Bridge And Roof Company India Limited Tender

... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Bridge And Roof Company India Limited Tender

Works
Eprocure
Opening Date20 Nov 2023
Closing Date16 Dec 2023
Tender Amount₹ 19,07,96,265 
Notes
Download

Costs

Summary

Erection Of Static And Rotary Equipment Including Heavy And Critical Lifts By Deploying Requisite Capacity Of Cranes (up To 1600 Mt Or Higher) And Also Suitable Trailers Including Prime Movers/pullers, Spmt, Etc.in Connection With Composite Works

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
EQUIPMENT - ROTATING

-

-

-

... More
Safety Supervisor

8

201600

25200

... More
ERECTION OF PRODUCT SPLITTER COLUMN (TAG No.101-CC-5001) SECTIONS: Erection of Product Splitter Column sections (4 Nos.) in dressed-up condition as per job specification, assembly of parts, subassemblies, erection at all elevations, aligning, verticality checking, grouting, tightening of foundation bolts, welding of washer on anchor chairs, holding the section till completion of Welding & PWHT including Site Welds Box Hydrotest, installation of pipe davit, cleaning and flushing by water, draining, drying by compressed air, arranging all tools, tackles, machinery, consumables, erection equipment, instruments, labour, ancillary, etc. to complete the work in all respects as per MDS, drawings, equipment detail, job specifications and instructions of the Engineer-in-Charge. Refer MDS for weight of each dressed up sections to be erected.

1605

92448000

57600

... More
Lead Engineer/Officer - QA/QC

8

439200

54900

... More
Centrifugal Compressor (Gas / Air) Packages with drivers, auxiliaries and accessories.

-

-

-

... More
Lead Engineer - Safety

8

468000

58500

... More
Discipline Engineer

8

252000

31500

... More
Safety Steward / Observer

8

151200

18900

... More
Providing the following personel to BandR with required experience and qualification for the purpose of BandR's work on monthly basis. Note: 1. Contractor shall pay the wages, ESI and EPF to the personel mentioned below. 2. Contractor shall be capable to pay the wages as per tender document timely before 10th of every month from his own resources. 3. The contractor shall be liable for any issues arising in relation to EPF, ESI and shall deal with it taking responsibility of the related procedures. 4. The Contractor has to submit the CV/Resume/Bio-data of the peronel to be deployed for BandR's works and shall deploy the personel only after approval of Engineer-in-Charge. 5. In case, the person employed by the contractor commits any act of omission/commission that amounts to misconduct/indiscipline/ incompetence, the contractor shall be liable to take appropriate disciplinary action against such persons, including their removal from the site of work. 6. The Contractor shall replace immediately any of its personnel found unacceptable to this office because of security risks, incompetence, conflict of interest, improper conduct etc. upon receiving a notice

-

-

-

... More
INSTALLATION OF FREE ISSUE EQUIPMENT: Handling and transportation of Equipment from Owner's storage point to work site/contractor's stores. Assembly of subassemblies, placing the equipment on foundations/structures, levelling, aligning, fixing of foundation bolts, providing (including supply) packing/shim plates, chipping and dressing of foundations, grouting (inclduing supply and applications of grout material), cleaning and flushing of equipment with water, draining and drying with compressed air, erection of inter- connecting piping including some amount of cutting and welding, wherever required. Purging the line with air/gas, installation of insulation in all respects wherever applicable on equipments and piping as per Vendor drawings, application of touch-up paint (if required) after erection and assembly at site, providing manpower for carrying out pre-commissioning, commissioning and testing under the supervision guidance of Manufacturer's/Owner's personnel and rectifying defects, if any and completing the work in all respects as per drawing(s), specifications, scope of work and instructions of engineer in charge for each equipment including drives and accessories listed below :

-

-

-

... More
ERECTION OF DRESSED-UP EQUIPMENT: Transportation of columns and vessels from owner's storage point to work site, dressing up of the column/vessel by contractor , assembly of parts, subassemblies, erection at all elevations, aligning, verticality checking, grouting, tightening of foundation bolts, welding of washer on anchor chairs, arranging all tools, tackles, machinery, consumables, erection of completely dressed-up equipment, & arranging all instruments, labour, ancillary, etc to complete the work in all respects as per drawings, equipment detail, specifications and instructions of the Engineer-in-Charge. Dressing up of column(As applicable as per the requirement of the tender): Supply/Application/installation of insulation, installation of ladders and platforms, installation of piping spool and support (wherever applicable), installation of demister, internal gratings, distributor, pipe davit etc on the Column/Vessel, cleaning and flushing by water, draining, drying by compressed air etc to complete the job in all respects as per the requirements of the specifications & standards attached else where in the tender.

-

-

-

... More
Erection of standalone Ejectors / Ejector and Silencer

-

-

-

... More
Chemical Dosing Packages

-

-

-

... More
Transportation of all Static equipment, Rotating equipment, Mechanical Items, etc. from Site/Store (with 2-3 km radius with Plant area) as per instructions of Engineer-in-charge. Suitable packing shall be included in quoted rates.

2325

16321500

7020

... More
Filter

6.8

156060

22950

... More
EQUIPMENT ERECTION WORKS

-

-

-

... More
Skid mounted chemical dosing packages along with all auxiliaries and accessories.

