Konkan Railway Corporation Limited Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Costs
EMD
₹ 11,97,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Design, Supply, Erection, Testing And Commissioning Of Ohe Work Including Provision Of Foundations For The Work Of "design, Supply, Erection, Testing And Commissioning
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
KR-CO-EL-WADI-T-20-25-CORPORATE OFFICE-ELECTRICAL/KRCLTender No
KR-CO-EL-WADI-T-20-25Tender Authority
Konkan Railway Corporation Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
2(a)Erection: Concrete for foundation and plinth(i) In hard soil: (For Concrete Mix of M 10 and M 15 Grade in Foundation)
1000
180
180000
... More
31(j) Extra on erection rate for work under a power block- Dismantling of a Post/ Pedestal Insulator.
-
-
32
... More
31(i) Dismantling of an Isolator
-
-
29
... More
2(cz)Erection: Concrete for foundation and plinth: Reinforced concrete for foundation and plinth in other than hard soil & rock (Grade M-20)
250
450
112500
... More
31(t)(iii) Extra on erection rate for work under a power block- Dismantling of anticreep with galvanised Steel wire.
448
1350
604800
... More
2(b)Erection: Concrete for foundation and plinth: I n other than hard soil and rock(For Concrete mix 0f M-10 and M-15 grading Foundation)
19000
180
3420000
... More
2©Erection: Concrete for foundation and plinth: Reinforced concrete (M-15 Grade)
-
-
14
... More
2(az) Erection: Concrete for foundation and plinth(i) In hard soil (For concrete mix of M 15 and M 20 Grade in Foundation)
250
180
45000
... More
11(a)(ii)Erection without Insulator of a suspension (9 Tonne) Insulator
-
-
14
... More
5(a)(i)Supply without insulator of mounting arrangements for span wire.
-
-
5
... More
31(gz) Erection: Dismantling of a Section Insulator Assembly
-
-
27
... More
31(p)Dismantlement of drop arms/ booms / temporary masts.
-
-
33
... More
31(j) Dismantling of a Post/ Pedestal Insulator.
-
-
31
... More
2(j)Supply: Concrete fo r foundation and plinth: Concrete for Cylindrical type side bearing foundations (M-15 and M- 20) (SBC - 11000 kgf/sqm)
80
7380
590400
... More
31(d) Dismantling of overhead equipment.
-
-
20
... More
31(a) Extra on erection rate for work under a power block- Transfer of equipment from one mast or support to another.
1344
1188
1596981.12
... More
1(c)Preparation of Station Working Rules and Instructions
-
-
2
... More
40 - Erection of Number Plates on existing masts
-
-
39
... More
11(a)(ii)Supply without Insulator of a suspension (9 Tonne) Insulator
-
-
13
... More
31( f) Splicing & extension of an anchored overhead equipment.
-
-
24
... More
2(bz)Erection: Concrete for foundation and plinth: In other than hard soil and rock (For Concrete mix 0f M-15 and M-20 grading Foundation)
250
180
45000
... More
2(c)(zz)Erection: Concrete for foundation and plinth: RCC grade M-25 for foundation and plinth in other than hard soil and rock.
100
450
45000
... More
8(b) (iii) Supply without Insulator of material for termination o f al l aluminium 25KV Feeder / return conductor (Single SPIDER)
722
5035
3635428.84
... More
11(a)(i) Supply without Insulator of cut-in (9Tonne) Insulator
-
-
11
... More
31(d) Extra on erection rate for work under a power block- Dismantling of overhead equipment.
90
11882
1069402.5
... More
8(b) (iii) Erection without Insulator of material for termination o f all aluminium 25KV Feeder / return conductor (Single SPIDER)
722
900
649800
... More
31(i)Extra on erection rate for work under a power block- Dismantling of an Isolator
-
-
30
... More
2(bz)Supply: Concrete for foundation and plinth: In other than hard soil and rock (For Concrete mix 0f M-15 and M-20 grading Foundation)
250
6930
1732500
... More
2(a)Supply: Concrete for foundation and plinth(ii) In rocky soil (For Concrete Mix of M 10 and M 15 Grade in Foundation)
2000
9324
18648000
... More
2(az)Supply: Concrete for foundation and plinth(ii) In rocky soil (For concrete mix of M 15 and M 20 Grade in Foundation)
250
9702
2425500
... More
11(b) Erection without Insulator of 25 kV Post Insulator
-
-
16
... More
31(a) Erection: Transfer of equipment from one mast or support to another.
-
-
18
... More
2(j)Erection: Concrete for foundation and plinth: Concrete for Cylindrical type side bearing foundations (M-15 and M- 20) (SBC - 11000 kgf/sqm)
80
180
14400
... More
5(a)(i)Erection without insulator and of mounting arrangements for span wire.
-
-
6
... More
8(a) (xii)Marking/paintig o f temperature & 'Y'- Measurement of OHE mast at BWA locations
672
95
63880.32
... More
1(a)Preparation o f designs and drawings for overhead equipment and verification of purchaser's pegging plan.
-
-
1
... More
31(t)(iv) Dismantling of copper jumper
-
-
36
... More
31(t)(iv) Extra on erection rate for work under a power block- Dismantling of copper jumper
946
45
42570
... More
8(b)(i) Supply without insulator of material for termination of Single conductor of Over head equipment or terminating wire.
498
5916
2946372.18
... More
31(e) Extra on erection rate for work under a power block- Dismantling of Feeder/ Return Conductor
100
7129
712935
... More
8(b)(i) Erection without insulator of material for termination of Single conductor of Over head equipment or terminating wire.
498
900
448200
... More
1(d)Supply and installation of SWR boards and Flexi Sheets (Fixed on Decolum Sheets) at nominated places including supply of power block caps.
15
6300
94500
... More
31(t)(iii) Dismantling of anticreep with galvanised Steel wire.
-
-
34
... More
40 - Supply of Number Plates on existing masts
-
-
38
... More
2(az)Erection: Concrete for foundation and plinth(ii) In rocky soil (For concrete mix of M 15 and M 20 Grade in Foundation)
250
450
112500
... More
2(b)Supply: Concrete for foundation and plinth: In other than hard soil and rock(For Concrete mix 0f M-10 and M-15 grading Foundation)
19000
6660
126540000
... More
31(a) Supply: Transfer of equipment from one mast or support to another.
-
-
17
... More
31( f) Extra on erection rate for work under a power block- Splicing & extension of an anchored overhead equipment.
5
675
3375
... More
2©Supply: Concrete for foundation and plinth: Reinforced concrete (M-15 Grade)
-
-
13
... More
2(az) Supply: Concrete for foundation and plinth(i) In hard soil (For concrete mix of M 15 and M 20 Grade in Foundation)
250
8316
2079000
... More
31(gz) Extra on erection rate for work under a power block- Dismantling of a Section Insulator Assembly
90
1125
101250
... More
2(c)(zz)Supply: Concrete for foundation and plinth: RCC grade M-25 for foundation and plinth in other than hard soil and rock.
100
12787
1278720
... More
2(a)Supply: Concrete for foundation and plinth(i) In hard soil: (For Concrete Mix of M 10 and M 15 Grade in Foundation)
1000
7992
7992000
... More
2(cz)Supply: Concrete for foundation and plinth: Reinforced concrete for foundation and plinth in other than hard soil & rock (Grade M-20)
250
10656
2664000
... More
11(b) Supply without Insulator of 25 kV Post Insulator
-
-
15
... More
31(gz) Supply: Dismantling of a Section Insulator Assembly
-
-
26