Power Development And Non Renewable Energy Tender
... More
The Power Development And Non Renewable Energy has issued a formal invitation for competitive bids for Complete Development Of Power Department Complex In Choglamsar Leh Which Includes Landscaping in Leh, Ladakh, with an estimated contract value of Rs. 13,58,000. The bid opening date for this tender is 04-06-2025 and the last date for bid submission is 10-06-2025. Interested bidders for Power Development And Non Renewable Energy tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
Refer DocumentsDocument Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PDNRE_16489_1Tender No
NIT-11-CD-II/PDC/L/2025-26Tender Authority
Power Development And Non Renewable Energy ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/ vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density (including loading unloading and haulage complete job including carriage complete
32.75
-
-
... More
Providing and laying in position cement, concrete of specified grade excluding the cost of centering, shuttering finishing with 1:4:8(1cement:4coarse sand:8graded stone aggregate 20 mm nominal size)
32.75
-
-
... More
Providing and laying in position specified grade of reinforced cement, concrete of excluding the cost of centering, shuttering finishing with 1:1.5:3(1cement: 1.5coarse sand: 3graded stone aggregate 20 mm nominal size)
43.66
-
-
... More
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete, thermo mechanically treated bars.
1600
-
-
... More
Centering and shuttering including strutting propping etc and removal of form for
8.78
-
-
... More
Fabrication, installation, painting and fixing of basketball post and accessories (1 pair - 2 Nos) complete job
Each no consisting of : 1. Acrylic fibre board = size = 1.80m x 1.22m of 30mm thickness 2. Board supporting frame =L angle size of 20mm x 30mmx3mm thickness 3. MS ring with net = 0.45m dia and thickness of ring is 20mm
4. Acrylic board fixed with MS plate size of 200mm x200mm x3mm thick with supporting 4 no. of anchor bolts
5. Basket ball hoop (post) of SHS of size 200mmx200mmx4mm thick with supporting MS plate size of 400mm x400mm x12mm with 4 no of anchor bolts 16mm dia with length 600mm (drawing enclosed) 6. M20 grade Cement concrete anchors for fixing of posts
1
-
-
... More
Forming groove for construction joints with uniform size in the top layer of concrete as per approved pattern of panels and finishing the groove complete as per specification (panel size :3x3m and groove size 6mm X20mm)
250
-
-
... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On concrete work
437.1
-
-
... More
Carriage of materials By Mechanical Transport including loading, unloading and stacking. Cement avg by MT 5Km
21.62
-
-
... More
Carriage of materials By Mechanical Transport including loading, unloading and stacking. Sand and aggregates avg by MT 10 Km
143.55
-
-
... More
Carriage of materials By Mechanical Transport including loading, unloading and stacking by MT for an avg of 15 Km a) stones
17.71
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%