Power Development And Non Renewable Energy Tender
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 25,00,000Document Cost
₹ 25,000Tender Fee
Refer Documents
Summary
Design, Supply, Installation And Commissioning Of Grid Connected/hybrid
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDNRE_13096_1Bid Award Id
ViewTender No
NIT-EPDK-03 of 06/2024, dt 19/06/2024Tender Authority
Power Development And Non Renewable Energy ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
SITC of 25kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 50no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 25kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 1500 mtr. 7) 1C x 10 sqmm AC Copper cable = 150 mtr. 8) MC4 connectors = 75 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 15 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 5 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
1
-
-
... More
SITC of 20kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 40no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5)20kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 1200 mtr. 7) 1C x 10 sqmm AC Copper cable = 120 mtr. 8) MC4 connectors = 60 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 12 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
6
-
-
... More
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 15kW, 48 volt solar MPPT On Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 9000 mtr. 7) 1C x 10 sqmm AC Copper cable = 90 mtr. 8) MC4 connectors = 45 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 9 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 3 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
10
-
-
... More
SITC of 10kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 10kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 600 mtr. 7) 1C x 10 sqmm AC Copper cable =60 mtr. 8) MC4 connectors = 30 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 6 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
88
-
-
... More
SITC of 8kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 8kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 480 mtr. 7) 1C x 10 sqmm AC Copper cable = 48 mtr. 8) MC4 connectors = 24 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 5 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
6
-
-
... More
SITC of 5kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 5kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 300 mtr. 7) 1C x 10 sqmm AC Copper cable = 30 mtr. 8) MC4 connectors = 15 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 3 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
105
-
-
... More
SITC of 3kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 50kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 200 mtr. 7) 1C x 10 sqmm AC Copper cable = 25 mtr. 8) MC4 connectors = 15 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 3 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
196
-
-
... More
HYBRID
-
-
-
... More
SITC of 20kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 40 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 20kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 32 no. 7) 1C x 4 sqmm DC copper cable = 1200 mtr. 8) 1C x 10 sqmm AC Copper cable = 120 mtr. 9) MC4 connectors = 60pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 12 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
1
-
-
... More
SITC of 10kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 10kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 16 no. 7) 1C x 4 sqmm DC copper cable = 600 mtr. 8) 1C x 10 sqmm AC Copper cable = 60 mtr. 9) MC4 connectors = 30pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
1
-
-
... More
SITC of 5kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC =10 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 5kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 8 no. 7) 1C x 4 sqmm DC copper cable = 300 mtr. 8) 1C x 10 sqmm AC Copper cable = 30 mtr. 9) MC4 connectors = 15 pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
2
-
-
... More
SITC of 3kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC =6 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 3kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 4 no. 7) 1C x 4 sqmm DC copper cable = 200 mtr. 8) 1C x 10 sqmm AC Copper cable = 25 mtr. 9) MC4 connectors = 15 pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
34
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements