Public Works Department Tender

... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Completion Of Balance Work Of Construction Of Balance Work Of Council Secretraite At Khurbathang By Way Of Allied Work For Lift in Kargil, Ladakh, with an estimated contract value of Rs. 2,50,000. The bid opening date for this tender is 17-05-2025 and the last date for bid submission is 28-05-2025.Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Works Department - PWD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 May 2025
Closing Date28 May 2025
Tender Amount₹ 2,50,000 
Notes
Download

Costs

Summary

Completion Of Balance Work Of Construction Of Balance Work Of Council Secretraite At Khurbathang By Way Of Allied Work For Lift

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Distempering with 1st quality acrylic distemper (ready mixed)having VOC content less than 50 gms/litre, two or more coats on new work of approved manufacturer, of required shade and colour complete as permanufacturer’s specifications

41.76

89

3746.7072

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed withwater proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.

24.53

528

12952.5759

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1.02

12097

12339.4296

... More
Demolishing brick work manually means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:15.7.4 In cement mortar

3.06

1481

4531.8906

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.

427.9

114

48994.549999999996

... More
Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform

6.69

773

5175.0495

... More
Demolishing R.C.C.work manually /by mechanical means including stacking of steel bars and disposal of unserviceable material within 50metres lead as per direction of Engineer - in- charge

1.02

2556

2607.1812

... More
Extra for cutting reinforcement bars manually/by mechanical means in R.C.C. orR.B. work (Payment shall be made on the cross sectional area of R.C.C.or R.B. work) as per direction of Engineer-in-charge.

1

958

958.72

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting

75

125

9429.75



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.