6

167400

27900

... More
ERECTION OF COLD BOX EQUIPMENT

-

-

-

... More
Transportation of the Ejectors from Owner's storage points to work site and Erection on structure support by bolting, shims etc. including levelling, aligning including connecting nozzles with piping at various elevations and completing the work in all respects as per drawings, specifications and instructions of Engineer-in-Charge.

-

-

-

... More
EQUIPMENT

-

-

-

... More
ERECTION OF PRODUCT SPLITTER COLUMN TAG No. 101-CC-5001

-

-

-

... More
EQUIPMENT ERECTION

-

-

-

... More
Equipment weighing less than 50 MT but 30 MT and above

97

2575350

26550

... More
Centrifugal Compressors with Electric Motor Driver, auxiliaries and accessories.

470

13113000

27900

... More
ERECTION OF COLD BOX EQUIPMENT TAG No. 101-LZ-2004: Transportation of Cold box including structural components, Piping, Piping spools, Emergency vents, Breather Valves, Perlite slide valve assembly, Roof/Pipe Davit, railings, Chico Fiber & Cement etc. from owner's storage point to work site, assembly of parts, subassemblies, erection at all elevations, aligning, verticality checking, grouting, tightening of foundation bolts, welding of washer on anchor chairs, arranging hooks for accessories in Equipment, installation of parts including internals gratings, railings, emergency vents, breather valves, slide valve assembly, distributor, roof/pipe davit, cleaning, flushing, draining, drying as per Cold box supplier instruction, application of Chico Fiber & Cement as per instruction of Cold Box supplier, arranging all tools, tackles, machinery, consumables, transportation equipment, erection equipment including Piping spool erection (wherever applicable), including welding, supporting, testing instruments, skilled & unskilled labour, ancillary, etc. to complete the work in all respects as per drawings, equipment detail, specifications and instructions of the Cold-box supplier or Engineer-in- Charge. Contractor to refer attached Vendor Drawings, Instruction Manuals for further details.

69

2111400

30600

... More
Equipment weighing less than 100 MT but 50 MT and above

669.3

18974655

28350

... More
Equipment weighing less than 30 MT but 10 MT and above

235

5393250

22950

... More
Equipment weighing less than 500 MT but 100 MT and above

856

26193600

30600

... More
Equipment weighing less than 10 MT

141

3235950

22950

... More
Scaffolding Inspector

8

288000

36000

... More
Handling and transportation of Rotating Equipment & miscellaneous items of equipment package from Owner's storage points to work site / contractor's stores, assembly of sub-assemblies, field assembly (as applicable) placing the equipment on foundations, (including some amount of cutting, welding & field joints wherever required), levelling, aligning, fixation of foundation bolts, providing (including supply) packing / shim plates (as applicable), including chipping & dressing of foundations, grouting (including supply and application of grout material, equipment base frame filling as per vendor recommendation with specified grout), cleaning and flushing, draining and drying, purging of lines, and providing manpower and tools / equipment for NDT, testing, carrying out trial and start-up runs and testing under supervision of manufacture's / customer personnel, rectifying defects (if any), insulation (as applicable), precommissioning and commissioning (as applicable) and completing the work in all respects as per drawings, job specifications / scope of work and instructions of Engineer-in-charge for each equipment including drivers and accessories, as listed below. NOTE: Scope also includes erection, fabrication, insulation (as applicable), welding & field joints wherever required, installation & NDT of vendor supplied prefabricated spools / commercial length between various skids of an equipment package (payable at the rate provided against piping SOR items).

-

-

-

... More
EQUIPMENT ERECTION: Transportation of reactors, columns, vessels, silencers, heat exchangers (shell and tube, plate fin, plate) and electric heater etc. from owner's storage point to work site, assembly of parts, subassemblies, erection at all elevations, aligning, verticality checking, grouting, tightening of foundation bolts, welding of washer on anchor chairs, erection of wooden pillow for cold equipments, stacking of multi-tier exchanger(which are stored in unstacked condition), arranging hooks for test ring/ test flanges in heat exchangers, installation of demister, internal gratings, distributor, pipe davit, installation of mixer/agitator, cleaning and flushing by water, draining, drying by compressed air, arranging all tools, tackles, machinery, consumables, transportation equipment, erection equipment, instruments, labour, ancillary, etc. to complete the work in all respects as per drawings, equipment detail, specifications and instructions of the Engineer-in-Charge.

-

-

-

... More
NON-SHRINK GROUT : Supply and laying non-shrinking cementitious grout with a minimum crushing strength of 40 N/mm2 under all static and rotating equipments, etc. including cleaning of surfaces, form-works, chamfering of edges, smoothing of exposed surfaces, providing all tools and labour necessary to complete the work as per drawings / specifications and as directed by Owner / EIC. The non shrink grout shall be laid as per approved vendor's specification.

15

675000

45000

... More
DRESSING UP OF PRODUCT SPLITTER COLUMN (TAG No. 101-CC-5001) SECTIONS: installation of ladders and platforms, installation of piping spool and support (wherever applicable) to complete the job in all respects as per the requirements of the job specifications & standards attached elsewhere in the tender.

30

486000

16200

... More
Equipment weighing less than 10 MT

6

137700

22950

... More
Equipment(Dressed-up) weighing less than 500 MT but 100 MT and Above

229

7007400

30600

... More
EQUIPMENT - STATIC

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.