Andaman Lakshadweep Harbour Works Tender
... More
The ALHW has issued a formal invitation for competitive bids for the Andaman Lakshadweep Harbour Works project, for Attending Major Steel Repaire Works To Grab Dredger Gd Pushkar At Kavaratti in Lakshadweep, with an estimated contract value of Rs. 1,15,86,696. The bid opening date for this tender is 04-10-2024 and the last date for bid submission is 25-10-2024. Interested bidders for Andaman Lakshadweep Harbour Works tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Andaman Lakshadweep Harbour Works - ALHW Tender
Civil And Construction
Eprocure
Opening Date4 Oct 2024
Closing Date25 Oct 2024
Tender Amount₹ 1,15,86,696
Costs
EMD
₹ 2,31,740Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ALHW_829310_1Bid Award Id
ViewTender No
DCE/KVT/DB/T-53/2024-25/1683 Dated 04.10.2024Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cleaning with cotton waste the newly fabricated ms plates, angles, cabin side, pipes, etc and painting one coat of standard marine quality primer paint and two coats of standard marine quality SE Paint over primer coat including cost of all labour charges, cost of paints, painting brushes, cotton waste, minor tools etc; complete
1650
-
-
... More
Replacing the damaged cabin top & side sheets of G.D. PUSHKAR (sheet metal work) with 2 mm G.I. sheet by cutting and welding as per the original size, shape and design of the crane cabin without any deviation in alignment as directed by the Engineer in charge including cost of all labour charges, G.I. sheet, tools & plants etc; complete.
50
-
-
... More
Providing 3 Nos. cabin glass 1 No. front 2 Nos. side (one set) of machinery housing side glasses with appropriate sizes laminated safety (toughened) or acrylic glasses and replacing rubber beadings or aluminum channel for all glasses etc as directed by the Engineer in charge including cost of all materials, labour charges etc, complete
1
-
-
... More
Supply and fixing of anodes of Zinc Alloy (IS code 8062 (Part-IV) -1979) of size 3.5' x 1.5' x 12' with four legs in a zigzag manner over the outer submerged surface below water level of Pontoon as directed by Engineer In Charge including cost of all labour charges, minor tools, cost of Sacrificing Zinc Anode size 3.5' x 1.5' x 12', transportation charges of materials etc., complete.
20
-
-
... More
Supply & Fixing of suitable all old truck tyres as fenders in the sides of barge with G.I Chain & D-shackles etc. just above water level of Pontoon as directed by Engineer In Charge including cost of all labour charges, minor tools, cost of tyre fenders, transportation charges of materials etc., complete
12
-
-
... More
Cutting and removing the complete rusted portion of steel pontoon and boom of G.D. PUSHKAR by using gas cutting & making the structure surface perfect in level to facilitate fabricate new structurals & M.S plate without any deviation in original alignment and design, stacking the cut pieces and removed structurals / materials within a lead of 50 mts as directed by the Engineer in charge including cost of all labour charges, cutting materials, transportation charges etc, complete
600
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements