Power Development Department Tender
... More
The PDD has issued a formal invitation for competitive bids for the Power Development Department project, for Supply Installation Testing And Commissioning For Single Phase Lt Extension in Leh, Ladakh. The bid opening date for this tender is 28-05-2025 and the last date for bid submission is 05-06-2025. Interested bidders for Power Development Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 4,000Document Cost
₹ 300Tender Fee
Refer Documents
Summary
Supply Installation Testing And Commissioning For Single Phase Lt Extension
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PDNRE_16422_1Tender No
e-NIT No. 34 of ED Leh of 2025-26 dated 28-05-2025Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
30mm² ACSR Conductor
0.6
1
-
... More
16kN Polymer Shackle Insulators
10
1
-
... More
Galvinized Nuts and Bolts.
5
1
-
... More
Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
5
1
-
... More
Red Oxide
5
1
-
... More
Aluminium Paint
5
1
-
... More
Cement bottoming 1:2:4 mix as per REC standards .45cum /pole
5
1
-
... More
Single phase Energy Meter
1
1
-
... More
Servie Line 2Core 10sqmm cable
25
1
-
... More
Installation/Commissioning/Testing (Labour part)
-
-
-
... More
8 Mtr. Long Pole( ST-410 SP15)
5
1
-
... More
GI Channel X ARM (75X40X6mm) 2ft along with GI Clamp, 50x8mm, (2ft=8Kg, 1 No. clamp=0.83Kg = total weight = 4.83 kg)
30
1
-
... More
30mm² ACSR Conductor
0.6
1
-
... More
16kN Polymer Shackle Insulators
10
1
-
... More
Galvinized Nuts and Bolts.
5
1
-
... More
Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
5
1
-
... More
Red Oxide
5
1
-
... More
Aluminium Paint
5
1
-
... More
Cement bottoming 1:2:4 mix as per REC standards .45cum /pole
5
1
-
... More
Single phase Energy Meter
1
1
-
... More
Servie Line 2Core 10sqmm cable
25
1
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements