shaft (Material C-40) DSM 3ME

1

6781

6781

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Pump Shaft (Material C-40) 3 UP 3 pump

1

4663

4663

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Pump Shaft (Material C-40) 4 UP 3 pump

1

6696

6696

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Interstage Ring (C.I.) DSM 2E

1

825

825

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Interstage Ring (C.I.) DSM 3ME

1

1389

1389

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Casing Ring (C.I.). DSM 2E pump DE/NDE side

1

785

785

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Casing Ring (C.I.). DSM 3ME pump DE/NDE side

1

1200

1200

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Casing Ring (C.I.). 3 UP 3 pump DE/NDE side

1

745

745

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Casing Ring (C.I.). 4 UP 3 pump DE/NDE side

1

911

911

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Shaft Sleeve for (C.I.). 4 UP 3 pump DE/NDE side

1

1646

1646

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Shaft Sleeve for (C.I.). 3 UP 3 pump DE/NDE side

1

1223

1223

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Stuffing box bush (C.I.). DSM 3ME pump

1

446

446

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Stuffing box bush (C.I.). 3 UP 3 pump

1

398

398

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Gland Followers (C.I.).DSM 2E pump

1

520

520

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Gland Followers (C.I.). DSM 3ME pump

1

911

911

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Gland Followers (C.I.). 4 UP 3 pump

1

712

712

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Gland Followers (C.I.). 3 UP 3 pump

1

463

463

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Lantern Ring for all type of pump (Nylon Material)3 UP 3 pump

1

372

372

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Lantern Ring for all type of pump (Nylon Material) 4 UP 3 pump

1

561

561

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Lantern Ring for all type of pump (Nylon Material) DSM 3ME

1

577

577

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cartridge (C.I.) DSM 3ME pump DE/NDE side

1

2313

2313

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cartridge (C.I.) 3 UP 3 pump DE/NDE side

1

2064

2064

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cartridge (C.I.) 4 UP 3 pump DE/NDE side

1

2150

2150

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cover (C.I.) DSM 3ME pump DE/NDE side

1

613

613

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cover (C.I.) 3 UP 3 pump DE/NDE side

1

577

577

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Bearing Cover (C.I.) 4 UP 3 pump DE/NDE side

1

621

621

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed .For Dowel pins for bush/casing/ring for all type of pumps.

1

430

430

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed .For Impeller key/coupling key for any type of pump.

1

430

430

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed . For Nut (steel) for shaft/Bearing/Sleeve/Impeller. DSM 3ME pump DE/NDE side

2

446

892

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed . For Nut (steel) for shaft/Bearing/Sleeve/Impeller. 3 UP 3 pump DE/NDE side

2

446

892

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed . For Nut (steel) for shaft/Bearing/Sleeve/Impeller. 4 UP 3 pump DE/NDE side

2

825

1650

... More
Supply of required materials for any specific pump while overhauling the pump. The contractor shall arrange the required materials promptly taking utmost care to commission the pump at earliest as directed. For Liquid/water Deflector (Rubber) for any type of pump.

20

249

4980

... More
Identifying after inspecting the foot valve & assorted fitting, providing and fixing with New Foot valve for any special pump to its suction line. The contractor shall arrange the required material promptly, taking utmost care to commission the same at the earliest. 4” dia. foot valve of Flagged type (C.I.)

2

7501

15002

... More
Identifying after inspecting the foot valve & assorted fitting, providing and fixing with New Foot valve for any special pump to its suction line. The contractor shall arrange the required material promptly, taking utmost care to commission the same at the earliest. 6” dia. foot valve of Flagged type (C.I.)

2

12361

24722

... More
P/F a leather washer for 4” dia. foot valve.

2

413

826

... More
P/F a leather washer for 6” dia. foot valve.

2

496

992

... More
Servicing of water pump, including replacement of Gland packing, Greasing of Ball Bearings, Inspection of Alignment of pump , rectification, if necessary, tightening the foundation Nut Bolts as required. Testing the pump operation to run the pump effectively & smoothly. Servicing system shall be done once in a month or as required to the satisfaction of Engineer In-charge for the following capacity. (No extra payment shall be made for gland packing & grease .) Upto 10 H.P.

50

702

35100

... More
Servicing of water pump, including replacement of Gland packing, Greasing of Ball Bearings, Inspection of Alignment of pump , rectification, if necessary, tightening the foundation Nut Bolts as required. Testing the pump operation to run the pump effectively & smoothly. Servicing system shall be done once in a month or as required to the satisfaction of Engineer In-charge for the following capacity. (No extra payment shall be made for gland packing & grease .) above 10 H.P. upto 50 H.P.

20

1114

22280

... More
Overhauling of pump, including de-assembling of pump, Inspection of material parts for Wear and Tear, cleaning of all the parts of pump. Replacement of worn out parts as required ( parts as per the list of Item no.3 & 13 ) , including Ball bearings, Gland packing & Grease. Replacement of rusted and broken Nut Bolts of Foundation & base plate, repairing of priming lines, valves, base plate, etc. Remaining checking & insuring that all parts are fixed at proper places alongwith Do’well pins, locking bearings coupling with lock washer and lock nut, assembling in proper manner & finally doing the True Alignment & Testing the Delivery pressure rating & satisfactory trial etc. all as directed by the Engineer In-charge. (No extra payment shall be made for gland packing & grease.) Upto 7.5 H.P.

8

2313

18504

... More
Overhauling of pump, including de-assembling of pump, Inspection of material parts for Wear and Tear, cleaning of all the parts of pump. Replacement of worn out parts as required ( parts as per the list of Item no.3 & 13 ) , including Ball bearings, Gland packing & Grease. Replacement of rusted and broken Nut Bolts of Foundation & base plate, repairing of priming lines, valves, base plate, etc. Remaining checking & insuring that all parts are fixed at proper places alongwith Do’well pins, locking bearings coupling with lock washer and lock nut, assembling in proper manner & finally doing the True Alignment & Testing the Delivery pressure rating & satisfactory trial etc. all as directed by the Engineer In-charge. (No extra payment shall be made for gland packing & grease.) 10 HP to 25 H.P.

2

2686

5372

... More
Overhauling of pump, including de-assembling of pump, Inspection of material parts for Wear and Tear, cleaning of all the parts of pump. Replacement of worn out parts as required ( parts as per the list of Item no.3 & 13 ) , including Ball bearings, Gland packing & Grease. Replacement of rusted and broken Nut Bolts of Foundation & base plate, repairing of priming lines, valves, base plate, etc. Remaining checking & insuring that all parts are fixed at proper places alongwith Do’well pins, locking bearings coupling with lock washer and lock nut, assembling in proper manner & finally doing the True Alignment & Testing the Delivery pressure rating & satisfactory trial etc. all as directed by the Engineer In-charge. (No extra payment shall be made for gland packing & grease.) 25 HP to 50HP

11

3806

41866

... More
Inspecting the specified pump in connection with Shaft, Sleeve alongwith connected fittings and machining the existing old shaft as per requirement and/or otherwise alongwith sleeve and assorted fittings

15

372

5580

... More
Servicing of valves of any type and size inclusive of necessary greasing, gland packing materials, etc. as specified and as directed.

60

124

7440

... More
Removing, adjusting, unserviceable 6” dia. old Water Meter from existing locations & connecting the pipe line with 6” dia. Flanged distance piece for restoring Water Supply, transporting the meter from RCF site to BMC Hydraulic Department & back to RCF site and Re-fixing. The tested water meter in position at the existing place after removing the distance piece, etc. as directed. All above job to be got done through BMC’s Licenced Plumber.

1

47679

47679

... More
Material direct purchase/Parts repaired on lathe machine: Supply/Repair of pump parts as replacement/repair of broken parts etc. as per RCF requirement. (Payment as per actual cost as per tax invoice plus 10% for transporation, handling etc.)

100000

1

100000

... More
Providing & Supplying, loading, transporting on site, unloading, lowering in trenches and assembling of C.I. specials Conforming IS : 1538 etc complete in all respect and as directed by Engineer in Charge.: Flanged specials upto 300 mm dia

500

137

68500

... More
Fabricating ,Supplying & transporting M.S. material of required thickness suitable for lead joint / mechanical joints to site of work , minor fixtures such as man hole frame & covers, pressure and non-pressure type blank flanges, loose flanges, rings, saddle pieces, small pieces to form saddle pieces, collars, clamp collars, bends / tees of various sizes with or without suitable sockets / flanges, small pieces of pipes with or without suitable sockets / flanges, end caps, ladders, platforms, stiffener rings etc. Payment will be made as per actual weight of material.

500

80

40000

... More
Providing and fixing CI Mechanical joint split collars suitable for repair of cracks/ leakages of CI/ DI pipes (Inclusive of Odd size pipes) as per RCF specifications complete with sealing rubber gasket made of SBR and galvanized 'T' bolts and nuts. The whole assembly mechanically and Hydraulically tested to the provisions laid down in IS 1538/1993 or IS13382/1992 whichever is applicable. This item includes dewatering of body water cleaning of pipe and arresting leakages etc complete as directed by Engineer in Charge: FOR 80MM DIA PIPES

1

5741

5741

... More
Providing and fixing CI Mechanical joint split collars suitable for repair of cracks/ leakages of CI/ DI pipes (Inclusive of Odd size pipes) as per RCF specifications complete with sealing rubber gasket made of SBR and galvanized 'T' bolts and nuts. The whole assembly mechanically and Hydraulically tested to the provisions laid down in IS 1538/1993 or IS13382/1992 whichever is applicable. This item includes dewatering of body water cleaning of pipe and arresting leakages etc complete as directed by Engineer in Charge: FOR 100MM DIA PIPES

1

8017

8017

... More
Providing and fixing CI Mechanical joint split collars suitable for repair of cracks/ leakages of CI/ DI pipes (Inclusive of Odd size pipes) as per RCF specifications complete with sealing rubber gasket made of SBR and galvanized 'T' bolts and nuts. The whole assembly mechanically and Hydraulically tested to the provisions laid down in IS 1538/1993 or IS13382/1992 whichever is applicable. This item includes dewatering of body water cleaning of pipe and arresting leakages etc complete as directed by Engineer in Charge: FOR 150MM DIA PIPES

1

10878

10878

... More
Supply of single phase quarter turn electric actuator with butterfly valve of Flowtork/ Marsh make or equivalent Actuator model : QFT03 , Size -80 mm, For on /off Application

2

20028

40056

... More
Supply of single phase quarter turn electric actuator with butterfly valve of Flowtork/ Marsh make or equivalent Actuator model : QFT05, Size -100 mm, For on /off Application

2

21956

43912

... More
Supply of single phase quarter turn electric actuator with butterfly valve of Flowtork/ Marsh make or equivalent Actuator model : QFT05,Size -150 mm, For on /off Application

2

27846

55692

... More
Supply of single phase quarter turn electric actuator with butterfly valve of Flowtork/ Marsh make or equivalent Actuator model : QFT05,Size -200 mm, For on /off Application

2

21958

43916

... More
Supply butterfly valve only with lever of Flowtork/ Marsh make or equivalent 80 mm Butterfly valve only with lever

2

3213

6426

... More
Supply butterfly valve only with lever of Flowtork/ Marsh make or equivalent 100 mm Butterfly valve only with lever

1

8033

8033

... More
Supply butterfly valve only with lever of Flowtork/ Marsh make or equivalent 150 mm Butterfly valve only with lever

1

9532

9532

... More
Supply butterfly valve only with lever of Flowtork/ Marsh make or equivalent 200 mm Butterfly valve only with lever

1

11246

11246

... More
Supply of 230vac 50hz, with RC network motor, of Flowtork/ Marsh make or equivalent 230vac 50hz, with RC network motor, QFT 03

2

5676

11352

... More
Supply of 230vac 50hz, with RC network motor, of Flowtork/ Marsh make or equivalent 230vac 50hz, with RC network motor, QFT 05

1

5676

5676

... More
Supply of 230vac 50hz, with RC network motor, of Flowtork/ Marsh make or equivalent 230vac 50hz, with RC network motor, QFT 10

1

8568

8568

... More
Supply of 230vac 50hz, with RC network motor, of Flowtork/ Marsh make or equivalent 230vac 50hz, with RC network motor, QFT 20

1

10710

10710

... More
Supply 2 feet Extension rod for actuator

1

1607

1607

... More
Supply of Labours for 8 hrs, with necessary tools for odd & unmeasurable jobs such as fixing of parts accessories/ fittings after necessary removal etc. (Which is not covered under item no. 1 to 14) as specified and as directed. (Min wage) Skilled worker including welder, gas cutter etc. with tools & tackles such as gas for cutting and welding machine with welding rods, if required. (954*1.25=1192.5)

30

1193

35790

... More
Supply of Labours for 8 hrs, with necessary tools for odd & unmeasurable jobs such as fixing of parts accessories/ fittings after necessary removal etc. (Which is not covered under item no. 1 to 14) as specified and as directed. (Min wages) unskilled worker whereever required. (Helpers / rigger) (783*1.25=978.75)

50

979

48950

... More
For day to day monitoring of Township water supply system including rectification or minor trobleshooting of automation system of values, Panels located in all six pump houses etc, keeping check on pump houses water tanks Maintainging water meter readings, checking levels of water tanks at all six pump houses, Township buildings etc (timiing 06:00 Hrs to 22:00 Hrs) or round the clock whereever required as dirtected by EIC.

365

2003

731095



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.