Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Konkan Railway Corporation Limited - KRCL Tender

Works
Ireps
Opening Date30 Apr 2025
Closing Date21 May 2025
Tender Amount₹ 20,94,74,305.32 
Notes
Download

Costs

Summary

Design, Supply, Erection, Testing And Commissioning Of Ohe Work Including Provision Of Foundations For The Work Of "design, Supply, Erection, Testing And Commissioning

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2(a)Erection: Concrete for foundation and plinth(i) In hard soil: (For Concrete Mix of M 10 and M 15 Grade in Foundation)

1000

180

180000

... More
31(j) Extra on erection rate for work under a power block- Dismantling of a Post/ Pedestal Insulator.

-

-

32

... More
31(i) Dismantling of an Isolator

-

-

29

... More
2(cz)Erection: Concrete for foundation and plinth: Reinforced concrete for foundation and plinth in other than hard soil & rock (Grade M-20)

250

450

112500

... More
31(t)(iii) Extra on erection rate for work under a power block- Dismantling of anticreep with galvanised Steel wire.

448

1350

604800

... More
2(b)Erection: Concrete for foundation and plinth: I n other than hard soil and rock(For Concrete mix 0f M-10 and M-15 grading Foundation)

19000

180

3420000

... More
2©Erection: Concrete for foundation and plinth: Reinforced concrete (M-15 Grade)

-

-

14

... More
2(az) Erection: Concrete for foundation and plinth(i) In hard soil (For concrete mix of M 15 and M 20 Grade in Foundation)

250

180

45000

... More
11(a)(ii)Erection without Insulator of a suspension (9 Tonne) Insulator

-

-

14

... More
5(a)(i)Supply without insulator of mounting arrangements for span wire.

-

-

5

... More
31(gz) Erection: Dismantling of a Section Insulator Assembly

-

-

27

... More
31(p)Dismantlement of drop arms/ booms / temporary masts.

-

-

33

... More
31(j) Dismantling of a Post/ Pedestal Insulator.

-

-

31

... More
2(j)Supply: Concrete fo r foundation and plinth: Concrete for Cylindrical type side bearing foundations (M-15 and M- 20) (SBC - 11000 kgf/sqm)

80

7380

590400

... More
31(d) Dismantling of overhead equipment.

-

-

20

... More
31(a) Extra on erection rate for work under a power block- Transfer of equipment from one mast or support to another.

1344

1188

1596981.12

... More
1(c)Preparation of Station Working Rules and Instructions

-

-

2

... More
40 - Erection of Number Plates on existing masts

-

-

39

... More
11(a)(ii)Supply without Insulator of a suspension (9 Tonne) Insulator

-

-

13

... More
31( f) Splicing & extension of an anchored overhead equipment.

-

-

24

... More
2(bz)Erection: Concrete for foundation and plinth: In other than hard soil and rock (For Concrete mix 0f M-15 and M-20 grading Foundation)

250

180

45000

... More
2(c)(zz)Erection: Concrete for foundation and plinth: RCC grade M-25 for foundation and plinth in other than hard soil and rock.

100

450

45000

... More
8(b) (iii) Supply without Insulator of material for termination o f al l aluminium 25KV Feeder / return conductor (Single SPIDER)

722

5035

3635428.84

... More
11(a)(i) Supply without Insulator of cut-in (9Tonne) Insulator

-

-

11

... More
31(d) Extra on erection rate for work under a power block- Dismantling of overhead equipment.

90

11882

1069402.5

... More
8(b) (iii) Erection without Insulator of material for termination o f all aluminium 25KV Feeder / return conductor (Single SPIDER)

722

900

649800

... More
31(i)Extra on erection rate for work under a power block- Dismantling of an Isolator

-

-

30

... More
2(bz)Supply: Concrete for foundation and plinth: In other than hard soil and rock (For Concrete mix 0f M-15 and M-20 grading Foundation)

250

6930

1732500

... More
2(a)Supply: Concrete for foundation and plinth(ii) In rocky soil (For Concrete Mix of M 10 and M 15 Grade in Foundation)

2000

9324

18648000

... More
2(az)Supply: Concrete for foundation and plinth(ii) In rocky soil (For concrete mix of M 15 and M 20 Grade in Foundation)

250

9702

2425500

... More
11(b) Erection without Insulator of 25 kV Post Insulator

-

-

16

... More
31(a) Erection: Transfer of equipment from one mast or support to another.

-

-

18

... More
2(j)Erection: Concrete for foundation and plinth: Concrete for Cylindrical type side bearing foundations (M-15 and M- 20) (SBC - 11000 kgf/sqm)

80

180

14400

... More
5(a)(i)Erection without insulator and of mounting arrangements for span wire.

-

-

6

... More
8(a) (xii)Marking/paintig o f temperature & 'Y'- Measurement of OHE mast at BWA locations

672

95

63880.32

... More
1(a)Preparation o f designs and drawings for overhead equipment and verification of purchaser's pegging plan.

-

-

1

... More
31(t)(iv) Dismantling of copper jumper

-

-

36

... More
31(t)(iv) Extra on erection rate for work under a power block- Dismantling of copper jumper

946

45

42570

... More
8(b)(i) Supply without insulator of material for termination of Single conductor of Over head equipment or terminating wire.

498

5916

2946372.18

... More
31(e) Extra on erection rate for work under a power block- Dismantling of Feeder/ Return Conductor

100

7129

712935

... More
8(b)(i) Erection without insulator of material for termination of Single conductor of Over head equipment or terminating wire.

498

900

448200

... More
1(d)Supply and installation of SWR boards and Flexi Sheets (Fixed on Decolum Sheets) at nominated places including supply of power block caps.

15

6300

94500

... More
31(t)(iii) Dismantling of anticreep with galvanised Steel wire.

-

-

34

... More
40 - Supply of Number Plates on existing masts

-

-

38

... More
2(az)Erection: Concrete for foundation and plinth(ii) In rocky soil (For concrete mix of M 15 and M 20 Grade in Foundation)

250

450

112500

... More
2(b)Supply: Concrete for foundation and plinth: In other than hard soil and rock(For Concrete mix 0f M-10 and M-15 grading Foundation)

19000

6660

126540000

... More
31(a) Supply: Transfer of equipment from one mast or support to another.

-

-

17

... More
31( f) Extra on erection rate for work under a power block- Splicing & extension of an anchored overhead equipment.

5

675

3375

... More
2©Supply: Concrete for foundation and plinth: Reinforced concrete (M-15 Grade)

-

-

13

... More
2(az) Supply: Concrete for foundation and plinth(i) In hard soil (For concrete mix of M 15 and M 20 Grade in Foundation)

250

8316

2079000

... More
31(gz) Extra on erection rate for work under a power block- Dismantling of a Section Insulator Assembly

90

1125

101250

... More
2(c)(zz)Supply: Concrete for foundation and plinth: RCC grade M-25 for foundation and plinth in other than hard soil and rock.

100

12787

1278720

... More
2(a)Supply: Concrete for foundation and plinth(i) In hard soil: (For Concrete Mix of M 10 and M 15 Grade in Foundation)

1000

7992

7992000

... More
2(cz)Supply: Concrete for foundation and plinth: Reinforced concrete for foundation and plinth in other than hard soil & rock (Grade M-20)

250

10656

2664000

... More
11(b) Supply without Insulator of 25 kV Post Insulator

-

-

15

... More
31(gz) Supply: Dismantling of a Section Insulator Assembly

-

-

26



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.