Andaman Lakshadweep Harbour Works Tender

... More
The ALHW has issued a formal invitation for competitive bids for the Andaman Lakshadweep Harbour Works project, for Maintenance Of Eastern Side Jetty Handrail, Handrail Post, Lightpost, Gi Pipe Handrails Of Low Landing, Fabrication Of Jetty Gate, Repair Of Gangway Etc Of Jetties At Amini in Lakshadweep, with an estimated contract value of Rs. 12,48,881. The bid opening date for this tender is 04-11-2024 and the last date for bid submission is 27-11-2024. Interested bidders for Andaman Lakshadweep Harbour Works tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Andaman Lakshadweep Harbour Works - ALHW Tender

Opening Date4 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 12,48,881 
Notes
Download

Costs

Summary

Maintenance Of Eastern Side Jetty Handrail, Handrail Post, Lightpost, Gi Pipe Handrails Of Low Landing, Fabrication Of Jetty Gate, Repair Of Gangway Etc Of Jetties At Amini

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Applying cement primer of approved brand one coat over the wall including all labour charges, materials and minor tools etc. completed.

200

-

-

... More
Lifting giant tyre fender of various size from sea bed spreaded along permises of Eastern side jetty berthing face of draught about 9 M to 15 M and shifting to the stack yard with in a KM including hire charges of Fork Lift /JCB crane, all diving equipments, tackels, safety measures, transportation charges, all labour charges etc., complete as per the direction of Engineer-In- Charge.

36

-

-

... More
Fabrication and fixing of MS.rod for Hand rail, Hand rail post and low landing but including cost of all materials, cost of Ms rods, cost of all labour charges and minor tools etc. completed.

11

-

-

... More
Painting two coats synthetic enamel paint over the steel surface after cleaning the surface including cost of all materials, labour charges, minor tools etc. complete.

70

-

-

... More
Re-arranging the dislocated Giant tyre fenders of the berthing face of eastern side jetty due to the regular berthing of cargo and passenger ship by removing D shackle lifting and placing the giant tyre over the berthing jetty re arranging the GI chaines attending minor repairs to the chaine by cutting / adding pieces, chainging the damaged D shackles with new placing the tyres back on the berthing face as directed by the EIC locking to the U bolt with D schackles including cost of all labour charges, hire charges of crane, etc., minor tools but excluding cost of all materials such as GI chaine D schackle wire rope etc., which will be supplied free of cost of as per actual site requirements etc., complete.

72

-

-

... More
Painting two coats with ready mixed acrylic plastic emulsion paint (extra) antifunges for jetty hand rail post etc. including cost all labour charges, materials etc., complete.

954

-

-

... More
Providing form work including centering, shuttering so as to give a rough finish strutting and proping etc. height of proping & centering for hand rails and hand rail posts and removal of the same for in situ reinforced cement concrete & plain concrete work including cost of all labour charges minor tools and cost of centering materials etc. complete.

205

-

-

... More
Providing fixing of giant tyre as fender at eastern side berthing jetty inclduing transporting to eastern side from store yard, cutting GI chain to suitable length fixing in position to hooks provided on jetty to correct length and level through the eyelets of tyre fixing with D shackle etc., As directed by the EIC incldung cost of all labour charges, hire charges of crane but excluding cost of all materials. which will be supplied by the department as per the actual site requirement.

48

-

-

... More
Providing and laying RCC 1:1.5:3 for RCC handrails, handrail post, Lamp post, beam, short column, deck slab etc including cost of all mateirals, all labour charges, etc., complete.

11

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.