Directorate Of Purchase And Stores Tender
... More
The DPS has issued a formal invitation for competitive bids for the Directorate Of Purchase And Stores project, for Design, Support, Supply, Installation And Commissioning, Training, Warranty And Amc Of Medical Cyclotron With Turnkey in Raigarh, Maharashtra. The bid opening date for this tender is 07-02-2025 and the last date for bid submission is 27-06-2025. Interested bidders for Directorate Of Purchase And Stores tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Directorate Of Purchase And Stores - DPS Tender
Healthcare and Medicine
Eprocure
Opening Date7 Feb 2025
Closing Date27 Jun 2025
Tender AmountRefer Documents
Costs
EMD
₹ 20,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Design, Support, Supply, Installation And Commissioning, Training, Warranty And Amc Of Medical Cyclotron With Turnkey
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DPS_842466_1Tender No
DPS/CPU/05/B3/2990-TPTTender Authority
Directorate Of Purchase And Stores ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
[Flooring and painting (refer annexure C)] Anti skid tiles flooring and skirting
11.3
-
-
... More
[UHP gas distribution system (refer annexure N)] Gas regulators-double cylinder-Cylinder side as specified in document
5
-
-
... More
[ELV (refer annexure L)] Voltage stabiliser
1
-
-
... More
[Equipment -Medical Cyclotron system] Synthesis Research module
General purpose 18F Radiofluorination module with suitable DUAL VERTICAL or equvivalent Hot Cell
1
-
-
... More
[Radiation monitoring equipment] Personal Pocket dosimeters (digital)
15
-
-
... More
[Equipment -Medical Cyclotron system] Dispenser for Solid target-based RP
One Dispenser for Solid target-based radio-pharmaceuticals with suitable hot cell to handle minimum of 5 Ci of activity.
1
-
-
... More
[UHP gas distribution system (refer annexure N)] Gas regulators taping point- equipment supply side SS 316 L as specified
15
-
-
... More
[Radiation monitoring equipment] Gamma area monitor Gamma area monitor (0-100mR/h)
4
-
-
... More
[Civil (refer annexure D)] Steel Scaffolding
260
-
-
... More
[Civil (refer annexure D)] Soling below foundation
2
-
-
... More
[Civil (refer annexure D)] Plastering
260
-
-
... More
[HVAC (refer annexure J)] AHU
4
-
-
... More
[ELV (refer annexure L)] Cabling and wiring, wiring trenches and concealing
1
-
-
... More
[Furniture (refer annexure I)] stainless steel table with Granite Topping (900 mm Height) Each Unit shall be 8*750mm in length with Storage (Full Length -1, Drawer-CupBoard-2; Drawers-8)
6
-
-
... More
[ELV (refer annexure L)] Power distribution panel for- AHU and chillers
1
-
-
... More
[Furniture (refer annexure I)] Mid Back Synchro Chair or equivalent
10
-
-
... More
[UHP gas distribution system (refer annexure N)] Ultrapure gas distribution system As mentioned in the specification/room book the vendor has to prepare the design of uhp gas system
1
-
-
... More
[Flooring and painting (refer annexure C)] IPS flooring
40
-
-
... More
[Radiation monitoring equipment] Central Radiation monitoring system
System includes software for online data acquisition and backup for six months.
1
-
-
... More
[HVAC (refer annexure J)] Chiller for all four AHU (sufficient for all AHU)
2
-
-
... More
Post warranty - 1st year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Quality Control System] PH reader
1
-
-
... More
[Civil (refer annexure D)] IPS Flooring
700
-
-
... More
[Panelling work (refer annexure B)] terminal HEPA diffusers
25
-
-
... More
[Equipment -Medical Cyclotron system] 18F based synthesis module
Fully automated cassette-based synthesis module with suitable DUAL VERTICAL hotcell or equvivalent to handle 20 Ci of F18 Radioactivity (each working chamber) for routine production of 18F based Radiopharmaceuticals.
3
-
-
... More
cost of essential items- not listed above but required to make the facility fully functional (break up in tabular form should be listed separately)
1
-
-
... More
[Flooring and painting (refer annexure C)] Pu paint (walls, ceiling)
2372
-
-
... More
[Laboratory equipment] Digital weight balance (low range- Accuracy -0.00001 g, preparing reagent for FDG)
1
-
-
... More
[Laboratory equipment] Compact PET re-useable shipping system Vial Pig compatible with the dispenser (shielding capacity 2.5 Ci)
5
-
-
... More
[ELV (refer annexure L)] power distribution panel for cyclotron and other supplied equipments
1
-
-
... More
[UHP gas distribution system (refer annexure N)] 1/4 In Line - SS316L in 6 meters pieces-ultra cleaned required by supplied equipments
150
-
-
... More
[Panelling work (refer annexure B)] Glazing (looking glass)
12
-
-
... More
[Radiation monitoring equipment] Stack monitoring system
NaI detector for on line stack monitoring system
Lead castle for stack monitoring probe
Integrated radiation monitoring computer system with complete cabling up to the top floor of Building.
Stack Monitoring Channel Local Alarm Units
Software System for stack monitoring
Monitor Channel Connection Kit
Spare Parts Kit for stack monitor, Stacking monitor Channels, Area Monitors
1
-
-
... More
[Radiation monitoring equipment]
Hand & Foot monitor
1
-
-
... More
[Equipment -Medical Cyclotron system] Fully Automatic Dispenser (18F)
Fully Automatic Dispenser for vial dispensing with suitable hot cell to handle 20 Ci of F18 Radioactivity
1
-
-
... More
[Quality Control System]
BOD incubator
1
-
-
... More
Post warranty - 9th year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Laboratory equipment] Micro pipette with micro pipette tips box
1
-
-
... More
[Radiation monitoring equipment]
Teletector Dose Rate Probe
2
-
-
... More
[Flooring and painting (refer annexure C)] Kotah stone flooring and skirting
16.5
-
-
... More
[Quality Control System] L-Bench (QC)
L-Bench for QC of PET radioharmaceutical
2
-
-
... More
[Furniture (refer annexure I)] Over head Storage Units (900mm width)
16
-
-
... More
[Civil (refer annexure D)] Brick work above existing wall
90
-
-
... More
[Radiation monitoring equipment] air samplers
2
-
-
... More
[HVAC (refer annexure J)] BMS
1
-
-
... More
Post warranty - 6th year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Panelling work (refer annexure B)] Doors
22
-
-
... More
[Furniture (refer annexure I)] Laboratory Chairs (suitable for 900 mm height working tables)
4
-
-
... More
[Radiation monitoring equipment] Remote probe Survey Neutron Monitor (high Range)
2
-
-
... More
[Quality Control System]
Laminar Flow benches
2
-
-
... More
[Quality Control System]
TLC Scanner
2
-
-
... More
[Radiation monitoring equipment] Remote probe
High Range Gamma monitor with remote probe
4
-
-
... More
[Radiation monitoring equipment] Portable Survey meter
3
-
-
... More
[Quality Control System] MCA Solid state based MCA
1
-
-
... More
Post warranty - 4th year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Lead Shielding (refer annexure K)] Local Shielding by lead brick protective wall. lead thickness 50mm, usable space size inside shield should be minimum 50cmX30cmX30 cm with interlocking bricks
2
-
-
... More
[ELV (refer annexure L)] Internet lines and networking
1
-
-
... More
[Equipment -Medical Cyclotron system] 68Ga based synthesis module Fully automated Synthesis module for Radio labelling of 68Ga produced from Cyclotron with suitable DUAL VERTICAL Hot Cell or equvivalent [Separate prices to be provided with camera and with Pb glass window for the working chambers of the hotcells]
1
-
-
... More
[ELV (refer annexure L)] Telephone lines
25
-
-
... More
[HVAC (refer annexure J)] Aluminum ducting with insulation and finishing (500 meters)
1
-
-
... More
[Laboratory equipment] Waste Gas Decay System
Waste Gas Decay System with four storage tanks
1
-
-
... More
[ELV (refer annexure L)] Earthing pits and earthing connections for all equipments
1
-
-
... More
[Laboratory equipment] Water Purification System
Water purification system to produce HPLC grade water
1
-
-
... More
[Quality Control System] L-Bench L-Bench for target maintainance
1
-
-
... More
[Lead Shielding (refer annexure K)] Lead shield for the trench (delivery lines) For 20 Ci 18F. (The lead cover thickness is to be calculated by the Supplier according to the activities transferred to hot labs without exposure to personnel.)
