Power Development And Non Renewable Energy Tender
... More
The Power Development And Non Renewable Energy has issued a formal invitation for competitive bids for Design, Supply, Installation And Commissioning Of Grid Connected/hybrid in Kargil, Ladakh, with an estimated contract value of Rs. 19,17,30,000. The bid opening date for this tender is 19-06-2024 and the last date for bid submission is 30-07-2024. Interested bidders for Power Development And Non Renewable Energy tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Power Development And Non Renewable Energy Tender
Opening Date19 Jun 2024
Closing Date30 Jul 2024
Tender Amount₹ 19,17,30,000
Costs
EMD
₹ 25,00,000Document Cost
₹ 25,000Tender Fee
Refer Documents
Summary
Design, Supply, Installation And Commissioning Of Grid Connected/hybrid
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDNRE_13096_1Bid Award Id
ViewTender No
NIT-EPDK-03 of 06/2024, dt 19/06/2024Tender Authority
Power Development And Non Renewable Energy ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
SITC of 8kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 8kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 480 mtr. 7) 1C x 10 sqmm AC Copper cable = 48 mtr. 8) MC4 connectors = 24 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 5 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
6
-
-
... More
SITC of 3kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC =6 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 3kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 4 no. 7) 1C x 4 sqmm DC copper cable = 200 mtr. 8) 1C x 10 sqmm AC Copper cable = 25 mtr. 9) MC4 connectors = 15 pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
34
-
-
... More
SITC of 5kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 5kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 300 mtr. 7) 1C x 10 sqmm AC Copper cable = 30 mtr. 8) MC4 connectors = 15 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 3 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
105
-
-
... More
SITC of 40kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 80no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 40kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 2400 mtr. 7) 1C x 10 sqmm AC Copper cable = 240 mtr. 8) MC4 connectors = 120 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 24 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 8 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
2
-
-
... More
SITC of 20kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 40 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 20kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 32 no. 7) 1C x 4 sqmm DC copper cable = 1200 mtr. 8) 1C x 10 sqmm AC Copper cable = 120 mtr. 9) MC4 connectors = 60pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 12 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
1
-
-
... More
HYBRID
-
-
-
... More
SITC of 35kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 70 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 35kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 2100 mtr. 7) 1C x 10 sqmm AC Copper cable =210 mtr. 8) MC4 connectors = 105 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 21 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 7 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
2
-
-
... More
SITC of 10kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 10kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 600 mtr. 7) 1C x 10 sqmm AC Copper cable =60 mtr. 8) MC4 connectors = 30 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 6 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
88
-
-
... More
SITC of 3kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 50kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 200 mtr. 7) 1C x 10 sqmm AC Copper cable = 25 mtr. 8) MC4 connectors = 15 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 3 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
196
-
-
... More
SITC of 10kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 10kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 16 no. 7) 1C x 4 sqmm DC copper cable = 600 mtr. 8) 1C x 10 sqmm AC Copper cable = 60 mtr. 9) MC4 connectors = 30pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
1
-
-
... More
ON GRID ROOFTOP SOLAR
-
-
-
... More
SITC of 20kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 40no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5)20kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 1200 mtr. 7) 1C x 10 sqmm AC Copper cable = 120 mtr. 8) MC4 connectors = 60 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 12 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements