Vaidyaratnam Ayurveda College Tender
... More
The Vaidyaratnam Ayurveda College has issued a formal invitation for competitive bids for Vaidyaratnam Ayurveda College, Ollur, Thrissur-academic Block Phase-iv Civil Construction Work in Thrissur, Kerala, with an estimated contract value of Rs. 50,00,000. The bid opening date for this tender is 30-05-2024 and the last date for bid submission is 25-06-2024. Interested bidders for Vaidyaratnam Ayurveda College tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 50,000Document Cost
₹ 2,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DAME_673839_1Bid Award Id
ViewTender No
B1/500/2024/VACTender Authority
Vaidyaratnam Ayurveda College ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
5.33.2 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge ( Above Plinth Up To Second Floor Slab)
116.47
-
-
... More
5.9.6 Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts
201.6
-
-
... More
5.9.5 Centering and shuttering including strutting,
propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
286.57
-
-
... More
5.9.7 Centering and shuttering including strutting,
propping etc. and removal of form for Stairs, (excluding landings) except spiral-staircases
43.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements