Andaman Lakshadweep Harbour Works Tender
... More
The ALHW has issued a formal invitation for competitive bids for the Andaman Lakshadweep Harbour Works project, for Maintenance Of Eastern Side Ramp At Kdamath-2024-2025 in Lakshadweep, with an estimated contract value of Rs. 2,85,617. The bid opening date for this tender is 22-07-2024 and the last date for bid submission is 01-08-2024. Interested bidders for Andaman Lakshadweep Harbour Works tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Andaman Lakshadweep Harbour Works - ALHW Tender
Opening Date22 Jul 2024
Closing Date1 Aug 2024
Tender Amount₹ 2,85,617
Costs
EMD
₹ 5,712Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Maintenance Of Eastern Side Ramp At Kdamath-2024-2025
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ALHW_817388_1Bid Award Id
ViewTender No
DCE/KVT/DB/T-28/2024-25/1134 Date-19.7.2024Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Locking 2/3 Giant tyre fenders together with chane / wire rope firmly to one another through the eyelets and providing clamps to the wire rops after tighting to the required level including cost of all labour charges minro tools etc., but excluding cost of all materials which will be supplied by the department free of cost as per the actual site requirements.
20
-
-
... More
Lifting giant tyre fender of various size from sea bed spreaded along permises of Eastern side jetty berthing face of draught about 9 M to 15 M and shifting to the stack yard with in a KM including hire charges of Fork Lift /JCB crane, all diving equipments, tackels, safety measures, transportation charges, all labour charges etc., complete as per the direction of Engineer-In- Charge.
36
-
-
... More
Painting two coats synthetic enamel paint over the steel surface after cleaning the surface including cost of all materials, labour charges, minor tools etc. complete.
70
-
-
... More
Re-arranging the dislocated Giant tyre fenders of the berthing face of eastern side jetty due to the regular berthing of cargo and passenger ship by removing D shackle lifting and placing the giant tyre over the berthing jetty re arranging the GI chaines attending minor repairs to the chaine by cutting / adding pieces, chainging the damaged D shackles with new placing the tyres back on the berthing face as directed by the EIC locking to the U bolt with D schackles including cost of all labour charges, hire charges of crane, etc., minor tools but excluding cost of all materials such as GI chaine D schackle wire rope etc., which will be supplied free of cost of as per actual site requirements etc., complete.
72
-
-
... More
Providing and laying PCC with 1:2:4 mix (1cement, 2 Msand, 4 20mm chips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips) transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete.
8
-
-
... More
Dismantling of existing damaged concretes of slab, longitudinal beams, cross beams, hand rails, electric posts, low landings, screen walls, midtie beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy mechinaries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete.
4
-
-
... More
Providing fixing of giant tyre as fender at eastern side berthing jetty inclduing transporting to eastern side from store yard, cutting GI chain to suitable length fixing in position to hooks provided on jetty to correct length and level through the eyelets of tyre fixing with D shackle etc., As directed by the EIC incldung cost of all labour charges, hire charges of crane but excluding cost of all materials. which will be supplied by the department as per the actual site requirement.
48
-
-
... More
Painting two coats with ready mixed acrylic plastic emulsion paint (extra) antifunges for jetty hand rail post etc. including cost all labour charges, materials etc., complete.
32
-
-
... More
Centering and shuttering for wearing coat etc including cost of all materials (Cement, M Sand, 20mm Chips), form work, transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools as per the direction of EIC etc complete.
8
-
-