The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Construction Of New Passive Type At Council Model Gms Wakha By Way Of Construction Of Ground Floor Up To Slab Level. in Kargil, Ladakh, with an estimated contract value of Rs. 88,19,000. The bid opening date for this tender is 17-05-2025 and the last date for bid submission is 28-05-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 1,76,380Document Cost
₹ 885Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_16325_8Tender No
E Tender 20 of PW RnB Division 2nd KargilTender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://jkpwdrb.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Hard rock @10%
191
1065
203558.25
... More
Excavation work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
-
-
-
... More
ALL KINDS OF SOIL @ 60%
163.26
433
70818.92279999999
... More
ORDINARY ROCK @ 40%
65.3
959
62671.022
... More
Filling available excavated earth (excluding rock) in trenches plinth, sides of foundation etc in layer not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead upto 50cm and lead up to 50 m and lift upto
1.5 mtr.
201.23
214
43151.7612
... More
Dry stone pitching (any thickness) excluding cost of stones.
24.66
523
12900.878999999999
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)Mud Mat
24.66
5570
137361.8718
... More
Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (crushed)
341.68
6427
2196021.7784
... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
127.72
10801
1379573.9659999998
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of
grade Fe-500D or more.
15327
106
1630332.99
... More
Centering and shuttering including shuttering propping etc and removal of form for Foundation,footing bases of columns etc for mass concrete.
540.47
297
160984.3942
... More
Centering and shuttering including shuttering propping etc and removal of form for Columns, pillars, piers, abutments,
posts and struts.
111.63
748
83519.33339999999
... More
Centering and shuttering including shuttering propping etc and removal of form for Lintel, beams, plinth beams, girders,bressumers and cantilevers.
270.23
585
158271.00870000003
... More
Suspended floor, roofs
276.14
718
198442.4882
... More
Edge of slab
93.9
259
24344.514
... More
Walls any thickness
279.1
618
172547.99300000002
... More
Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete
20.19
13732
277250.0895
... More
Providing & fixing Stabilized mud concrete solid blocks (adobe) with 3% cement,
masonry up to floor five level including hoisting and setting in position in mud
mortar using approved quality mud with carriage of material complete.
54.25
5957
323192.205
... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or dash fastener shall be paid
for seperately) 2nd class kail wood
6.3
99064
624109.122
... More
Providing and fixing traditionally carved wood work (Shingstak) over doors and
windows including all accessories as per the direction of the Engineer in-charge,
complete with; Budloo wood
22.64
13779
311962.4464
... More
Disposal of excavated Earth an avg lead of 4 KM by Mt.
1337.01
225
301589.3457