200
-
-
... More
[Lead Shielding (refer annexure K)] Lead brick box with four partitions with individual doors covered by SS sheet, lead shield thickness 50mm, inside approximate dimension 260mm´210mm´210mm (W´D´H)
1
-
-
... More
[Mechanical (refer annexure M)] Mechanical and sanitary work
1
-
-
... More
[ELV (refer annexure L)] Power distribution panel for- lighting, power points, misc ellaneous
1
-
-
... More
Post warranty - 7th year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Quality Control System] Dose calibrator
Dose calibrator for QC, Lead Shielding
1
-
-
... More
[ELV (refer annexure L)] CCTV -Entire facility
1
-
-
... More
[Laboratory equipment] Fume Hood with anti-blow back valve, approximate dimension 1200mm´ 700mm´1300mm
1
-
-
... More
[Laboratory equipment] Cameras for cyclotron vault
Radioactive Resistant Camera system for cyclotron vault
6
-
-
... More
[ELV (refer annexure L)] Access control
1
-
-
... More
[Laboratory equipment] Ultrasonic cleaner (ss-material rust free, 5 liters capacity)
1
-
-
... More
[Civil (refer annexure D)] Pre cast RCC roof slab over
140
-
-
... More
[Equipment -Medical Cyclotron system] Medical Cyclotron- Bunker Type, unshielded with 4 numbers Niobium Liquid Target for 18F production (Self shielded), 2 numbers Niobium Liquid Target for 68Ga production (Unshielded or Self shielded), 1 number Solid Target ( for production of 64Cu,89Zr, 68Ga) (Unshielded or Self shielded) along with necessary Operator and personnel safety interlock system
1
-
-
... More
[UHP gas distribution system (refer annexure N)] 1/8 In line - SS316L, ultra cleaned – coil required by supplied equipments
550
-
-
... More
[ELV (refer annexure L)] Main power distribution panel
1
-
-
... More
[Civil (refer annexure D)] Dismantling Concrete for window
3
-
-
... More
[Laboratory equipment] Capper & De-capper
1
-
-
... More
[Laboratory equipment] Air Compressing System
Air Compressing System (500 Litres)
2
-
-
... More
[Quality Control System ] HPLC
HPLC with autosampler
1
-
-
... More
[Civil (refer annexure D)] Structural steel-ISMB-500
2700
-
-
... More
[Equipment -Medical Cyclotron system] Solid target irradiation, processing and synthesis system
Solid target processing system with electroplating+Recovery of enriched target+Purification) Automated module for synthesis of radiopharmaceuticals of Zr89,64Cu, with suitable Hot cell (100 mm lead thickness) [Separate prices to be provided for hotcell with camera and hotcell with Pb glass window for the working chambers of the hotcells]
1
-
-
... More
[Panelling work (refer annexure B)] Return air Risers
25
-
-
... More
Post warranty - 5th year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Civil (refer annexure D)] POP coat to plaster area
260
-
-
... More
[HVAC (refer annexure J)] Chillers (25 Tr)
2
-
-
... More
[Civil (refer annexure D)] PCC Below foundation
71
-
-
... More
[Laboratory equipment]
Fixed particle Counter
1
-
-
... More
[Flooring and painting (refer annexure C)] Vitrified tiles flooring
190
-
-
... More
[Civil (refer annexure D)] Terrace waterproofing
120
-
-
... More
Post warranty - 2nd year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Laboratory equipment] Normal Refrigerator 400 litre with two doors
1
-
-
... More
[Civil (refer annexure D)] RCC in foundation
16
-
-
... More
[Laboratory equipment] Tool Kit Tools for maintenance of cyclotron, hot cell, QC equipment and synthesis module including suitable digital multi-meter, digital current meter, best quality soldering iron, best quality drill machine, best quality two digital temperature and two humidity meter
1
-
-
... More
[Lead Shielding (refer annexure K)] Lead Container for target window’s foils storage, lead shield thickness 60mm, height 240mm
1
-
-
... More
[Flooring and painting (refer annexure C)] Pu Flooring
768
-
-
... More
Post warranty - 8th year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Radiation monitoring equipment] Portable gamma dose rate
Portable gamma dose rate meter + Contamination Probe
3
-
-
... More
[UHP gas distribution system (refer annexure N)] 1/2 In Line- SS316L-6 meters pieces-ultra cleaned required by supplied equipments
150
-
-
... More
[Chimney (refer annexure F)] Satisfy AERB requirement-For non return exhaust of Cyclotron vault area, Hotcell area and technical corridor of hotcell area
1
-
-
... More
Post warranty - 3rd year Comprehensive Maintenance Contract (CMC) charges
1
-
-
... More
[Panelling work (refer annexure B)] Door interlocking system
1
-
-
... More
[Civil (refer annexure D)] Extra for lifting and placing Concrete beams
140
-
-
... More
[Radiation monitoring equipment] Portable Survey monitor for neutron
2
-
-
... More
[Furniture (refer annexure I)] Stainless steel table with Granite Topping Corner Unit. Each Unit Shall have 8 Full Length Storage Units
2
-
-
... More
[Panelling work (refer annexure B)] Metallic walk able ceiling panel with aluminum coving and fitting arrangement
609
-
-
... More
[UHP gas distribution system (refer annexure N)] Compressed air line :The vendor has to prepare the design as per requirement.
1
-
-
... More
[Civil (refer annexure D)] Construction of gas bank (2.5 X 4 Sq metres)
10
-
-
... More
[Laboratory equipment] Glassware washing machine
1
-
-
... More
[Laboratory equipment] Medical Refrigerator
~200 litre (upto -30ºC with controllable temperature and capable of 24 hours temp. recording with alarm) for chemicals
1
-
-
... More
[Civil (refer annexure D)] Earthwork excavation in foundation
16
-
-
... More
[Quality Control System] BET system
Endotoxin test system for quality control
1
-
-
... More
[Quality Control System] Gas Chromatography
Gas Chromatography with FID and autosampler
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%